USE AND MAINTENANCE MANUAL Machine : Filling machine Type : VMF-L Year : 2011 (edition 04-11) SAFETY STANDARDS CE TRASPORT AND INSTALLATION GENERAL INFORMATION, DESCRIPTION AND SAFETY DEVICES USE MANUAL VIDEO PAGES OF THE CONTROL PANEL MACHINE MAINTENCE DIAGRAMS VOLUME SPARE PARTS VOLUME MACHINE DISMANTLING MANUAL ATTACHMENTS Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com General introduction The company Teknoice S.r.l. designed and built this machine according to the rules of the EU Directive 2006/42/EC. The machine is not dangerous for the operator, if used according to the supplied instructions of the company Teknoice S.r.l. under the conditions of use. Also safety devices must be kept always efficient and maintenance operations must be performed as required, according to the indicated frequency. This manual should be kept throughout the life of the machine and should always be available for the operator and maintenance engineer. The information contained in this manual are the property of Teknoice s.r.l. The company Teknoice S.r.l. reserves the right to change, without notice, product features described in this manual. It’s forbidden to distribute and reproduce, even partially, this manual without written permission of the company Teknoice S.r.l. Technical service Teknoice S.r.l. Via Lazio, 37 20090 Buccinasco (MI) Italy Tel. 0039.02.4886761 Fax 0039.02.4882153 Web www.teknoice.com Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com Responsibilities of the Manufacturer The Manufacturer Teknoice S.r.l. delivers to the buyer the goods in conformity with the laws of Italy. It is understood that any liability arising from goods, for events after the transfer of risks to the buyer, including any damage to persons or things (even when they are accessory parts or elements of the work center of Teknoice s.r.l.) will be exclusively charged to the buyer, who shall indemnify the seller and also undertakes to ensure any relative risk in a proper way, without right of recourse against the manufacturer. Limitation of Liability of the Manufacturer Unless fraud or gross negligence of the Manufacturer, any compensation for any damage to the buyer may not exceed the share value of the machinery of the company Teknoice S.r.l. regarding to the defective part. Note for users Every care has been taken in the realization and verification in order that the information contained in this document would be complete, accurate and updated. However, the company Teknoice S.r.l. cannot provide any guarantee on the performance and results achieved by the use of this documentation and cannot be considered responsible for damages or benefits arising from improper use of this documentation and devices to which it relates. The same applies to any person or company involved in the creation, production and distribution of this documentation. The company Teknoice S.r.l. also cannot guarantee that changes or updates to software or devices, supplied by the third parties, to which this documentation refers, will be compatible with the information contained in the documentation and will not modify the instructions and data. General safety The company Teknoice S.r.l. cannot be held responsible for injuries and damages of any kind occurring to persons, property or otherwise, caused by improper use or abuse of the machine. Modification / removal of equipment of the machine or modification / removal of guards and safety devices provided by the company Teknoice s.r.l., lead to the immediate loss of warranty. All the control devices are active only when all guards and safety devices work properly. Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com Warranty The company Teknoice S.r.l. guarantees the machine for a period of 12 months from date of shipment, referring to a shift of 8 working hours per day. The company Teknoice S.r.l. should replace or repair any defective part during this period. The warranty is limited to replacement or repair of defective part, not including delivery or labor costs. The warranty does not cover parts subjected to wear, such as bushings, bearings, seals etc. If a failure or damage of the machine is caused by its misuse or tampering, by the intervention of unauthorized technicians or use of not original spare parts, the warranty expires. The company Teknoice S.r.l. has no other obligations or fulfillments as for mentioned above. For any technical communication with the company Teknoice Srl always make use of the following communication form. Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com Communication form CAUTION Fulfill the top of the form and use the fulfilled page as original copy which should be duplicated and used for the communication with the company Teknoice S.r.l. Machine model: Installation date: Serial number: Order number: Description of the problem/defect : ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ Communication Date: date: Signature and Working hours: stamp: Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com DECLARATION OF CONFORMITY CE (in conformity with the Attachment II A – machine – of the Directive 2006/42/CE on Machinery) The company Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153, Declares under its responsibility that the concerned machine or system: Order nr XXX.XXX consisting of the following groups : Type Q.ty Serial number Code Year 2011 2011 2011 2011 COMPLIES WITH: the Directive 2006/42/CE on Machinery (as amended); the Directive 2004/108/CE (as amended); the Directive 2006/95/CE (as amended). The signer of the Declaration of Conformity CE and who builds up the Technical Manual: Surname : Teknoice S.r.l Name : Location : Buccinasco Date : ___________ ___________________ Signature : Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com Teknoice S.r.l. - Via Lazio, 37 - 20090 Buccinasco (MI) - Italy Tel. 0039.02.4886761 - Fax 0039.02.4882153 - Web www.teknoice.com EC standards Machine : FILLING MACHINE Type : VMF-L EC Standards Filling machine VMF-L Page 1 Volume 01_ECS_Language _Rev.00 EC standard INDEX OF CHAPTER EC STANDARDS .................................................... ...................................................................................................... .......................................................................................... 1 EC STANDARDS: ACCORDING TO DIRECTIVES 2006/42 EC AND SUBSEQUENT AMENDMENTS .................... 3 1.1.1 DEFINITIONS ................................................................................................................................................. 3 1.1.2 PRINCIPLES OF INTEGRATION OF SAFETY .............................................................................................. 3 1.1.3 MATERIAL AND PRODUCT........................................................................................................................... 4 1.1.4 LIGHTING ....................................................................................................................................................... 4 1.1.5 DESIGN OF THE MACHINE FOR TRANSPORTATION PURPOSES ........................................................... 4 1.2.1 SAFETY AND RELIABILITY OF THE CONTROL SYSTEMS......................................................................... 4 1.2.2 CONTROL DEVICES...................................................................................................................................... 4 1.2.3 START-UP ...................................................................................................................................................... 5 1.2.4 STOP DEVICES ............................................................................................................................................. 5 REGULAR STOP ............................................................................................................................................... 5 EMERGENCY STOP ......................................................................................................................................... 5 1.2.5 OPERATING MODE SELECTOR SWITCH.................................................................................................... 5 1.2.6 CONTROL DEVICES...................................................................................................................................... 5 1.2.7 MALFUNCTION OF THE CONTROL CIRCUIT .............................................................................................. 6 1.2.8 SOFTWARE.................................................................................................................................................... 6 1.3.1 STABILITY ...................................................................................................................................................... 6 1.3.2 RISKS OF BREAKAGE DURING OPERATION ............................................................................................. 6 1.3.3 RISKS DUE TO OBJECTS FALLING OR BEING THROWN.......................................................................... 6 1.3.4 RISKS DUE TO SHARP EDGES AND SURFACES....................................................................................... 6 1.3.5 PREVENTION OF RISKS DUE TO MOVING PARTS .................................................................................... 6 1.3.6 SELECTIONS FOR A PROTECTION AGAINST RISKS DUE TO MOVING PARTS...................................... 7 1.4.1 GENERAL REQUIREMENTS ......................................................................................................................... 7 1.4.2 PARTICULAR REQUIREMENTS FOR SAFETY ............................................................................................ 7 1.4.2.1 FIXED GUARDS .................................................................................................................................... 7 1.4.2.2 MOVING GUARDS ................................................................................................................................ 7 1.4.2.3 ADJUSTABLE GUARDS THAT LIMIT ACCESS.................................................................................... 7 1.5.1 RISKS DUE TO ELECTRICITY ...................................................................................................................... 7 1.5.3 RISKS DUE TO DIFFERENT ENERGY.......................................................................................................... 7 1.5.4 RISKS DUE TO ERRORS OF ASSEMBLY .................................................................................................... 8 1.5.5 RISKS DUE TO EXTREME TEMPERATURES .............................................................................................. 8 1.5.6 RISKS OF FIRE .............................................................................................................................................. 8 1.5.7 RISKS OF EXPLOSION.................................................................................................................................. 8 1.5.8 RISKS DUE TO NOISE................................................................................................................................... 8 1.5.9 RISKS DUE TO VIBRATIONS ........................................................................................................................ 8 1.5.10 RISKS DUE TO RADIATION ........................................................................................................................ 8 1.5.11 RISKS DUE TO OUTSIDE RADIATION ....................................................................................................... 8 1.5.12 RISKS DUE TO LASER DEVICES ............................................................................................................... 9 1.5.13 RISKS DUE TO GAS AND DUST EMISSIONS ............................................................................................ 9 1.5.14 RISK OF BEING TRAPPED IN THE MACHINE ........................................................................................... 9 1.5.15 RISKS OF FALLING ..................................................................................................................................... 9 1.6.1 MACHINE MAINTENANCE ............................................................................................................................ 9 1.6.2 MEANS OF ACCESS AT THE WORK PLACE AND INTERVENTION ........................................................... 9 1.6.3 INSULATION OF THE SOURCES OF ENERGY AND SUPPLY .................................................................... 9 1.6.4 INTERVENTION OF THE OPERATOR .......................................................................................................... 9 1.6.5 CLEANING OF THE INTERNAL PARTS ........................................................................................................ 9 1.7.1 INFORMATION DEVICES ............................................................................................................................ 10 1.7.2 WARNING DEVICES.................................................................................................................................... 10 1.7.3 WARNINGS AS TO RESIDUAL RISKS ........................................................................................................ 10 Volume 01_ECS_Language _Rev.00 Page 2 Filling machine VMF-L EC standards EC Standards: according to Directives 2006/42 EC and subsequent amendments 1.1.1 Definitions 1. By “dangerous zone” we mean an area of the machine which puts the individual’s safety and health at risk (see layout). 2. By “exposed person” we mean a person located in a dangerous zone of the machine. 3. “Operator” is the person or persons appointed to install the machine, operate it and perform maintenance on it. 1.1.2 Principles of integration of safety a) Construction of the machine provides for it to operate, be adjusted and undergo maintenance without these operations exposing risks to people, if performed in the conditions envisaged by the Manufacturer. The purpose of the measures adopted is to eliminate the risk of injuries during the machine’s foreseeable lifetime, including the assembly and disassembly states, even if said risk should be the consequence of a foreseeable abnormal situation. Proof of what is stated above will be illustrated in the following paragraphs of this report. b) The machine is designed so as to almost completely eliminate risks due to moving parts. For those cases in which these risks are not completely eliminated, appropriate guards that will be described further on have been adopted. c) The machine is designed to package food products, and can work only in this way. Other uses must not be performed without written approval by the Manufacturer as indicated in the use manual. d) Particular effort on the part of the operator is not required because the control systems are made up of push-buttons and not levers, flywheels, etc. During operation in cycle, the operator controls the machine through an operator panel. e) Carefully read the paragraph “Protection devices” in this manual for helpful references to personal protection. f) Special equipment: For the elements forming the machine, common equipment normally found in all maintenance departments suffices. Filling machine VMF-L Page 3 Volume 01_ECS_Language _Rev.00 EC standard 1.1.3 Material and product Materials that could represent risks to the operator, such as asbestos, alloys containing beryllium, etc., were not used. The products used during processing which could be noxious are given in the manual, with the relative instructions on how to manage said products, moreover following the instructions given by the supplier with the relative safety sheets. It is the responsibility of the operator to obtain the safety sheets of the products. 1.1.4 Lighting The machine must be provided with adequate lighting both in the work zones, and in the areas where the operator must perform maintenance. 1.1.5 Design of the machine for transportation purposes The machine has been designed and built taking into account the requirements of transportation and it is possible to dismantle it in several parts, depending on the type and with systems suitable for handling. 1.2.1 Safety and reliability of the control systems The control systems are safe and can stand normal service stresses and are wired with logic for the machine cycle, while emergencies and safety functions are redundant and not subject to the PLC logic. The emergency push buttons all work in series on relays that, disconnecting, interrupt the supply of the auxiliary equipment. All the outtakes of the PLC, not having an intake signal, disconnect all the control relays. 1.2.2 Control devices The control devices can be easily distinguished by the label placed on the electrical panel, with description of the operation, and the practical uses and by the abbreviations given in the wiring diagram for a clear and unequivocal identification. Starting the machine occurs from a highly visible and safe position so that the safety of the individuals is not compromised at the moment of start-up. Use personal protection gear such as: masks, goggles and shoes. Volume 01_ECS_Language _Rev.00 Page 4 Filling machine VMF-L EC standards 1.2.3 Start-up Restarting the machine after a stop only occurs with a voluntary action. With the connection of the general switch and/or because of lack of voltage and/or due to emergency, the machine must be reset with the specific push button and all the operations restarted. 1.2.4 Stop devices Regular stop There is a button for general stop. Regular stop is performed by operating the various stop buttons which are available in every work zone. Emergency stop The emergency stop is done with the same push button (mushroom) placed in every work zone. For the new start command, the push button must be unblocked and all the motors and the operations restarted after having been reset. 1.2.5 Operating mode selector switch Through the operator interface panel, one has the choice of selecting the method of the cycle with which one wants to work the machine. In the passage between the various modes there is no possibility of wrong movements of functions but only those selected. 1.2.6 Control devices Electrical circulation is performed in such a way that there is no early start-up, drop or discharge of a mobile element of the machine or of a part of the machine, etc.... Lack of voltage blocks the machine in all its operations and, when voltage returns, the devices must be restored and restarted. The same applies to compressed air and oil pressure. In case of short circuit, the thermal magnets trip; the same applies for an eventual discharge to ground or unexpected overload. Filling machine VMF-L Page 5 Volume 01_ECS_Language _Rev.00 EC standard 1.2.7 Malfunction of the control circuit The control circuit has been designed to avoid dangerous situations, and in particular: • Early restart; • Impediment in stopping machine; • Ineffectiveness of safety devices. 1.2.8 Software The software is designed so that no dangerous situations are created, is easy to manage and has self-diagnosis system. 1.3.1 Stability Stability is guaranteed by following the instructions given in this manual. 1.3.2 Risks of breakage during operation All the elements used have sufficient resistance characteristics and are suitable for the environment and their utilization; in particular, the elements subject to pressure and stress (especially flexible and rigid pipes). 1.3.3 Risks due to objects falling or being thrown None. 1.3.4 Risks due to sharp edges and surfaces All the angles have been bevelled to avoid risks. 1.3.5 Prevention of risks due to moving parts All the moving parts (rotating shafts, pistons, racks, etc.) are protected and/or separated by casing, and the fixed safeguards are suitable for avoiding contact with the operator and therefore an accident in accordance with UNI EN 12100 points 4.2.2.1 and 4.2.2.2. Volume 01_ECS_Language _Rev.00 Page 6 Filling machine VMF-L EC standards 1.3.6 Selections for a protection against risks due to moving parts The protections of moving parts are of fixed type with possibility of removal wit special tools and are sturdily built. They comply with point 1.4.2.1 of the Machinery Directive 2006/42 and EN12100 points 4.2.2.1 and 4.2.2.2. 1.4.1 General requirements All the guards have been drawn and designed to resist mechanical stresses. 1.4.2 Particular requirements for safety None. 1.4.2.1 Fixed guards See point 1.3.6. 1.4.2.2 Moving guards See point 1.3.6. 1.4.2.3 Adjustable guards that limit access See point 1.3.6. 1.5.1 Risks due to electricity The electrical system is designed and built in accordance with EN 60204-1 standards. 1.5.3 Risks due to different energy The machine has been designed and built in order to prevent all risks due to the various systems installed with signs and instructions. The sources of energy are: Air For the operation of the pneumatic parts (6 bar). Process elements The flexible pipes for the elements of process are tested at 2 times the operating pressure (see paragraph 1.3.2). Filling machine VMF-L Page 7 Volume 01_ECS_Language _Rev.00 EC standard 1.5.4 Risks due to errors of assembly The direction of rotation of the motors is indicated on the casing of the motors with a “directional arrow”. The flexible pipes are marked with coloured heat-shrinking that indicate where they must be mounted. Inversion therefore becomes impossible during assembly which could damage the machine and create risks for the operator. 1.5.5 Risks due to extreme temperatures The system when operating normally does not handle materials at high temperatures (max. 90 °C). The parts relative to heating have been protected and insulated with insulating materials. The temperatures on the uncovered parts of the machine are tolerable to human touch. There are no components with temperatures under 0°C. 1.5.6 Risks of fire The machine has been designed to avoid this risk. Adhere scrupulously to this volume. 1.5.7 Risks of explosion None. 1.5.8 Risks due to noise None. 1.5.9 Risks due to vibrations None. 1.5.10 Risks due to radiation None. 1.5.11 Risks due to outside radiation None. Volume 01_ECS_Language _Rev.00 Page 8 Filling machine VMF-L EC standards 1.5.12 Risks due to laser devices None. 1.5.13 Risks due to gas and dust emissions The machine does not exhibit risks from emissions of dust. 1.5.14 Risk of being trapped in the machine None. 1.5.15 Risks of falling None. 1.6.1 Machine maintenance Maintenance work must always be done with the machine stopped and by qualified personnel. Adhere scrupulously to the instructions in the chapter “Machine Maintenance”. 1.6.2 Means of access at the work place and intervention They are provided where necessary. 1.6.3 Insulation of the sources of energy and supply See the wiring diagrams. 1.6.4 Intervention of the operator It is limited to the regular production functions: “Start-Up”, “Stop” and “Control of the work parameters”. 1.6.5 Cleaning of the internal parts See the chapter “Maintenance”. Filling machine VMF-L Page 9 Volume 01_ECS_Language _Rev.00 EC standard 1.7.1 Information devices They are given on the electrical panel and on the operator command panel; see the chapter “Use Manual” where they are clearly explained. Moreover, an instruction manual is provided edited in conformity with the instructions given in EN 12100. 1.7.2 Warning devices The machine is equipped with process warning signals identifiable by warning lights and acoustic alarms. 1.7.3 Warnings as to residual risks All the warnings relative to the operations of loading/unloading such as for example of the tanks, are given in this instruction manual with specific references to the use of the personal safety devices. Volume 01_ECS_Language _Rev.00 Page 10 Filling machine VMF-L Transport and installation Machine : FILLING MACHINE Type : VMF-L Transport and installation Filling machine VMF-L Page 1 Volume 02_TI_Language _Rev.00 Transport and installation INDEX TRANSPORT AND INSTALLATION .................................................... ...................................................................................................... ............................................................ 1 TRANSPORT AND HANDLING.................................................................................................................................... 3 TRANSPORT........................................................................................................................................................... 3 LOADING / UNLOADING ........................................................................................................................................ 3 PRECAUTIONS ....................................................................................................................................................... 3 TRANSPORT SYMBOLS ........................................................................................................................................ 4 TRANSPORT AND POSITIONING ............................................................................................................................... 5 PACKING DESCRIPTION ...................................................................................................................................... 6 OPENING THE CASES ........................................................................................................................................... 7 PACKING CHECK AFTER MACHINE DELIVERY .................................................................................................. 8 IN THE EVENT OF DAMAGE.................................................................................................................................. 8 MACHINE STORAGE.............................................................................................................................................. 8 PHYSICAL CHARACTERISTICS OF THE STORAGE AREAS.............................................................................. 8 POSITIONING THE MACHINE ..................................................................................................................................... 9 PROTECTION FROM ATMOSPHERIC AGENTS ................................................................................................... 9 SPACE REQUIREMENTS..................................................................................................................................... 10 ENVIRONMENTAL CHARACTERISTICS OF THE POSITIONING AREA ............................................................ 10 FIXING AND LEVELING ............................................................................................................................................. 11 FLOORING AND FOUNDATIONS......................................................................................................................... 11 TOOLS, EQUIPMENT AND CONSUMABLE MATERIALS.................................................................................... 11 INSTALLATION OF SECONDARY COMPONENTS.................................................................................................. 12 PIPING / FITTINGS FOR ICE-CREAM DOSING................................................................................................... 13 CELLS ................................................................................................................................................................... 13 WASHING.............................................................................................................................................................. 14 TESTING ............................................................................................................................................................... 14 MACHINE CONNECTIONS ........................................................................................................................................ 15 ELECTRICAL CONNECTION................................................................................................................................ 15 PNEUMATIC CONNECTION................................................................................................................................. 16 Volume 02_TI_Language _Rev.00 Page 2 Filling machine VMF-L Transport and installation Transport and handling NOTE If these instructions are not observed, Teknoice S.r.l. can not be held responsible for any machine damages or performances not complying with the technical specifications provided. Transport The machine and its units are designed and built in order to be transported without damage by means of vehicles (fork lift trucks) and suitable lifting means (bridge cranes, cranes, double chain hoists). Transport and/or lifting means must be proportional to the weight of the material to be transported. To this regard, the lifting force or capacity must be at least 20% higher than that required for lifting the machine and its packing. Loading / Unloading When loading and unloading from the means of transport and every time it is necessary to lift the machine, a fork lift truck must be used to carry out these operations. The machine and its units must be firmly anchored so they do not slip, overturn or fall from the lift truck’s loading bed. Precautions Strictly follow the precautions and warnings described in the foregoing paragraphs in order to guarantee stability and to prevent uncoupling as well as damages and risks during the handling of the machine. Only skilled and trained personnel (slinging operators, lift truck operators, crane operators, etc.) must carry out the handling and transport operations. ATTENTION Always carefully check the lifting devices conditions and their capacity. Filling machine VMF-L Page 3 Volume 02_TI_Language _Rev.00 Transport and installation Transport Symbols Some goods require special identification for handling, so their packing has been marked or labelled with the international symbols shown in the following table. Eventual danger symbols are on the same sides of the marking. Indication of the centre of gravity must also be shown on the lid and bottom of the case. PRESCRIPTION SYMBOL/MARK EXAMPLE OF APPLICATION Up Fragile Protect from damp Anchor points for slinging Centre of gravity Centre of gravity (loadable) Store indoors Store in rooms with a temperature higher than 0°C Volume 02_TI_Language _Rev.00 Page 4 Filling machine VMF-L Transport and installation Transport and positioning Upon receipt, carefully check conditions of the cases to verify that there is no damage. Place the case in a dry place. The cases should be handled by a lift truck: pay attention to the position of the forks, it must match the position shown in the figure above. The machine is identified and marked, and the identification code is specified in the transport document or delivery note. The parcels are marked by highly visible writings, resistant to water and sunlight or by pre-printed plates. List of units composing the machine (the packing list) shows the marking, weight, dimensions and position of the centre of gravity, to be transported separately without troubles. Filling machine VMF-L Page 5 Volume 02_TI_Language _Rev.00 Transport and installation Packing Description 1. Metal covering (only upon customer’s request); 2. Recipient Address and item identification number ; 3. Item centre of gravity (indicated only if goods inside the case are positioned in such a way as to require special attention during transport and handling). Volume 02_TI_Language _Rev.00 Page 6 Filling machine VMF-L Transport and installation Opening the cases The packing includes one package containing: • • • Standard spare parts, The electrical diagram, The instruction manual. Filling machine VMF-L Page 7 Volume 02_TI_Language _Rev.00 Transport and installation Packing check after machine delivery The packing must be inspected upon delivery according to the following criteria : • • the cases must be intact and without any signs of crushing; there must be no damage to the mechanical parts, such as guides, platens, etc. If there is any damage, the goods are conditionally accepted, since goods integrity must be checked. In case of any damages immediately contact Teknoice S.r.l. before removing any packing from the machine units. Check machine conditions by a visual inspection, inside and outside packing. Any deformations could indicate impacts occurred during the transport, which could affect its normal working. In particular check that the following items are in good condition: • • • • Safety devices and guards (if present); Pneumatic components and pipes; Metal and painted surfaces; Screws, nuts and bolts and fittings tightening In the event of damage It is necessary to verify the machine conditions before positioning it. Damages caused by transport must be immediately reported to Teknoice S.r.l.. Any damage occurred during the transport, for whatever reason, could cause injuries to people or damage to things and furthermore could affect the normal machine working. The Customer, or the Customer’s representative, is asked to thoroughly examine the machine before positioning and start-up. Machine storage If the machine has to be temporary stored due to the following conditions : • • The machine is not installed immediately after its delivery ; The machine is uninstalled and is stored awaiting a relocation. The instructions specified in the following paragraph must be strictly observed. Physical characteristics of the storage areas In case of machine storage, a suitable space must be provided for movement and handling in order to allow personnel to easily and safely carry out slinging and lifting operations. Volume 02_TI_Language _Rev.00 Page 8 Filling machine VMF-L Transport and installation Positioning the machine • • • • Put the machine in the selected place. Level the machine using a "spirit level" by acting on the adjustable feet accordingly. Leave at least 1000 mm free around the machine for maintenance operations. If the machine has to work connected to an ice cream production line, position its pocket conveyor belt and the gripping and release system. Protection from atmospheric agents The machine must be positioned in a covered area and protected from direct contact with atmospheric agents. Filling machine VMF-L Page 9 Volume 02_TI_Language _Rev.00 Transport and installation Space requirements The layout drawing of the machine shows the minimum and maximum distances to be observed for proper placing and positioning of the various component units. In addition to the overall dimensions of the machine, it is necessary to provide additional space (at least 1000 mm) to allow : • • • • Handling, lifting and assembling; Maintenance; Positioning of any push-button panels and/or control stations; Installation of any accessories such as robots and manipulating automatisms, control units, etc. Make reference to the relevant manuals for their overall dimensions. Environmental characteristics of the positioning area The environmental values allowed in the area where the machine is positioned are: • • Environment temperature Relative humidity Volume 02_TI_Language _Rev.00 5°C to 40°C 20% to 90% Page 10 Filling machine VMF-L Transport and installation Fixing and leveling The machine must be properly levelled and fixed to the ground in a suitable way. Follow these instructions: • • Lift the machine and position it on the floor; Level it by means of the proper adjustments on the feet. Flooring and foundations The particular type of construction does not require heavy-duty types of foundation in regard to flooring building works. For any details make reference to the enclosed layout drawing. Check that the flooring has been subject to skid-proof treatment. Tools, equipment and consumable materials Handling: Levelling check: Assembly of mechanical / electrical parts: Filling machine VMF-L lifting equipment specified in this chapter level / centesimal grading spirit level commonly used tools Page 11 Volume 02_TI_Language _Rev.00 Transport and installation Installation of secondary components Before connecting the machine, it is necessary to carry out the installation of the following components, if they are not yet connected : • Product distribution belt • Pipe / fittings for ice-cream dosing • Cells Product distribution belt Product distribution belt is the final part of the production line. The finished product is placed on the belt through the ejection device , in order to allow the operator to take it. To fix the product distribution belt it’s enough to put it on the crossbar and tighten the screws. Volume 02_TI_Language _Rev.00 Page 12 Filling machine VMF-L Transport and installation Piping / fittings for ice-cream dosing Before carrying out the electrical and air connections, it is necessary to connect the ice-cream pipes input and output. In case that some parts of the machines have been dismounted for transport, proceed to mount them according to the diagrams included in the section “DIAGRAMS AND SPARE PARTS”. Ice-cream input fitting, positioned at the top of the dosing unit, connects an ice-cream continuous freezer/s (FC) to the dosing unit of the machine. According to the number of feeding machines and/or to production requirements, there are several types of fittings. Pipe between the freezer F.C. and the machine can be made of stainless steel or flexible, and their diameter shall not be less than 1 ½ inches. Cells Cells are inserted into the linear table (chain). They have to support the ice cream cones. They are fixed to the table by means of screws, supplied with the machine. Cells could be different due to customer’s requirements. To change (change of equipment) see section “PRODUCTION”. Filling machine VMF-L Page 13 Volume 02_TI_Language _Rev.00 Transport and installation Washing The machine can be equipped with the system of shutter washing. By using this system it’s possible to clean the shutters by means of some nozzles positioned along the conveyor with water or detergent solution, according to requirements. Connect a washing system to the pipe input (shown in above figure). Testing The testing was carried out at the company Teknoice Ltd plant, where all mechanical calibration and dimensional setups have been executed. To have a proper installation, make sure to maintain the geometric characteristics set in the project and specified in the mechanical drawings. Technicians in charge of assembling the machine , must pay particular attention to the these characteristics. Volume 02_TI_Language _Rev.00 Page 14 Filling machine VMF-L Transport and installation Machine connections Electrical connection ATTENTION The electrical connection must be carried out only by skilled personnel. Follow these instructions : • • • • • Check the values shown on the identification plate to ensure that machine voltage and frequency are compatible with local voltage and frequency. Taking into account these data and the regulations in force of the country where the equipment is installed, the section of the power supply cable must be no less than 6 mm2 for 400V , while for 230V it must be 10 mm2 . A safety switch should be installed according to the local regulations in force. Lead the electrical cable to the machine from this switch. Then connect the 3 phases to terminals "R-S-T" and the Earth to the relevant terminal on the electrical power supply line. WARNING It is strictly forbidden to turn on the machine without an effective grounding, which must be executed in accordance with the technical specifications indicated by regulations in force. Before turning on the switch, make sure the voltage and frequency match the data on the machine label. Filling machine VMF-L Page 15 Volume 02_TI_Language _Rev.00 Transport and installation Pneumatic connection Follow these instructions : • • • • Connect the compressed air piping to the unit positioned on the side of the machine. The required pressure is 6-8 bar. A manual check valve should be installed on the compressed air line. The hose must have no narrow passages or blockages, and the diameter must be no less than the diameter of the compressed air inlet fitting (8 mm). 1 Pressure regulator 2 Pressure relay 3 Pressure gauge 4 General air valve 5 Moisture exhaust device 2 1 4 3 5 If not yet installed, it is recommended to mount a manual shut-off valve on the compressed air line, near the machine. WARNING Compressed air containing impurities, moisture and oil residue could provoke a rapid wearing of pneumatic valves. The machine is equipped with an air filtering system with automatic exhaust device for moisture (see picture – 5 ), but, it’s however appropriate to install a drying filter downstream the air compressor and carry out a rigorous maintenance. Volume 02_TI_Language _Rev.00 Page 16 Filling machine VMF-L General information, description and safety devices Machine : FILLING MACHINE Type : VMF-L General information, description and safety devices Filling machine VMF-L Page 1 Volume 03_GIS_Language _Rev.00 General information, description and safety devices INDEX GENERAL INFORMATION AND PURPOSE................................................................................................................ 3 MACHINE FUNCTIONS ................................................................................................................................................ 4 MACHINE DESCRIPTION – TYPE VMF – L - VERSATILE MULTIFILLER................................................................. 5 CONTAINERS FEEDING STATION WITH PNEUMATIC ACTIVATION ................................................................. 6 LIDS DISTRIBUTOR WITH PNEUMATIC ACTIVATION ......................................................................................... 6 LID PRESSING........................................................................................................................................................ 6 FINAL PRODUCT EJECTION BY THE PICK UP ROBOT (OPTION) ..................................................................... 7 MACHINE DESCRIPTION - TYPE VMF – L BULKS - VERSATILE MULTIFILLER .................................................... 8 CONTAINERS FEEDING WITH PNEUMATIC ACTIVATION .................................................................................. 9 LIDS DISTRIBUTOR WITH PNEUMATIC ACTIVATION – LID PRESSING – FINAL PRODUCT EJECTION...... 10 MACHINE DESCRIPTION - TYPE VMF – L CC - VERSATILE MULTIFILLER ......................................................... 11 CUPS FEEDING STATION - CONES FEEDING STATIONS ............................................................................... 12 LIDS DISTRIBUTOR WITH PNEUMATIC ACTIVATION ....................................................................................... 12 MACHINE DESCRIPTION - TYPE VMF – L CN - VERSATILE MULTIFILLER ......................................................... 14 CUPS FEEDING STATION - CONES FEEDING STATION .................................................................................. 15 LID DISTRIBUTOR WITH PNEUMATIC ACTIVATION ......................................................................................... 15 MACHINE DESCRIPTION - TYPE VMF – L CP- VERSATILE MULTIFILLER........................................................... 17 CONTAINER FEEDING STATION WITH PNEUMATIC ACTIVATION.................................................................. 18 LID DISTRIBUTOR WITH PNEUMATIC ACTIVATION ......................................................................................... 18 LID PRESSING...................................................................................................................................................... 18 OPTIONS............................................................................................................................................................... 19 PICK UP OF FINAL PRODUCTS BY THE ROBOT............................................................................................... 19 MACHINE DESCRIPTION - TYPE VMF – L SPECIAL OPTION FOR GRANITA - VERSATILE MULTIFILLER....... 20 CONTAINERS FEEDING STATION WITH PNEUMATIC ACTIVATION ............................................................... 21 VOLUMETRIC DOSING WITH PNEUMATIC ACTIVATION FOR GRANITA DOSING ......................................... 21 LID DISTRIBUTOR WITH PNEUMATIC ACTIVATION ......................................................................................... 21 LID PRESSING...................................................................................................................................................... 22 PICK UP OF FINAL PRODUCTS BY THE ROBOT............................................................................................... 22 MACHINE DESCRIPTION - TYPE VMF – L OPTION FOR TRUFFLE ICE-CREAM - VERSATILE MULTIFILLER.. 23 CONTAINER FEEDING STATION WITH PNEUMATIC ACTIVATION.................................................................. 24 FILLING STATION WITH ELECTRONIC ACTIVATION FOR ICE-CREAM DOSING............................................ 24 COCOA POWDER DISTRIBUTOR ....................................................................................................................... 24 LID DISTRIBUTOR WITH PNEUMATIC ACTIVATION – LID PRESSING ............................................................ 25 PICK UP OF FINAL PRODUCTS BY THE ROBOT............................................................................................... 25 MACHINE DESCRIPTION .......................................................................................................................................... 26 TECHNICAL CHARACTERISTICS........................................................................................................................ 28 MARKING ................................................................................................................................................................... 29 IDENTIFICATION PLATE ...................................................................................................................................... 29 RESIDUAL RISKS ...................................................................................................................................................... 30 MACHINE SAFETY DEVICES............................................................................................................................... 31 LOCATION OF THE EMERGENCY BUTTONS .................................................................................................... 31 GENERAL WARNINGS .............................................................................................................................................. 33 NOTES OF DANGER....................................................................................................................................... 33 NOTES OF CAUTION ........................................................................................................................................... 34 PERSONNEL QUALIFICATION ................................................................................................................................. 35 GENERAL EXPERTISES ...................................................................................................................................... 35 QUALIFIED PERSONNEL EXPERTISES ............................................................................................................. 35 PERSONAL PROTECTIVE EQUIPMENT - PPE ........................................................................................................ 36 OPERATOR PPE TABLE ...................................................................................................................................... 38 Volume 03_GIS_Language _Rev.00 Page 2 Filling machine VMF-L General information, description and safety devices General information and purpose The purpose of this manual is to provide instructions and procedures of use for the personnel in charge of working on the machine , according to the technical specifications and project data for which it was built. Its reading is essential, but it can not replace the competence of assigned personnel who must have received an appropriate training. The manual should be available to all personnel operating the machine, or in any way involved in its functioning. The use of the machine is recommended for skilled operators , adequately instructed and having good knowledge of all control functions. In particular: • the user operator ; • the maintenance manager and operators ; • the prevention and safety manager and operators. The Customer Company must ensure that all staff have read and understood the contents of the present manual with regard to its own competence. This manual should be kept intact and in good conditions throughout the life of the machine. Keep the original manual in a safe and protected place. The Declaration of Conformity is the document that certifies its conformity with the Machinery Directive. Therefore it must be carefully kept and eventually produced on request of the competent authorities. In case of loss or damage of the documentation it’s possible to get a new copy from the manufacturer, specifying the order reference number, the machine serial number and the year of construction. The machine is built in accordance with the European Community regulations and technical standards, as attested by the Declaration of Conformity CE issued by the manufacturer and enclosed to this manual. Filling machine VMF-L Page 3 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Machine functions This is an automatic machine of new concept, designed for filling ice-cream into cups and tubs of medium and large capacity. Easy to handle in maintenance and cleaning, it complies with the most recent health and safety standards. It is equipped with a system that allows a quick and easy change of the tubs size. Its exceptional flexibility in size changing is the real peculiarity. It’s enough to enter few data on the touch screen control panel, such as: - Ice-cream quantity coming from the continuous freezer/s; - Container capacity; - Container height. Taking into consideration these data, the machine automatically adjusts the movement of dosing unit. The machine basic version is supplied for only one container size with relevant lid. Upon request the machine can be equipped with one or more sets of equipment for a quick change of the container size. Changing the containers size of is very simple, since containers supports , made of stainless steel, are easily removable. Even the stainless steel sections are removable, to allow easy access to the stations; furthermore they can also be designed for different containers size, by increasing the possibility to fill different tubs size. The machine functioning is guarantee by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are mechanical and they are electronically synchronized by the PLC, so they are programmable. Each working station is independent and is activated by the control panel with digital display. Interface “machine / operator” is guaranteed by a touch screen panel mounted on the control cabinet. Volume 03_GIS_Language _Rev.00 Page 4 Filling machine VMF-L General information, description and safety devices Machine Description – type VMF – L - Versatile MultiFiller Linear filling machine for ice-cream tubs. Automatic filler for dosing, filling and sealing every container type which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the type of container (to be confirmed upon receipt of samples) Installed power: 2,5 Kw Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel Type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is entirely made of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations : Filling machine VMF-L Page 5 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Containers feeding station with pneumatic activation Dosing by electronic and pneumatic activation ; prepared for ice-cream dosing with solid inclusions (max. dimensions 5/8 mm) Lids Distributor with pneumatic activation Lid pressing Volume 03_GIS_Language _Rev.00 Page 6 Filling machine VMF-L General information, description and safety devices Final product ejection by the pick up robot (option) Filling machine VMF-L Page 7 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Machine description - type VMF – L bulks - Versatile MultiFiller Linear filling machine for ice-cream tubs in 1 or 2 rows. Automatic filler for dosing, filling and sealing every container type which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the type of container (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Volume 03_GIS_Language _Rev.00 Page 8 Filling machine VMF-L General information, description and safety devices Containers feeding with pneumatic activation Dosing process by electronic and pneumatic activation, prepared for dosing ice-cream with solid inclusions (max. dimensions 5/8 mm) Filling machine VMF-L Page 9 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Lids distributor with pneumatic activation – Lid pressing – Final product ejection Options : • Crumbs distributor • Dating device Volume 03_GIS_Language _Rev.00 Page 10 Filling machine VMF-L General information, description and safety devices Machine description - type VMF – L CC - Versatile MultiFiller Linear filling machine for ice-cream cups and cones. Automatic filler for dosing, filling and sealing every type of cups and cones which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the container type (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel Type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Filling machine VMF-L Page 11 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Cups feeding station - Cones feeding stations Calibration of paper cones Chocolate sprinkling Dosing process by electronic and pneumatic activation, prepared for dosing ice-cream with solid inclusions (max. dimensions 5/8 mm) Chocolate dosing for topping Crumbs distributor Lids distributor with pneumatic activation Volume 03_GIS_Language _Rev.00 Page 12 Filling machine VMF-L General information, description and safety devices Lid pressing – Final product ejection Filling machine VMF-L Page 13 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Machine description - type VMF – L CN - Versatile MultiFiller Linear filling machine for ice-cream cones. Automatic filler for dosing, filling and sealing every type of cups and cones which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the container type (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Volume 03_GIS_Language _Rev.00 Page 14 Filling machine VMF-L General information, description and safety devices Cups feeding station - Cones feeding station Calibration of paper cones Chocolate sprinkling Dosing process by electronic and pneumatic activation, prepared for dosing ice-cream with solid inclusions (max. dimensions 5/8 mm) Chocolate dosing for topping Crumbs distributor Lid distributor with pneumatic activation Filling machine VMF-L Page 15 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Lid pressing – Final product ejection Volume 03_GIS_Language _Rev.00 Page 16 Filling machine VMF-L General information, description and safety devices Machine description - type VMF – L CP- Versatile MultiFiller Linear filling machine for ice-cream cups in 3-4 rows. Automatic filler for dosing, filling and sealing every type of cups and cones which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the container type (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Filling machine VMF-L Page 17 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Container feeding station with pneumatic activation Dosing process by electronic and pneumatic activation, prepared for dosing ice-cream with solid inclusions (max. dimensions 5/8 mm) Lid distributor with pneumatic activation Lid pressing Volume 03_GIS_Language _Rev.00 Page 18 Filling machine VMF-L General information, description and safety devices Options Pick up of final products by the robot • • Crumbs distributor Dating device Filling machine VMF-L Page 19 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Machine description - type VMF – L special option for granita Versatile MultiFiller Linear filling machine for granita (frozen juice in cup or cone). Automatic filler for dosing, filling and sealing every type of cups and cones which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the container type (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated device of intermittence. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Volume 03_GIS_Language _Rev.00 Page 20 Filling machine VMF-L General information, description and safety devices Containers feeding station with pneumatic activation Volumetric dosing with pneumatic activation for granita dosing Lid distributor with pneumatic activation Filling machine VMF-L Page 21 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Lid pressing Pick up of final products by the robot Volume 03_GIS_Language _Rev.00 Page 22 Filling machine VMF-L General information, description and safety devices Machine description - type VMF – L option for truffle ice-cream - Versatile MultiFiller Linear filling machine for “truffle” ice-cream. Automatic filler for dosing, filling and sealing every type of container which can be inserted into each other. Mechanical power from 5 to 25 strokes per minute per row. Production capacity: depends on the container type (to be confirmed upon receipt of samples) Installed power: 2,5 kW Air consumption: 350 Nl / min Compressed air: 6-8 bar Control Panel type "Touch Screen" for all control and check functions. It can memorize all operations of each station in regard to each product. The basic model is made entirely of stainless steel and equipped with a conveyor belt with shutters. The product size is excluded. The machine functioning is guaranteed by an electronic drive motor and by a life lubricated indexing box. All basic movements of the machine are synchronized electronically, while the secondary movements are activated pneumatically. Each working station is independent and can be activated by the control panel. Internal auxiliary circuit works at 24 volts. The machine is protected by a safety system in accordance with the regulations. The basic model is equipped with the following stations: Filling machine VMF-L Page 23 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Container feeding station with pneumatic activation Filling station with electronic activation for ice-cream dosing Cocoa powder distributor Volume 03_GIS_Language _Rev.00 Page 24 Filling machine VMF-L General information, description and safety devices Lid distributor with pneumatic activation – Lid pressing Pick up of final products by the robot Filling machine VMF-L Page 25 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Machine description It is an automatic filler machine for ice-cream cones, made of stainless steel. The main parts of the machine are: 1 Loading station (cones) 2 Spraying station – calibration – paper calibration 3 Dosing station 4 Conveyor belt with cells 5 Chocolate topping station 6 Crumbs dosing station 7 Lids loading station 8 Crimping station 9 Ejection / unloading station - product distribution belt 07 06 05 01 08 02 09 04 Volume 03_GIS_Language _Rev.00 03 Page 26 Filling machine VMF-L General information, description and safety devices From the loading station (1) cones are automatically taken and put into the cells of the chain (4), this , by moving forward, regulates the production process. In the SPRAYING - CALIBRATION station (2) there are two devices: 1. one device goes down into the cone and , by a light pressure, widens the product wrapping in order to eliminate any paper folds , which could compromise a proper filling of the cone. 2. one device is connected to the external group (the chocolate pump) and sprays chocolate inside the cone. The dosing unit (3) provides for ice-cream filling into the cone (1-2 taste). Number and type of dispensers can be different according to customer’s specific requests. The dosing unit is controlled by a brushless motor during up and down movements , while the dispensers opening and closing movements are controlled pneumatically by electronic cams, which guarantee a proper filling of container. After the dosing unit there is the TOPPING station (5), where it occurs dosing of liquid chocolate on the upper part of the cone. After this station , there could be the CRUMBS station (6), where the crumbs are distributed on the cone by means of a feedbox. The quantity of crumbs is regulated manually. LIDS LOADING station (7) follows the crumbs group, here the lid is placed on the cone by a special device. At the CRIMPING station (8) paper must be efficiently pressed around the lid. Vertical movement of the station is provided by a pneumatic cylinder. At the end of the production cycle there is the PRODUCT EJECTION station (9). The final product is placed on the product distribution belt in order to allow the operator to take the cones. Upon request, a PENCIL FILLER station ( caramel injection in the cone) is available , as well as other components that allow to diversify the final product decoration. Always upon request, a dating device can be supplied , it can print the expiry date on the product by an ink-jet printing Filling machine VMF-L Page 27 Volume 03_GIS_Language _Rev.00 General information, description and safety devices The safety panels, mounted on every side of the machine, are an integral part of the machine and they are designed according to the safety norms of the European Community. SAFETY PANEL Technical characteristics Mechanical power: Production capacity: Installed power: Air consumption: Requested air pressure: Dimensions of machine: from 20 to 50 strokes/min. from 4000 to 12000 portions/hour, per 4 rows from 7000 to 18000 portions/hour, per 6 rows 12 kW 1200 NL/min. 6-8 bar depending on configuration Extra equipments Upon request the machine can be supplied with extra equipments to allow the production of tubs with different size and dimensions, thanks to a quick size change system. Volume 03_GIS_Language _Rev.00 Page 28 Filling machine VMF-L General information, description and safety devices Marking Self-adhesive safety labels are positioned on the machine as follows : • • • • • High voltage Electric power Danger Voltage danger Earth connection inside electrical control cabinet inside electrical control cabinet inside electrical control cabinet inside electrical control cabinet inside electrical control cabinet Before maintenance intervention on the machine, it is necessary to expose the warning advice "MAINTENANCE IN PROGRESS" in well visible areas. Identification plate The machine is provided with the identification plate reporting the main technical data, in particular: • • • • • • • Model Serial number Voltage Total installed power Frequency Number of phases Type and charge of refrigerant Plate example: MODEL SERIAL ELECTRICL DATA Volt ph Hz Kw REFRIGERANT REFRIGERANT CHARGE Filling machine VMF-L Kg. Page 29 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Residual risks Although the machine of the company Teknoice Srl is built in compliance with the current technological knowledge and its functioning can be defined safe, it can become dangerous if used improperly by unskilled personnel or for purposes different from the intended use. During the machine operations there are residual risks for the operator, which are described from time to time. The residual risks can be eliminated by carefully following the procedures described in this manual and using the required personal protection equipment (PPE). The machine use, maintenance and repair operations must be carried out by assigned personnel, duly skilled and acquainted about possible hazards. The user is committed to use the machine only when it is in perfect conditions. The operator must also guarantee that the machine is not used by unauthorized persons. The safety devices of the machine must not be modified or altered without a written permission from the company Teknoice Srl. In case of damage or breakdown, the machine can not be used until the safety devices are in serrvice again. During service and maintenance operations, there is a HIGH RISK, that’s why they must be carried out only if the machine is STOPPED and SWITCHED OFF. The electrical failures can be repaired only by AUTHORIZED PERSONNEL. The machine guards can be removed only for repair or maintenance. Before a new start-up of the machine they must be remounted and fastened in its original position. During the transportation, installation and start-up it’s necessary to follow the Directives about Accident Prevention Measures, in their most updated edition. Residual risks during machine working and when stopped : • • Any items (excluding production pieces) accidentally left in the work area may cause a risk to the operator; It is forbidden for other people except the operator to stay in the safety area or in any case in dangerous areas during the machine working. Volume 03_GIS_Language _Rev.00 Page 30 Filling machine VMF-L General information, description and safety devices Machine safety devices Those machine components which could be potentially dangerous (for example: gears, belts etc…) are protected by fixed guards (metal covers). Location of the emergency buttons Emergency button = CAUTION To carry out maintenance operations, the machine must be stopped and its main switch must be in OFF position. The operator user is not allowed to access to the interior areas of the machine when it’s working. The areas are dangerous and can cause risks of serious injury. Only one single operator can handle the systems in this area. Therefore the manufacturer is not liable for damages to persons or property which may result; in this case the operator acts at his own risk. Therefore, the potentially dangerous areas are protected by guards which comply with safety standards (a safe distance to prevent danger areas being reached by upper limbs). Filling machine VMF-L Page 31 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Operator position During the production cycle the machine doesn’t need to be controlled. The operator is normally in front of the tubs unloading station or close to the control panel (see figure). Volume 03_GIS_Language _Rev.00 Page 32 Filling machine VMF-L General information, description and safety devices General warnings Notes of danger Always switch off all main and auxiliary power supply of the machine before carrying out maintenance operations. Place specific warning signs MAINTENANCE IN PROGRESS - DO NOT SWITCH ON POWER SUPPLY on the main switches. • During the machine working , the moving components can cause serious injury to persons. Avoid any contact with these components. • Never exclude the safety and protection devices installed on the equipment. If it becomes necessary, indicate such conditions by proper warning signs and act with utmost caution. Reassemble as soon as possible all safety and protection devices. The general layout drawing, enclosed to this manual, shows the operator’s work positions. • If not earthed the machine can cause serious injury to persons. Always check earth connections and their compliance with Standards. • Avoid using flammable or toxic solvents such as gasoline, benzene, ether and alcohol. It is recommended the use of trichloroethylene or other compatible detergent, using the necessary precautions. • Toxic waste such as production waste, lubricants etc., should be collected in special containers labeled and disposed of according to local regulations in force. • Always make sure, before set in motion the machine, that the maintenance staff is at a safe distance and that tools or materials are not left nearby. • Use safety glasses and protection gloves during maintenance operations. Filling machine VMF-L Page 33 Volume 03_GIS_Language _Rev.00 General information, description and safety devices • Never use water jets in case of fire on the machine, cut all power supply and use dry chemical extinguisher Class ABC. • It is strictly forbidden to put combustible material near the electrical control panel. • The electrical control panel should always be locked and access should be allowed only to authorized and skilled personal. • Operations inside the electrical control panel should be done only after switching off the main power switch and disconnecting power supply. • Make sure to use tools in perfect conditions and provided with insulating handles if required. Check that the insulator of machine cables and wires does not show any sign of breakage or damage. CAUTION Before the installation of the machine, the customer is required to make the work environment compliant to the local regulations in force regarding the "Safety in the workplace” and to provide the qualified staff and operators with proper accident-prevention clothing to guarantee the healthcare at work. Notes of caution • Before re-starting the machine after a failure, it is necessary to carefully inspect and check the machine itself to find any damage. • Always use dry air for cleaning; pressure can not exceed 2 bars. • Always use tools in perfect conditions and suitable for the operation to be done, use of inappropriate and inefficient tools can cause serious damages. • Always check correct working and distribution of the lubrication. Lack of lubricant can damage the machine. • Never change the settings and limit switches positions of the machine : if modified, serious damages to the machine and risks to the operator could occur. CAUTION Every preventive, ordinary and extraordinary maintenance operation has to be written in the special register by reporting date, time, type of operation, operator’s name and any useful information. Volume 03_GIS_Language _Rev.00 Page 34 Filling machine VMF-L General information, description and safety devices Personnel qualification Maintenance operations can be carried out in safety conditions after reading and understanding the recommendations and instructions provided by this manual. Terms used for the operator: User: personnel authorized to the machine use Maintenance technician: qualified personnel authorized to the machine use, preparation and maintenance. General expertises • • • • To know the construction and functions for special pieces production. To know how to use and consult the machine documentation. Take responsibility of making his own decisions regarding interventions on whole automatic systems. Take note any irregularity during production process and, if necessary, take appropriate measures. Qualified personnel expertises The composition and qualification of the personnel teams, specified in the maintenance plan, are those recommended by the company Teknoice Srl. When necessary, the different operations can be also carried out by personnel with equal or higher qualification who have followed specific training courses. Filling machine VMF-L Page 35 Volume 03_GIS_Language _Rev.00 General information, description and safety devices Personal protective equipment - PPE If the environmental analysis shows the fumes concentration higher that those provided by the local laws or otherwise by the safety data sheets of used products, the staff must wear an appropriate protective mask. In case of contact with the components immediately wash with water, or otherwise follow the instruction of product safety sheet. Install near the machine suitable eyewash or otherwise appropriate water fountain. The operator or maintenance technician working on the machine or passing through must not wear clothing with loose sleeves, neither straps nor belts which may cause danger. Any long hair must be gathered up in a headgear to avoid a possible danger. The operator’s area must be cleared from foreign objects and treated by anti-slip product (at Customer’s charge). Alternatively you can use anti-skid carpets. The operator should always wear safety shoes with rubber soul and reinforced toe. CAUTION During machine working and maintenance operations, it’s necessary to use protective goggles, gloves, helmet, gas masks and clothing covering completely the skin. Volume 03_GIS_Language _Rev.00 Page 36 Filling machine VMF-L General information, description and safety devices PROTECTIVE GOGGLES Use: always PROTECTIVE HELMET Use: always WATERPROOF RUBBER GLOVES Use: always SHOES WITH RUBBER SOUL Use: always PROTECTIVE MASK Use: If the environmental analysis shows the fumes concentration higher that those provided by the local law or otherwise by the safety data sheets of used products Filling machine VMF-L Page 37 Volume 03_GIS_Language _Rev.00 General information, description and safety devices X Appropriate gloves X X Insulated gloves suitable for max working voltage X X X X X X X X X X X X X Face shield _Rev.00 X X Page 38 X X X X X X X X Safety shoes with insulating soul Safety clothing covering the whole body (skin) X X X Glasses with transparent glass when grinding or drilling X X X Goggles or face shields, for flame risks Volume 03_GIS_Language X X X Safety shoes with antipunching soul X X Gloves for high temperatures Glasses with transparent glass X X Gloves for manual work Gloves for oil-based detergents Maintenance X Use of the machine Testing X Operations on flexible pipes / temporary connections under pressure for liquids and gas Wiring and electrical control panel connection X Operations on elements with electrical voltage Pipes assembling and mounting Protective helmet Cleaning Operator PPE table X X X X Filling machine VMF-L Use manual Machine : FILLING MACHINE Type : VMF-L Use manual Filling machine VMF-L Page 1 Volume 04_UM_Language _Rev.00 Use manual CONTENTS IN THIS CHAPTER USE MANUAL.................................................... MANUAL...................................................................................................... ............................................................................................... 1 INTRODUCTION ........................................................................................................................................................... 3 OPERATOR STATUS.............................................................................................................................................. 3 GENERAL RULES................................................................................................................................................... 3 PERSONNEL IN CHARGE OF THE START-UP .......................................................................................................... 4 OPERATOR............................................................................................................................................................. 4 QUALIFIED PERSONNEL ....................................................................................................................................... 4 WORKING MODES...................................................................................................................................................... 5 PRELIMINARY OPERATIONS ................................................................................................................................ 5 MOVEMENT OF THE CELLS CHAIN..................................................................................................................... 5 CONES AND LIDS FEEDING ....................................................................................................................................... 6 CHOCOLATE LOADING .............................................................................................................................................. 7 CRUMB LOADING........................................................................................................................................................ 8 PENCIL FILLER LOADING .......................................................................................................................................... 9 PERFORMANCE CHECK............................................................................................................................................. 9 PRODUCTION CYCLE CHECKING ........................................................................................................................... 10 CONES LOADING STATION................................................................................................................................. 10 DOSING UNIT ....................................................................................................................................................... 10 LIDS LOADING STATION ..................................................................................................................................... 11 UNLOADING STATION ........................................................................................................................................ 11 CHOCOLATE QUANTITY REGULATION ............................................................................................................. 12 AIR FLOW REGULATION ..................................................................................................................................... 12 SPEED DISTRIBUTOR REGULATION ................................................................................................................. 12 STARTUP PROCEDURE............................................................................................................................................ 13 EMERGENCY STOP ............................................................................................................................................. 13 PRODUCTION END AND STOP ........................................................................................................................... 14 CYCLE STOP ........................................................................................................................................................ 14 WASHING PROCEDURE ........................................................................................................................................... 14 CLEANING ............................................................................................................................................................ 15 SIZE CHANGE ............................................................................................................................................................ 15 CELLS REPLACEMENT........................................................................................................................................ 15 CONES LOADING STATION................................................................................................................................. 15 DOSING UNIT ....................................................................................................................................................... 16 LIDS LOADING STATION ..................................................................................................................................... 16 PRODUCTION DEBUGGING ..................................................................................................................................... 16 CONTROL PANEL AND OTHER COMPONENTS FUNCTIONS ............................................................................... 17 CODE / COLOUR OF THE PUSH-BUTTONS AND THEIR MEANING ................................................................. 17 COLOURS OF LIGHT INDICATORS AND THEIR MEANING............................................................................... 18 CONTROL PANEL................................................................................................................................................. 19 Volume 04_UM_Language _Rev.00 Page 2 Filling machine VMF-L Use manual Introduction This chapter describes the operations required for the production of the final product. Operator status Personnel qualified to carry out the machine preparation and maintenance operations must be instructed and have been properly trained as the different operations must be done in manual mode, by excluding safety devices. In particular the personnel must have been informed about how to carry out the procedures described in this manual in a safe manner and must wear the personal protection equipment required. The machine preparation phase must be carried out only by authorized personnel in possession of the keys and of any access codes which enable the machine preparation procedures. General rules Machine working process, the run/stop command, the alarm and emergency signals are located on the Check panel. It is a good rule to check the machine working and the warning signals shown by sensors and failure indicators positioned on the Check panel. Filling machine VMF-L Page 3 Volume 04_UM_Language _Rev.00 Use manual Personnel in charge of the start-up When starting the machine, for safety reasons, only those technicians duly assigned must be present, in order to avoid any risks to the operators not specifically assigned to the start-up of the machine. The most important definitions reporting in this manual are provided below. Operator By operator it means personnel assigned to using and ordinary cleaning of the machine. Qualified personnel By qualified personnel, it means personnel instructed about the machine installation, assembly, repair and servicing procedures and who have specific technical qualifications such as : • A technical training that authorizes them to work in accordance with the safety standards in regard to the dangers due to electricity, circuits under pressure, etc... • A technical training or in any case specific instruction concerning the machine use and maintenance procedures in safe conditions. • Training in the basic first aid measures. Volume 04_UM_Language _Rev.00 Page 4 Filling machine VMF-L Use manual Working modes Every operation can be Checkled by push-buttons or by the video pages of the operator panel. Pressing a push-button or a function key brings the selected area to move, a following pressing of the same key or the corresponding stop push-button causes the immediate stop. For further explanations, refer to the chapter "OPERATOR PANEL VIDEO PAGES". Preliminary operations Before starting the machine check the following: • • • • • • Check that the EMERGENCY push-button on the control panel is unlocked and the lamp which signals the tension is ON. For detailed information on these devices see the section PRODUCTION. Check that the air valve, if supplied, is in work position; this valve, when supplied, is mounted at the head of the air quick connection. Switch ON the main switch on the electrical panel and push the RESET button. Check if the pipes between freezers and dosing unit are assembled correctly. Check if the pipes and connections between the chocolate pump and the machine are assembled correctly. Check if the machine is ready for the cone size you want to produce. For detailed information on the size change contact the technical service of Teknoice S.r.l. Movement of the cells chain To check the correct direction of motor rotation proceed as follows: 1. Run the linear table (with cells) by holding pressed the button JOG on the control panel and check that the motor turns clockwise. If not, do the following: • • • • Turn off the power supply by using the main switch Block the switch with a lock Open the control panel. Reverse two phases in motor power line Close the control panel, turn on the main switch. Filling machine VMF-L Page 5 Volume 04_UM_Language _Rev.00 Use manual Cones and lids feeding Load cones and lids. Access to the feeding area is allowed without removing the safety panels. If one of the safety panels should be open the machine will stop automatically. Safety Lids feeding panels area • Safety panels Cones feeding area Insert the cones into the feeding area by adjusting the width according to the size of the cones. You should operate on the bolts that fix the columns. Make sure that the cones are not too pressed among them. Volume 04_UM_Language _Rev.00 Page 6 Filling machine VMF-L Use manual • Insert the lids into the feeding area by adjusting the width according to the size of the lid. You should operate on the bolts that fix the columns. Close the door if it is open. WARNING Do not exclude safety devices by using the key selector on the control panel. Only qualified technicians can use this key selector during machine settings and extraordinary maintenance operations. Chocolate loading Load the chocolate in the proper tank positioned on the dosing device shown in the below picture. Filling machine VMF-L Page 7 Volume 04_UM_Language _Rev.00 Use manual Put water into the cavity through the suitable clamping connection (see picture below). Water is essential for maintaining chocolate temperature during pump operation. Crumb loading WARNING This operation should be done only if the machine has this option. Load crumbs into the feedbox (see picture below). The operation can be done while the machine is running. Periodically add crumbs by using any type of container. On the control panel there is a selector that allows to exclude the control of protection devices during the opening of doors. This operation is only for maintenance purposes and must be done only by qualified technicians to carry out maintenance interventions. Opening the door with machine in service can provokes serious injuries to the operator. Adjust manually the shutters on the feedbox to regulate the crumbs quantity falling onto the cone. Volume 04_UM_Language _Rev.00 Page 8 Filling machine VMF-L Use manual Pencil filler loading WARNING This operation should be done only if the machine has this option. Performance check Before starting cones or cups production , it is possible to test the machine performance in order to verify if the settings are correct. This operation is done automatically by the by-pass valve (pneumatic valve), installed at the icecream input fitting in the upper side of the dosing unit. Start a continuous freezer, so that the bypass valve automatically opens and sends ice cream to the external pipe, under which you should put some container. Once the ice cream has reached a certain consistency, start the dosing unit , in order that the bypass valve automatically sends the ice cream to the dosing unit. Filling machine VMF-L Page 9 Volume 04_UM_Language _Rev.00 Use manual Production cycle checking • • Push RESET button on the control panel. Push JOG button and hold it to start the table and check its functioning. Cones loading station • • • • • Activate the cones feeding station by the control panel. Press and hold the JOG button. Pneumatic pick-up device goes upstroke , takes the cone and puts it into the cell. The table moves one step forward, and the same operation is repeated with the next cone. Once the cycle has been verified, release the button and turn off the unit. Dosing unit • • • • • • Activate the dosing unit by the control panel. Press and hold the JOG button. The dosing unit goes down to the tub, simulating an ice-cream dosing. Check if it works well; check dosing unit height and functioning. To work correctly the dosing unit should open during the downstroke movement, remain open during the break of the cells table forwarding and close as soon as upstroke movement starts. Once the functioning of the unit has been verified , release the button and turn off the unit. Volume 04_UM_Language _Rev.00 Page 10 Filling machine VMF-L Use manual Lids loading station • • • Activate the lids feeding station by the control panel. Press and hold the JOG button. When the tub reaches the feeding area a pneumatic device puts automatically the lid on the cone. WARNING To avoid any failures , make sure that the photocell which detects the presence of the tub is activated. For this function, press the SET button and open the configuration page referred to lids loading During trial cycle, if the photocell detects the absence of the tub, lids loading station doesn’t start. Make sure that the lids are placed on the center of the cell. If not, make sure that the suction cup holder is horizontal (both in upper and lower position). If it needs to be adjusted, loosen the bolts with cylindrical head, which kept the suction cap to the arm and turn it until it is properly adjusted. After that, tighten the bolts. If the suction cup holder is horizontal, but the lids are still not placed in the center, this means that the bars of the loading station are not adjusted properly. If the cover appears on the left of the cell, it is necessary to shift all the bars to the left. If the cover appears on the right of the cell, it is necessary to shift all the bars to the right. Thus, make sure the loading unit is well-centered according to the lower cell and it properly closes the containers. If everything works well, release the button and turn off the group. Unloading station • • • • Activate the station by the control panel. Press and hold the JOG button. When the cone reaches the unloading station, grippers pick up it and put it on the conveyor belt. If everything works well, release the button and turn off the station. Filling machine VMF-L Page 11 Volume 04_UM_Language _Rev.00 Use manual Chocolate quantity regulation It’s possible to regulate the chocolate flow in the spraying-calibration station in order to dose chocolate quantity to be injected into the cone. To carry out this operation, it is necessary to use the tap indicated by the arrow in the below picture (adjust the chocolate flow by starting from the left). Air flow regulation In the spraying-calibration station, further to regulate the chocolate flow, it is also possible to adjust the air flow to get a correct chocolate spraying. To carry out this operation, it is necessary to use the regulator indicated by the arrow in the below picture . Speed distributor regulation The ice cream quantity coming from the dosing unit can be set by means of the proper regulators positioned on the pistons. Volume 04_UM_Language _Rev.00 Page 12 Filling machine VMF-L Use manual Startup Procedure • • • • • • • • Put a container under the dosing unit near the slide in order to collect any material in excess or dosed without cones. Start the continuous freezer, which feeds the machine. Wait until the ice cream coming from the freezer has the required shape and consistency. Make sure that all stations are not in service, except for the dosing unit, which should work to simulate the following working conditions. Turn on the machine and set the required production speed. For this operation, see the next section. Wait until the ice cream in the pipes reaches the required pressure (several minutes), turn on the cones loading (see previous section), wait till when a few cones are put in the cells and turn off the station. Make sure that the cones are filled correctly. If not, increase or reduce the speed of freezer to change the quantity of dosed product, and repeat the test until you get the desired result. Turn on the cones loading , the lids loading and the unloading station (see previous paragraph). Emergency stop If during production, you need to stop immediately all machine functions, press the emergency button (Red Mushroom button). All functions will be stopped and it will be not possible to restart them until the button will be unlocked by turning it counterclockwise. To restart the production, proceed as follows: • Remove the nozzles from the dosing unit by means of the proper key in order to avoid a collision with the linear table when the cycle is restarted. • Release the emergency button turning it counterclockwise. • Press the reset button on the control panel. • Start up the machine. The machine will automatically recalculate the production data settings and be automatically in the working position. • Stop the machine again and reinstall the nozzles. CAUTION The emergency stop eliminates all risks related to moving parts of the whole machine. If it is necessary to make any operation inside the machine, use the necessary personal protective equipment. Filling machine VMF-L Page 13 Volume 04_UM_Language _Rev.00 Use manual Production end and stop To finish the ice-cream production, do the following: • • • • Wait for the next product. Then push the STOP button of the machine. The stations will stop in the rest position. Disconnect all utilities. Turn off the machine. Cycle stop At the end of the production cycle, stop the ice cream feeding from freezer, then turn off the machine. To turn off the machine, you should disconnect all units separately since they are independent one from the other. We recommend you turn off the units in this sequence: 1. Cones loading station 2. Dosing unit 3. Lids loading station 4. Unloading station You can disconnect all stations/units by the control panel. Washing procedure At the end of the cycle the machine must be cleaned from any product residues. First it is necessary to make the dosing unit prewsh by using the ice-cream feeding freezer. For a correct pipes prewash , do the following: • • • • Put a container under the dosing unit to collect water Set up washing function from the freezer, feeding the machine with warm water Wash with detergent solution Carry out a final washing with clean water After cleaning procedure, disconnect the dosing unit and freezer. Volume 04_UM_Language _Rev.00 Page 14 Filling machine VMF-L Use manual Cleaning CAUTION Before carrying out any operation on the machine, make sure that the power supply and pneumatic supply are turned off. At the end of the production all components in contact with ice cream should be well cleaned. To do this, disconnect the fitting of ice cream flow, remove the nozzles and the cells and make a thorough cleaning. Clean the linear table from possible ice-cream residues. For a proper manual washing, do the following: • • • • • Prewash with warm water (about 40°) Wash with detergent Wash with water at room temperature Wash with disinfectant, use disinfectant, dissolved in water in a ratio of 0.2% Finally wash with water at room temperature Size change CAUTION The components for size change are supplied only upon customer request in order to produce different tubs size. To change the tubs size it is necessary to replace some components of the machine. In this section you will find relevant instructions. CAUTION Before carrying out any operation make sure that the main switch is turned off and blocked by a lock. Also make sure that the compressed air supply is disconnected and the machine is completely stopped.. Cells replacement Replace the cells where the tubs are positioned, by removing the nuts which fix them to the linear table (chain). Cones loading station Remove the screws that fix the cones loading station to the machine, remove the loading station by moving it upwards and install the new one. Tighten the nuts and plug in the quick connections. Load the new cones. Filling machine VMF-L Page 15 Volume 04_UM_Language _Rev.00 Use manual Dosing unit To remove the nozzles of the dosing unit which must be replaced, act on the fixing nuts by means of an hexagonal key. Install new nozzles and tighten the nuts. To center new nozzles on a new tub, remove the nuts which fix the dosing devices to the support. Manually adjust their position, moving the dosing devices along the horizontal axle, till they are perfectly centered on the tub. Height of the dosing device is set by the control panel. Lids loading station Disconnect the air supply to the station, by removing the four quick connections. Remove the nuts that fix the lids loading station to the machine, remove the loading station by moving it upwards and install the new one. Tighten the nuts and plug in the quick connections. Replace the suction-caps system. To do this, remove quick connections and the nuts that fix the pistons. Replace the suction-cups device with the new one. Production debugging Put all replaced components in a distinct place where they will be protected from any bump and are apart from other sizes in order to avoid any confusion. Check whether you have forgotten tools in the machine and safety conditions are satisfied. Connect the air compressed supply and turn on the main switch. Press the RESET button. Choose a recipe to produce and run the cycle, for this last operation, use the control panel (touch screen). Volume 04_UM_Language _Rev.00 Page 16 Filling machine VMF-L Use manual Control panel and other components functions All push-buttons, selectors , signaling devices, and other control devices that are present on the panels of the system are listed and described in this paragraph. The machine is equipped with : • • Electric cabinet ; Auxiliary push-button operator panels. Code / Colour of the push-buttons and their meaning COLOUR MEANING EXPLANATION RED Emergency Press in case of emergency or danger YELLOW Abnormal Press in case of anomalous condition APPLICATION EXAMPLE Emergency stop Beginning of the emergency function Action to delete an anomalous condition Action to restart an interrupted automatic cycle GREEN Safety Press in case of safety conditions or to prepare a normal condition BLU Obligatory Press in case of condition which requires an obligatory action No specific meaning Used for the general start of the functions, except the emergency stop (see the note) Start (preferential) WHITE No specific meaning Used for the general start of the functions, except the emergency stop (see the note) Start No specific meaning Used for the general start of the functions, except the emergency stop (see the note) Start GREY BLACK Reset function Stop Stop Stop (preferential) NOTE When an additional means of coding (for example: structure, shape, position) for the switches / push-buttons identification is used, the same white, gray or black color can be used for different functions (for example: white is used for start and stop buttons). Filling machine VMF-L Page 17 Volume 04_UM_Language _Rev.00 Use manual Colours of light indicators and their meaning COLOUR RED MEANING Emergency EXPLANATION Dangerous conditions Abnormal Imminent critical condition GREEN Safety APPLICATION EXAMPLE Pressure /temperature Immediate action to outside safety limits. manage a dangerous Voltage drop situation (for ex. press Interruption outside the stroke emergency button) or stop position Anomalous conditions YELLOW OPERATOR’S ACTION Check and/or action (for ex. To reestablish the desired function) Normal condition Optional Pressure /temperature above the normal limits Safety device activation Pressure /temperature within the normal limits Authorization to proceed BLU WHITE Volume 04_UM_Language Obligatory Indicates the condition which requires an obligatory action by the operator Obligatory action Instruction to fill in the preselected values No specific meaning Other conditions: can be used every time when use of other colors – red, yellow, green, blu – is in doubt Check General information _Rev.00 Page 18 Filling machine VMF-L Use manual Control panel The control panel is equipped with a touch screen and different push-buttons and selectors , in particular : 1. 2. 3. 4. 5. 6. 7. 8. 9. Lamp of tension signaling Start push-button Stop push-button Jog push-button Key selector (Washing) Reset push-button Zero setting push-button Emergency mushroom button Multifunctional Touch Screen Main switch CAUTION This information is indicative, because the configuration of the panel can be different according to machine version. For detailed information see the electrical diagram enclosed to this manual. Filling machine VMF-L Page 19 Volume 04_UM_Language _Rev.00 Use manual Main switch Turning on the main switch supplies voltage to the machine. Lamp number 1 lights up. 1. Lamp of voltage signaling The lamp lights up when the main switch is ON. 2. Start button Enables the production cycle. The push-button lights up when a cycle is running. 3. Stop button Turns off the cycle and turns off the machine according to a determined sequence in order to restart the production from the stop point. Normally it is used when cones are finished or to take a break, stopping the machine in a work position but ready to continue the cycle. 4. Jog button Press and hold the button to move the machine at a set speed. If the button is released, the machine stops. It is used to verify the machine functioning. 5. Key selector (washing) It is used to carry out the washing cycle. 6. Reset button It resets the machine before starting or if any alarm has been occurred. If an alarm (or more) occurs the push-button flashes. 7. Zero setting button Press the button to reset all stations. This button should be pressed when a first start up is done and every time the electrical power supply to the machine is interrupted. When pressed, each station is set at cycle starting. 8. Emergency button Pressing the button stops all machine functions, providing safety conditions. To reset the system, you must before remove the cause for which the machine was stopped and unlock the push-button by turning it counterclockwise. After that, the reset button number 6 can be pressed. 9. Multifunctional Touch Screen Allows the operator to work with the machine. It is described in the next volume. Volume 04_UM_Language _Rev.00 Page 20 Filling machine VMF-L Video pages of the control panel Machine : FILLING MACHINE Type : VMF-L Video pages of the control panel Filling machine VMF-L Page 1 Volume 05_VPP_Language _Rev.00 Video pages of the control panel INDEX VIDEO PAGES OF THE CONTROL PANEL.................................................... PANEL.................................................................................................... 1 CONTROL PANEL DESCRIPTION .............................................................................................................................. 3 MAIN PAGE ............................................................................................................................................................. 4 STATION SETTINGS PAGE.................................................................................................................................... 6 CUPS LOADING PAGE........................................................................................................................................... 7 SPRAYING PAGE ................................................................................................................................................... 8 DOSING PAGE........................................................................................................................................................ 8 DOSING SECONDARY MENU PAGE (FOR ELECTRICAL DOSING).................................................................... 9 VERTICAL MANUAL MOVEMENT MENU PAGE ................................................................................................. 10 CROSS MANUAL MOVEMENT MENU PAGE ...................................................................................................... 11 LONGITUDINAL MANUAL MOVEMENT MENU PAGE ...................................................................................... 12 DOSING PARAMETERS MENU PAGE................................................................................................................. 13 MICRO DOSING PAGE........................................................................................................................................ 14 TOPPING PAGE................................................................................................................................................... 14 COCOA PAGE....................................................................................................................................................... 15 LIDS LOADING PAGE........................................................................................................................................... 15 LIDS PRESSING PAGE ........................................................................................................................................ 16 FINAL PRODUCT UNLOADING PAGE................................................................................................................. 17 UNLOADING SECONDARY MENU PAGE (USED FOR THE MACHINE СС) ...................................................... 18 CRUMBS PAGE .................................................................................................................................................... 18 MAINTENANCE PAGE......................................................................................................................................... 19 MANUAL COMMANDS PAGE............................................................................................................................... 19 CHAIN PAGE......................................................................................................................................................... 21 PASSWORD AND PANEL MAINTENANCE PAGE............................................................................................. 22 CALIBRATION AND LANGUAGE CHOICE PAGE................................................................................................ 23 Volume 05_VPP_Language _Rev.00 Page 2 Filling machine VMF-L Video pages of the control panel Control panel description Any machine settings and control input are set up by a touch-screen panel and by the proper pushbuttons and selectors positioned on the machine front side. For an easier use of the touch screen panel , it is suggested to utilise a narrow object like a ballpoint pen with cap, a pencil or something similar. Fingers might be too large for centring the sensitive areas. The main page is automatically displayed when the panel is turned on. Language set is the one used during previous cycle till turning off. When the panel is ON, it is possible to choose in which language display machine data and information. To change the language, press the corresponding push-button in the first page of the monitor, as shown in the picture. After the language selection, press anywhere on the panel to enter the main menu. It is also possible to change the language during the cycle from the “password menu” page, described here below. Filling machine VMF-L Page 3 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Main page From the main page you can enter the most important control inputs for the machine working and go to secondary menus. Configuration In this section, there are the configuration settings. Chain In this section, there are the chain settings Speed (l / h) It allows you to set the product quantity coming from the freezer to the machine (expressed in l/h, where liters indicate the ice-cream quantity) and therefore the speed cycle It can be set from 400 to 1000 l/h, depending on the available freezer capacity Product It refers to the type of recipe used. Select this item to open RECIPES menu. Cones loading Enables / disables the cones loading. When the key is enabled , it gets a dark background. It allows you to enter the Loading cones menu. Dosing Enable / disable the dosing group. When the key is enabled, it gets a dark background. It allows you to enter the dosing unit menu. Lids loading Enable / disable the lids loading. When the key is enabled, it gets a dark background. It allows you to enter the lids loading menu – Volume 05_VPP_Language _Rev.00 Page 4 Filling machine VMF-L Video pages of the control panel Cups loading Enable / disable the loading of cups. When the key is enabled, it gets a dark background. It allows you to enter the cups loading menu. Calibration Enable / disable the calibration. When the key is enabled, it gets a dark background. It allows you to enter the calibration menu. Topping Enable / disable the topping. When the key is enabled, it gets a dark background. It allows you to enter the topping menu. Micro dosing units Enable / disable the micro dosing units for micro dosing . When the key is enabled, it gets a dark background. It allows you to enter the micro dosing menu . Spraying of cacao Enable / disable the spraying. When the key is enabled, it gets a dark background. It allows you to enter the spraying menu. Cocoa Enable / disable the cocoa dosing. When the key is enabled, it gets a dark background. It allows you to enter the cocoa dosing menu. Unloading Enable / disable the tubs unloading. When the key is enabled, it gets a dark background. It allows you to enter the tubs unloading menu. Filling machine VMF-L Page 5 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Station settings page By this page you can set the general settings of the selected station working and enter the secondary menu of each station. • • • • • • • • • • • • Cups loading (if pressed, setting page is displayed) Cones loading (if pressed, setting page is displayed) Calibration (if pressed, setting page is displayed) Spraying (if pressed, setting page is displayed) Dosing (if pressed, setting page is displayed) Micro dosing (if pressed, setting page is displayed) Topping (if pressed, setting page is displayed) Cocoa (if pressed, setting page is displayed) Lids loading (if pressed, setting page is displayed) Pressing (if pressed, setting page is displayed) Unloading station (if pressed, setting page is displayed) Crumbs (if pressed, setting page is displayed) If you press the push-button DATA the corresponding page is displayed. Volume 05_VPP_Language _Rev.00 Page 6 Filling machine VMF-L Video pages of the control panel Cups loading page From “station settings” menu page, press SET (Settings) to enter the cups loading Menu. On this page you can set the loading timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values (angular degrees referred to cycle position) when the operation stops. On this page you can set t: • • • • • Loading electrical valve Shutter electrical valve Blowing electrical valve Vacuum electrical valve Cams common correction Filling machine VMF-L Page 7 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Spraying page From “station settings” menu page, press SET (Settings) to enter the Spraying Menu. On this page you can set spraying and pump ON/OFF time. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (extension) shows the values ( angular degrees referred to cycle position) when the operation stops. Dosing page From “station settings” menu page, press SET (Settings) to enter the Dosing Menu. On this page you can set : • Electrical axle starting • Dosing valve 1 • Dosing valve 2 • Cams common settings • Cycle total duration Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (extension) shows the values ( angular degrees referred to cycle position) when the operation stops. Volume 05_VPP_Language _Rev.00 Page 8 Filling machine VMF-L Video pages of the control panel Dosing secondary menu page (for electrical dosing) On this page you can set : • • • Vertical synchronization value Cross synchronization value Longitudinal synchronization value • • • Display the vertical dosing page Display the cross dosing page Display the longitudinal dosing page Filling machine VMF-L Page 9 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Vertical manual movement menu page By this page you can move manually (up-down) the vertical dosing axle. The parameters which should be set and displayed are the following: • • • • • • Dosing unit real value Interference value in mm Requested value in mm Slope Jog speed Positioning speed Volume 05_VPP_Language _Rev.00 Page 10 Filling machine VMF-L Video pages of the control panel Cross manual movement menu page By this page you can move manually (left-right) the cross dosing axle. The parameters which should be set and displayed are the following: • • • • • • • Dosing unit real value Max right value in mm Max left value in mm Requested value in mm Slope Jog speed Positioning speed Filling machine VMF-L Page 11 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Longitudinal manual movement menu page By his page you can move manually (forward-back) the longitudinal dosing axle. The parameters which should be set and displayed are the following: • • • • • • • Dosing unit real value Max forward value in mm Max backward value in mm Requested value in mm Slope Jog speed Positioning speed Volume 05_VPP_Language _Rev.00 Page 12 Filling machine VMF-L Video pages of the control panel Dosing parameters menu page On this page there are the following parameters: • • • • • • • Total machine cycle duration in sec. Machine break duration in sec. Machine break degrees in°C Settings of %, used for dosing Dosing duration in sec. Dosing degrees in °C Dosing speed Filling machine VMF-L Page 13 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Micro dosing page From “station settings” menu page, press SET (Settings) to enter the Micro dosing. On this page you can set the micro dosing timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (extension) shows the values ( angular degrees referred to cycle position) when the operation stops. Topping page From “station settings” menu page, press SET (Settings) to enter the Topping Menu. On this page you can set the topping timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Moreover, tank resistances and temperature values can be set in this page. Volume 05_VPP_Language _Rev.00 Page 14 Filling machine VMF-L Video pages of the control panel Cocoa page From “station settings” menu page, press SET (Settings) to enter the Cocoa Dosing Menu. On this page you can set the cocoa dosing timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Lids loading page From “station settings” menu page, press SET (Settings) to enter the Lids Loading Menu. On this page you can set the lids loading timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Filling machine VMF-L Page 15 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Lids pressing page From “station settings” menu page, press SET (Settings) to enter the Lids Pressing Menu . On this page you can set the lids pressing timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Volume 05_VPP_Language _Rev.00 Page 16 Filling machine VMF-L Video pages of the control panel Final product unloading page From “station settings” menu page,press SET (Settings) to enter the Unloading Menu. On this page you can set the unloading process timing compared to the machine production speed. On this page you can set: • • • • Ejection solenoid valve Motor Lifting solenoid valve Handling device solenoid valve (Pick-up grippers) Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Filling machine VMF-L Page 17 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Unloading secondary menu page (used for the machine СС) Page of Unloading.secondary menu. The graphs display real values and possible manual correction of the data. Crumbs page From “station settings” menu page, press SET (Settings) to enter the Crumbs Dosing Menu. On this page you can set the crumbs dosing timing compared to the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. Volume 05_VPP_Language _Rev.00 Page 18 Filling machine VMF-L Video pages of the control panel Maintenance page Maintenance Menu Page. On this page you can enable the stations and see the production data. Manual commands page By this page it is possible to set dosing data in manual mode.. By pressing push-button Manuali 1 (Manual 1), you enter the following page. Filling machine VMF-L Page 19 Volume 05_VPP_Language _Rev.00 Video pages of the control panel By this page it is possible to set the machine stations and their corresponding commands in manual mode By this page it is possible to set manual movements of the following stations : • • • • Cups Loading Cones Loading (if supplied) Calibration Spraying If you press the push-button Manuali 2 (Manual 2), you enter the following page. By this page it is possible to set manual movements of the following stations : • • • • • • • Lids loading Final product unloading Pressing Microdosing Topping Cocoa Crumbs Volume 05_VPP_Language _Rev.00 Page 20 Filling machine VMF-L Video pages of the control panel Chain page From “station settings” menu page, press SET (Settings) to enter the Chain Menu . On this page you can set chain movement start and chain pitch to optimize the machine production speed. Column CAMMA ON (CAM ON.) shows the values (angular degrees referred to cycle position) when the operation starts. Column AMPIEZZA (EXTENSION) shows the values ( angular degrees referred to cycle position) when the operation stops. On this page you can see: • Master angular position in degrees • Shutter position in mm One more function is the Jog forward and backward movement of the shutters. By pressing the SET DATA button you open the following page: On this page all data referring to speed, movement and slope of the chain are displayed. Filling machine VMF-L Page 21 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Password and panel maintenance page Press PASSWORD from the Recipes Menu . Access passwords for the different functions are set by 3 levels of users during the machine testing : • 1° level for the standard user (operator) • 2°level for the line person in charge (maintenance technician) • 3°level for the company person in charge The passwords are supplied to the customer in a separate way from the present manual. For detailed information contact the technical office of Teknoice Srl. It’s possible to memorize the values which are different for every products in order to recall them en bloc when the process production changes. In this way it is not necessary to digit the values one by one and any risk of error is greatly reduced. Commands on this page are protected by the password = xxxx. On this page you can: • Create a new recipe • Save the changes if an existing recipe has been corrected • Choose a recipe from the saved recipes • Transfer a recipe to PLC, in order to use it for production • See the recipe in use Volume 05_VPP_Language _Rev.00 Page 22 Filling machine VMF-L Video pages of the control panel Calibration and Language choice page On this page you can: • Open the Recipes page • Clean the screen display without making any operation • Calibrate the touch screen contrast • Regulate the digit pressure on the control panel • Enable or disable the password Press TEKNOICE, to come back to the main menu. Filling machine VMF-L Page 23 Volume 05_VPP_Language _Rev.00 Video pages of the control panel Volume 05_VPP_Language _Rev.00 Page 24 Filling machine VMF-L Maintenance of the machine Machine : FILLING MACHINE Type : VMF-L Maintenance of the machine Filling machine VMF-L Page 1 Volume 04_MM_Language _Rev.00 Maintenance of the machine INDEX MAINTENANCE OF THE MACHINE .................................................... ...................................................................................................... ............................................................ 1 SAFETY PRECAUTIONS ............................................................................................................................................. 3 INSPECTION ........................................................................................................................................................... 3 RESTORATION ....................................................................................................................................................... 3 REDUCING DOWNTIME AFTER FAILURE ...................................................................................................... 3 MAINTENANCE PRECAUTIONS ................................................................................................................................. 4 GENERAL INFORMATION...................................................................................................................................... 5 QUALIFICATION OF THE STAFF ........................................................................................................................... 5 PERIODICAL MAINTENANCE ..................................................................................................................................... 6 TABLE WITH MAINTENANCE SUMMARY.................................................................................................................. 6 EVERYDAY MAINTENANCE .................................................................................................................................. 7 DOSING DEVICES ............................................................................................................................................ 8 NOZZLES........................................................................................................................................................... 8 WORKTOP......................................................................................................................................................... 8 WEEKLY MAINTENANCE ....................................................................................................................................... 9 DOSING DEVICES ................................................................................................................................................ 10 CLASS OF TIGHTENING ................................................................................................................................ 10 TIGHTENING TORQUE (NM) .......................................................................................................................... 11 MONTHLY MAINTENANCE .................................................................................................................................. 13 WORKTOP....................................................................................................................................................... 13 CHAIN FOR MOVEMENT................................................................................................................................ 13 THREE-MONTH MAINTENANCE ......................................................................................................................... 15 YEARLY MAINTENANCE..................................................................................................................................... 17 ELECTRIC PARTS ................................................................................................................................................ 19 ELECTRIC MOTORS ............................................................................................................................................ 21 PNEUMATICS ....................................................................................................................................................... 23 COMMON REGULATIONS AND OPERATIONS ............................................................................................. 25 PRESSURE RELAY ................................................................................................................................................................................. 25 ELECTRIC VALVES ................................................................................................................................................................................. 25 PRESSURE REGULATOR....................................................................................................................................................................... 26 FLOW REGULATOR ................................................................................................................................................................................ 26 TROUBLESHOOTING........................................................................................................................................... 27 MAINTENANCE OPERATIONS REGISTRATION TABLES ...................................................................................... 31 EVERY DAY .......................................................................................................................................................... 31 EVERY WEEK ....................................................................................................................................................... 32 EVERY MONTH..................................................................................................................................................... 33 EVERY 4 MONTHS ............................................................................................................................................... 34 EVERY 6 MONTHS ............................................................................................................................................... 35 EVERY YEAR ........................................................................................................................................................ 36 Volume 04_MM_Language _Rev.00 Page 2 Filling machine VMF-L Maintenance of the machine Safety precautions According to the Regulation DIN 31051, the term "maintenance" includes the following fields of activity: Inspection The inspection covers those measures intended to recognize the actual conditions of the machine, that is to identify the reasons and ways in which the wear decreases. Restoration The restoration covers those actions to obtain the desired conditions, that is to compensate the reduction of performance and restore the wear. The personnel authorized to use and carry out the machine maintenance must be well trained and must have a thorough knowledge of safety regulations. Unauthorized personnel must remain outside of work area during maintenance operations. Safety precautions must always be strictly respected during the operation and machine maintenance in order to avoid any injury to personnel and any damage to machinery. These precautions will be recalled and further detailed each time it will be required a procedure which may cause any risk of harm or injury, by notes of CAUTION and DANGER. • CAUTION notes go before an operation, which may cause damage to equipment, if incorrectly carried out. • DANGER notes go before an operation, which may expose to risk the operator, if incorrectly carried out. Reducing downtime after failure Please note that a maintenance properly carried out can minimize downtime after a failure. Timely repair prevents from further deterioration. Use, where possible, original spare parts and do an accurate repair of the damaged components at your plant or send them for repair to the company Teknoice Srl. For any possible troubles or to order spare parts, contact the technical assistance of the company Teknoice Srl. Filling machine VMF-L Page 3 Volume 04_MM_Language _Rev.00 Maintenance of the machine Maintenance precautions CAUTION It is recommended to carry out the maintenance operations without voltage and pressure supply to the machine. 1. Before maintenance expose in well visible places the warnings “MAINTENANCE IN PROGRESS". 2. Access to the machine is allowed only to authorized personnel. 3. The use of any cleaning solvent should be done carefully, paying particular attention to cables. 4. Do not modify or altered the machine structure, the sequence of operation or otherwise, without a notice in writing to the company Teknoice Srl. 5. Maintenance operations must be reported in the enclosed tables at thet end of the chapter, by reporting date, type of intervention and signature of who carries out the operation. 6. Any maintenance operation should refer to what is written in this chapter. Volume 04_MM_Language _Rev.00 Page 4 Filling machine VMF-L Maintenance of the machine General information Write all functions subjected to inspection and maintenance in appropriate tables or lists to keep a history of carried out operations and to be checked by employees of other level. This form must include: • Date; • Type of intervention; • Signature of person who carries out the operation. The inspection items are to be distinguished regarding to control frequency, for example daily, weekly, monthly; furthermore they have to carried out before a long shutdown of the system, for example before holiday closing. Maintenance and inspection required by law must be carried out irrespective of the objectives related to the function preservation, since they guarantee the safety of personnel involved in the machine use and to avoid any possible damage: the proper documentation of these operations must be kept carefully by the Customer. Technical documentation and the most important tools must be kept near the work place in order to shorten as much as possible troubleshooting and the machine repair. In case of removal of safety devices, before restarting the machine, check that they have been reinstalled and are working. Any use of cleaning solvents should be carried out with extreme care, paying a particular attention to the cables. Do not use organic solvents near hot surfaces. It is preferable to use water-based solvents. Any maintenance operation should refer to the instructions of this manual. Qualification of the staff Maintenance can be performed safely by skilled personnel authorized to the machine use, preparation and maintenance, who have read and understood the recommendations and instructions of this manual. Filling machine VMF-L Page 5 Volume 04_MM_Language _Rev.00 Maintenance of the machine Periodical maintenance The recommended frequency of these operations regards an 8-hour workday and it is indicative. If the machine is working in several shifts during 24 hours, the maintenance frequency should be adjusted properly. Also, the maintenance frequency may vary depending on the type of production, machine working environment, temperature, etc. The maintenance technicians should estimate the frequency of operations basing on personal experience. Table with maintenance summary N° GROUP INTERVENTION 01 Machine Everyday maintenance 02 Machine Weekly maintenance 03 Machine Monthly maintenance 04 Machine Three-month maintenance 05 Machine Annual maintenance 06 Electrical parts Inspection and cleaning 07 Electrical motors Inspection and maintenance 08 Pneumatics Inspection and maintenance 09 Machine Troubleshooting Volume 04_MM_Language _Rev.00 Page 6 EVERY See form See form See form See form See form See form See form See form See form Filling machine VMF-L Maintenance of the machine Everyday maintenance FORM n° 01 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: machine Intervention: washing Operator: 1 At the end of production you should wash the following components: • Dosing devices • Nozzles • Worktop WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Filling machine VMF-L Page 7 Volume 04_MM_Language _Rev.00 Maintenance of the machine Dosing devices At the end of production, do the automatic washing by using the freezers. Remember to put a container under the dosing unit (there is a slide) to collect the detergent solution and dispose it. See instruction about washing in the section Use manual. Nozzles At the end of production remove nozzles and wash them accurately, eliminate any incrustation and impurity. Worktop At the end of production wash with water and detergent, eliminate any product residues on the worktop of the machine. The water after washing should be disposed in conformity with the local law in force. CAUTION • Don’t use acid detergents or detergents with chlorine, outside those recommended. • Hydrochloric acid damages inox steel and chromium, generating micro pores. • Don’t use temperature above 90 °C. • Pay close attention to the choice of detergents and disinfectants, concentrations, temperature and contact time with the machine components. • Refer to the specifications for the use of the solutions recommended by the manufacturer. Volume 04_MM_Language _Rev.00 Page 8 Filling machine VMF-L Maintenance of the machine Weekly maintenance FORM n° 02 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: machine Intervention: mechanical maintenance Operator: 1 CAUTION To avoid any risk for the persons or the machine, we recommend that only the specialized personnel perform the machine maintenance. Before you remove the guards, push the emergency button and cut off power supply to the machine by means of main switch WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Filling machine VMF-L Page 9 Volume 04_MM_Language _Rev.00 Maintenance of the machine Dosing devices Remove dosing devices, wash them and grease with Vaseline or food grease. Dismantling of dosing device To remove dosing device and nozzles proceed as follows: 1. 2. 3. 4. 5. 6. disconnect air supply to the dosing unit by quick connections unscrew nuts by using the key from accessories remove the rod of the dosing device taking it off upwards grease the gasket OR with Vaseline or food grease wash nozzles, eliminate any incrustation and impurity assemble all components following the instruction in the opposite direction Class of tightening In this section we determine the nominal torque values and their tolerances to be applied for tightening of bolts, according to the applications, in order to ensure the functional aspects. TOLERANCES CLASS OF TIGHTENING APPLICATIONS WITH REFERENCE TO THE NOMINAL TORQUE I Very demanding: for highly stressed connections, subjected to vibration, shock, high traction or abrupt movements, reduction gears, racks, rods, arrests translation, alternating loads and movement components in general, raised dynamic loads. ± 5% Must be checked every 6 months with torque indicating wrench. Demanding: for use not subjected to excessive vibration, but where you need a good security of tightness (frames, static raised loads, precise clamping, pallets, rolls, tongs supports). II Must be checked yearly, torque indicating wrench is recommended. + 5% - 15% Not very demanding: just a little stressed or minor use (small blocks, references, platforms, guards). III Volume 04_MM_Language Must be checked whenever working on the machine, tightening characteristics can be modified according to the operation performed. _Rev.00 Page 10 + 5% - 35% Filling machine VMF-L Maintenance of the machine Tightening torque (NM) CLASS OF TIGHTENING WRENCH III II I OPENING OF THE THREAD SCREW CLASS OF SCREW RESISTANCE 8,8 AND/OR 10,9 12,9 CLASS OF NUT RESISTANCE NUT 8 10 12 M4 7 2,3 3,3 4 M5 8 4,8 6,8 8 M6 10 8 11,2 13,6 M8 13 20 28 32,8 M10 17 39,2 55,2 66,4 M12 19 68,8 96 116 M14 22 108 152 184 M16 24 168 236 284 M18 27 232 324 388 M20 30 328 464 552 M22 32 440 624 744 M24 36 568 800 960 M27 41 840 1200 1440 M30 46 1160 1600 1920 Filling machine VMF-L Page 11 Volume 04_MM_Language _Rev.00 Maintenance of the machine Volume 04_MM_Language _Rev.00 Page 12 Filling machine VMF-L Maintenance of the machine Monthly maintenance FORM n° 03 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: machine Intervention: mechanical maintenance Operator: 1 Worktop Grease bearings by the lubricator. Chain for movement Grease the chain using a brush. To access to the chain remove the safety panel at the side of the machine. WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Filling machine VMF-L Page 13 Volume 04_MM_Language _Rev.00 Maintenance of the machine Volume 04_MM_Language _Rev.00 Page 14 Filling machine VMF-L Maintenance of the machine Three-month maintenance FORM n° 04 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: machine Intervention: transmission chain Operator: 1 Check the chain tension that transmits the movement to the linear table. If the chain is loosen (more than 1,5 cm) adjust it. Filling machine VMF-L Page 15 Volume 04_MM_Language _Rev.00 Maintenance of the machine WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Volume 04_MM_Language _Rev.00 Page 16 Filling machine VMF-L Maintenance of the machine Yearly maintenance FORM n° 05 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: machine Intervention: inspection Operator: 1 Dosing device Replace the gaskets of dosing devices. To carry out this operation, see Form n. 4. Electrical scheme Check the connections and preservation of cables. Machine Perform a general inspection. WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Filling machine VMF-L Page 17 Volume 04_MM_Language _Rev.00 Maintenance of the machine Volume 04_MM_Language _Rev.00 Page 18 Filling machine VMF-L Maintenance of the machine Electric parts FORM n° 06 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: Electric unit Intervention: Electric maintenance Operator: 1 Check the correct operation of the following devices before starting each production cycle: • Emergency button • Warning lights and light push-buttons • Mode selectors Moreover, you must check any: • Photocell • Limit switch • Guards • Other safety devices installed. Filling machine VMF-L Page 19 Volume 04_MM_Language _Rev.00 Maintenance of the machine WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Check the filter on air intakes: • Clean if dirty • Replace if needed Check correct working of the cooling fan. Replace filter after one year. CAUTION Carry out all maintenance operations only when the system is switched off and there is no electrical and pneumatic supply. Volume 04_MM_Language _Rev.00 Page 20 Filling machine VMF-L Maintenance of the machine Electric motors FORM n° 07 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: Machine Intervention: Electrical motors Operator: 1 Filling machine VMF-L Page 21 Volume 04_MM_Language _Rev.00 Maintenance of the machine WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. Check and clean the cooling filter of electrical motor. See other details in the technical documentation enclosed to the manual. Volume 04_MM_Language _Rev.00 Page 22 Filling machine VMF-L Maintenance of the machine Pneumatics FORM n° 03 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: Pneumatic unit Intervention: Pneumatic maintenance Operator: 1 The machine is equipped with pressure reducer / filter with automatic condensate discharge, which allows to use compressed air, although if not previously treated. The pneumatic system, limited to control of pressure of homogenization, control of mixture flow and pasteurization water, doesn’t require special maintenance. Filling machine VMF-L Page 23 Volume 04_MM_Language _Rev.00 Maintenance of the machine WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. The supplied air is filtered to 35 microns by means of the filter. The operating pressure in the working circuit (6 bar) is set by the regulator and displayed on the installed pressure gauge. The supplied pressure must always be at least 1 bar higher than the pressure of the working circuit, so that any pressure changes can not affect the proper functioning of the pneumatic circuit. Check the pressure at the beginning of each workday. CAUTION Never clean the transparent cups of the filter with alcohol, but use gasoline or oil. Volume 04_MM_Language _Rev.00 Page 24 Filling machine VMF-L Maintenance of the machine Common regulations and operations Pressure relay The pressure relay in the figure (similar to the one used in the system) must be set at a pressure of 4 bar for the proper functioning of the machine. The adjustment can be done with a screwdriver or an Allen wrench. In this way the machine will not start with a lower pressure than the set one. Electric valves The pneumatic electric valves of type ISO 1, ISO 2, ISO 3 showed in the figure can be driven manually pushing at points B as shown. Filling machine VMF-L Page 25 Volume 04_MM_Language _Rev.00 Maintenance of the machine Pressure regulator A pressure regulator allows to adjust the pressure in the pneumatic circuit to 6 bar, rotating the knob as shown in the figure and checking the settings on the pressure gauge. Please note that the supplied pressure of the network should be slightly higher than 6 bar (about one bar more in order not to affect the smooth operation of the machine). Flow regulator The flow regulator is normally installed close to the place of use (pneumatic cylinder). The adjustment must be carried out with a screwdriver and has to slow down (clockwise) or increase (counterclockwise) the flow speed. Volume 04_MM_Language _Rev.00 Page 26 Filling machine VMF-L Maintenance of the machine Troubleshooting FORM n° 09 CLEANING WASHING INSPECTION ELECTRIC UNIT MECHANICS PNEUMATICS Group: Machine Intervention: Troubleshooting and inspection Operator: 1 PROBLEM Power LED is off CAUSE SOLUTION a) The lamp is broken a) Replace b) The main switch is off b) Switch ON c) The emergency device is activated c) Disactivate and reset d) Check d) There is no power supply a) There is no compressed air b) Tunnel door is open Motor of the chain conveyer doesn’t c) Maintenance switches are ON start or stop d) Thermoswitch intervention e) Inverter allarm intervention It’s not possible to modify the motor a) – Limit values already reached speed of the chain b) – Inverter allarm / failure conveyer Brush for trays washing doesn’t start or stop Filling machine VMF-L a) Check b) Close c) Switch off d) Rearm e) Check any mechanical problem a) b) - Rearm / replace a) – Motor of the chain conveyer is stopped a) – Start b) - Thermoswitch intervention b) - Rearm Page 27 Volume 04_MM_Language _Rev.00 Maintenance of the machine WARNING! Identify the area of intervention and block by the appropriate lock the main switch in OFF position after putting all components out of service. Expose the sign "MACHINE MAINTENANCE - DO NOT TURN ON ELECTRICAL POWER" near the main switch. Later on disconnect safety devices and remove guards. The operator works in risk circumstances. Therefore the following rules must be respected: • Authorized persons must be informed about the operations to be carried out and about any possible danger to which they are exposed during such operations and about proper use of safety devices installed on the system. • The operator must pay attention and work with caution. • Before starting the inspection or maintenance the maintenance personnel shall turn off the system and use all safety measures and precautions required. PROBLEM CAUSE Lifting cylinder failure Loading unit Tubs ejection cylinder failure Unloading group Pressure of compressed air is too low, there is no compressed air Pressure of compressed air is too low there is no compressed air Dosing unit movement not synchronized Encoder failure Encoder is broken or not correctly connected Proximity failure Proximity is broken or not correctly connected Linear table movement not Dosing cycle is not set correctly possible – Dosing unit interference Emergency device An emergency button was pressed intervention Motor thermal switch Volume 04_MM_Language Motor breaker of the linear table is activated _Rev.00 Page 28 SOLUTION Check. Air pressure is set by the proper reducer positioned in the lower part of auxiliaries support. After you have eliminated the cause, push the RESET button on the control panel. Check. Air pressure is set by the proper reducer positioned in the lower part of auxiliaries support. After you have eliminated the cause, push the RESET button on the control panel. Check the motor. After you have eliminated the cause, push the RESET button on the control panel. Check and replace. After you have eliminated the cause, push the RESET button on the control panel. Bring nearer or replace. Change settings. After you have eliminated the cause, push the RESET button on the control panel. After you have eliminated the cause, push the RESET button on the control panel. Check the motor. After you have eliminated the cause, push the RESET button on the control panel. Filling machine VMF-L Maintenance of the machine PROBLEM CAUSE Dosing unit motor Tension is not constant fuses intervention Inverter failures Dosing process failure No air in the machine Tension is not constant. Torque alarm intervention Tension is not constant. Pressure is low or there is no air SOLUTION Check tension. After you have eliminated the cause, push the RESET button on the control panel. Check tension. Check if there is any mechanical problem. After you have eliminated the cause, push the RESET button on the control panel. Check tension. Check if there is any mechanical problem. Use the technical manual. After you have eliminated the cause, push the RESET button on the control panel. Air pressure is set by the proper reducer in the lower side of auxiliaries support. Set on 6 bar. Extra stroke intervention Dosing unit upstroke Check and correct After you have Settings of production are not correct eliminated the cause, push the RESET button on the control panel. Extra-stroke intervention Dosing unit downstroke Check and correct After you have Settings of production are not correct eliminated the cause, push the RESET button on the control panel. Production speed Speed is not correctly set too high Filling machine VMF-L Page 29 Reduce. After you have eliminated the cause, push the RESET button on the control panel. Volume 04_MM_Language _Rev.00 Maintenance of the machine Volume 04_MM_Language _Rev.00 Page 30 Filling machine VMF-L Maintenance of the machine Maintenance operations registration tables These tables have to be filled in by the Customer every time any maintenance operation has been carried out. Every day DAY MAINTENANCE DATE OPERATOR’S SIGNATURE MONDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ TUESDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ WEDNESDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ THURSDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ FRIDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ SATURDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ SUNDAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOTE: Make copies of this page and keep always the tables updated. Filling machine VMF-L Page 31 Volume 04_MM_Language _Rev.00 Maintenance of the machine Every week WEEK MAINTENANCE DATE OPERATOR’S SIGNATURE ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOTE: Make copies of this page and keep always the tables updated. Volume 04_MM_Language _Rev.00 Page 32 Filling machine VMF-L Maintenance of the machine Every month MONTH MAINTENANCE DATE OPERATOR’S SIGNATURE JANUARY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ FEBRUARY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ MARCH 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ APRIL 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ MAY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ JUNE 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ JULY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ AUGUST 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ SEPTEMBER 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ OCTOBER 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOVEMBER 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ DECEMBER 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ Filling machine VMF-L Page 33 Volume 04_MM_Language _Rev.00 Maintenance of the machine Every 4 months MESE MAINTENANCE DATE OPERATOR’S SIGNATURE JANUARY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ APRIL 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ JULY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ OCTOBER 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOTE: Make copies of this page and keep always the tables updated. Volume 04_MM_Language _Rev.00 Page 34 Filling machine VMF-L Maintenance of the machine Every 6 months MESE MAINTENANCE DATE OPERATOR’S SIGNATURE JANUARY 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ JUNE 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOTE: Make copies of this page and keep always the tables updated. Filling machine VMF-L Page 35 Volume 04_MM_Language _Rev.00 Maintenance of the machine Every year YEAR MAINTENANCE DATE OPERATOR’S SIGNATURE ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ ______ 1.____________________ 2.____________________ 3.____________________ ___________ ___________ ___________ ___________________ ___________________ ___________________ NOTE: Make copies of this page and keep always the tables updated. Volume 04_MM_Language _Rev.00 Page 36 Filling machine VMF-L Diagrams volume Machine : FILLING MACHINE Type : VMF-L Diagrams Volume Filling machine VMF-L Page 1 Volume 07_DV_Language _Rev.00 Diagrams volume INDEX OF CHAPTER DIAGRAMS VOLUME. VOLUME............................................................. ERRORE. IL SEGNALIBRO NON È DEFINITO. INDEX OF DIAGRAMS ........................................................................ERRORE. IL SEGNALIBRO NON È DEFINITO. Volume 07_DV_Language _Rev.00 Page 2 Filling machine VMF-L Diagrams volume Index of diagrams See all diagrams in the documentation on the Cd-rom and/or attached to the present manual. • Layout • Electric diagram • Pneumatic diagram Filling machine VMF-L Page 3 Volume 07_DV_Language _Rev.00 Diagrams volume Volume 07_DV_Language _Rev.00 Page 4 Filling machine VMF-L Spare parts volume Machine : FILLING MACHINE Type : VMF-L Spare parts volume Filling machine VMF-L Page 1 Volume 08_SP_Language _Rev.00 Spare parts volume INDEX OF CHAPTER SPARE PARTS VOLUME.................................................... VOLUME...................................................................................................... ............................................................................. 1 STANDARD SPARE PART .......................................................................................................................................... 3 Volume 08_SP_Language _Rev.00 Page 2 Filling machine VMF-L Spare parts volume Standard spare part The machine is shipped with a set of standard spares. They may be used for installation, such as piping, pipe clamps and rubber holders; for the machine routine operation, or to quickly fix little problems that may occur in production. See the documentation of Assemblies group. Filling machine VMF-L Page 3 Volume 08_SP_Language _Rev.00 Spare parts volume Volume 08_SP_Language _Rev.00 Page 4 Filling machine VMF-L Machine dismantling Machine : FILLING MACHINE Type : VMF-L Machine dismantling Filling machine VMF-L Page 1 Volume 09_MD_Language _Rev.00 Machine dismantling INDEX OF CHAPTER MACHINE DISMANTLING.................................................... DISMANTLING...................................................................................................... ............................................................................ 1 WARNINGS................................................................................................................................................................... 3 INSTRUCTIONS FOR EXTENDED INACTIVITY .................................................................................................... 3 DEMOLITION........................................................................................................................................................... 3 RESIDUAL RISKS ................................................................................................................................................... 4 Volume 09_MD_Language _Rev.00 Page 2 Filling machine VMF-L Machine dismantling Warnings Before you start any operation on the machine, carefully read the sections “Use manual” and “Machine maintenance”. Carefully read the section related to Personal Protection Equipment. Instructions for extended inactivity No particular procedure is required for extended rest periods. It is absolutely necessary to thoroughly clean the machine components, removing any material residues. Demolition Once the machine has reached the end of its service lifetime, it must be put out of commission so it can not be used for the purposes it was designed for and so as to make reuse of its parts and materials possible. The machine must be deactivated and demolished safely to prevent the risk of impacts due to the presence of moving parts or stored energy. Teknoice S.r.l. declines all responsibility for damages to things or injuries to people caused by reuse of the separate machine parts for functions other than the original ones. 1. Disconnect the machine from any energy source (e.g.: electric, pneumatic, water, hydraulic, etc.). 2. Disassemble the various components, if necessary referring to the diagrams and the layout attached to this manual. In the case of machine handling, lifting and transport, refer to the section “Transport and installation” and to the assembly diagrams attached to this manual. Disassemble the machine according to the various units, using tools and instruments normally found in maintenance stores, so as to be moved and transported. Separate the potentially hazardous components, such as: • • • Plastic or polymer-based materials, etc... Electric components, cables, etc... Metal components by type, such as aluminium, steel, etc. Always bear in mind that the disposal of toxic and harmful waste is subject to special rules, depending on the country. You must become familiar with these rules before carrying out any operation of this type. Contact the Teknoice S.r.l. Technical Service should you have any doubts or need further information. Filling machine VMF-L Page 3 Volume 09_MD_Language _Rev.00 Machine dismantling Residual risks The machine does not present residual risks if prepared for demolition according to the procedures provided in the foregoing section. Volume 09_MD_Language _Rev.00 Page 4 Filling machine VMF-L Manual attachments Machine : FILLING MACHINE Type : VMF-L Manual attachments Filling machine VMF-L Page 1 Volume 10_MA_Language _Rev.00 Manual attachments INDEX OF CHAPTER MANUAL ATTACHMENTS.................................................... ATTACHMENTS...................................................................................................... ........................................................................... 1 CERTIFICATES ............................................................................................................................................................ 3 SUPPLIERS’ MANUALS .............................................................................................................................................. 3 Volume 10_MA_Language _Rev.00 Page 2 Filling machine VMF-L Manual attachments Certificates See all attachments of the “Use and maintenance manual” in the Cd-rom documentation and/or attached to this manual. Manufacturer/ Supplier Documentation: • • Declaration of Conformity Certificat. Teknoice Siemens Suppliers’ manuals See all attachments of the “Use and maintenance manual” in the Cd-rom documentation and/or attached to this manual. Manufacturer/ Supplier Documentation: • Use manual Siemens Filling machine VMF-L Page 3 Volume 10_MA_Language _Rev.00 Manual attachments Volume 10_MA_Language _Rev.00 Page 4 Filling machine VMF-L Teknoice S.r.l. Via Lazio, 37 20090 Buccinasco (MI) Italy Tel. 0039.02.4886761 Fax 0039.02.4882153 Web www.teknoice.com