TRANSPORTATION OF TWO VACCUM TOWERS, VENEZUELA

Anuncio
TRANSPORTATION OF TWO VACCUM TOWERS,
VENEZUELA
.
Project:
Transport and assembly of two vaccum towers
Location:
Puerto La Cruz Refinery (Venezuela)
Equipment:
48 axle lines of SPMT in a 4 file 24 configuration
Weight:
286t
ALE588AR
ALE has successfully executed the transportation of the second vaccum tower (286t) from
Guanta Port to gate 27 of Puerto La Cruz Refinery. The distance travelled was 3km. ALE
performed the transportation after midnight in order to avoid traffic and congestion of the day
time.
For further information, please visit www.ale-heavylift.com and see the contact details of our office in your region.
Para mayor información, ingrese a www.ale-heavylift.com donde encontrará los contactos de nuestra oficina en su región.
1/2
ALE557AR
Local route within the refinery, from gate 27 to VDU area (3km).
The transport set up that is used consisted of 48 axle lines of SPMT in a 4 file 24 configuration.
The project consists of two vaccum towers, the first one has already been installed and the
second one has already been transported, ready for its assembly by the end of January 2016.
For further information, please visit www.ale-heavylift.com and see the contact details of our office in your region.
Para mayor información, ingrese a www.ale-heavylift.com donde encontrará los contactos de nuestra oficina en su región.
2/2
ALE557AR
Descargar