TRANSPORTATION OF TWO VACCUM TOWERS, VENEZUELA . Project: Transport and assembly of two vaccum towers Location: Puerto La Cruz Refinery (Venezuela) Equipment: 48 axle lines of SPMT in a 4 file 24 configuration Weight: 286t ALE588AR ALE has successfully executed the transportation of the second vaccum tower (286t) from Guanta Port to gate 27 of Puerto La Cruz Refinery. The distance travelled was 3km. ALE performed the transportation after midnight in order to avoid traffic and congestion of the day time. For further information, please visit www.ale-heavylift.com and see the contact details of our office in your region. Para mayor información, ingrese a www.ale-heavylift.com donde encontrará los contactos de nuestra oficina en su región. 1/2 ALE557AR Local route within the refinery, from gate 27 to VDU area (3km). The transport set up that is used consisted of 48 axle lines of SPMT in a 4 file 24 configuration. The project consists of two vaccum towers, the first one has already been installed and the second one has already been transported, ready for its assembly by the end of January 2016. For further information, please visit www.ale-heavylift.com and see the contact details of our office in your region. Para mayor información, ingrese a www.ale-heavylift.com donde encontrará los contactos de nuestra oficina en su región. 2/2 ALE557AR