Mechanism of Subsidies Applied in Peru Miguel Revolo Manager of Distribution Regulation OSINERGMIN PERU AEI, Maputo Workshop – World Bank June 2009 1 South America Venezuela Colombia Brazil Ecuador Peru Bolivia Paraguay Chile Uruguay Argentina 2 Peru statistics 2008 Population With electrical service No Electrical Service Total No Service (%) Urban 18 634 183 1 882 738 20 516 921 9.2% Rural Total 1 958 130 20 592 313 4 582 148 6 464 886 6 540 278 27 057 199 70.1% 23.9% Source: INEI - Censos Nacionales 2007: XI de Población y VI de Vivienda 3 Realities • Rural costs of supply are more expensive than urban areas. • Existing rural tariffs generally do not cover the expansion of the electrical rural system. • The level of investment required per consumer in rural areas is between two to five times greater than that required in urban areas 4 Constraints • Rural customers can not pay full cost recovering tariffs (economic). • All low-income Peruvians must be treated equally (political). • A tariff design must be aligned with the consumer's willingness to pay (socioeconomic) • What are possible solutions? 5 Possible solutions • To promote universal access to the rural areas investment subsidies are necessary (Economic). • To promote the efficient award of investment subsidies, the State must provide subsidies to the utilities who request the lowest subsidy per connected customer (Economic). • Tariffs charged to new rural consumers should be capped at the maximum regulated urban tariff (Political). 6 Three Types of Subsidies • #1--Initial cost of capital subsidy (US $100 million per year) – Isolated mini-grids under 500 KW power capacity installed. – Distribution (rural grids outside of utility concession) – Sources of subsidy: Fiscal fund, international loans (US$ 50 millions), Rural Electrification Fund (REF) ( US$ 17 millions) and donors. • #2--Internal tariff subsidy (US $36 million per year) Subcomponent A: – To reduce the price of isolated generation. Source: REF (US$ 23 million per year) Subcomponent B: – To reduce de cost of the distribution added value (DAV) (the “distribution cost reduction” before to be applied to rural consumers) (US$ 13 million per year). Source of subsidy: The urban consumers. • #3--Consumption subsidy (US$ 31 million per year) – To obtain similar tariffs between interconnected mini-grids and urban areas – To obtain similar tariffs between isolated mini-grids and urban areas – Source of subsidy: The consumers whose consumption is higher than 100 kW.h per month. 7 #1--Initial capital cost subsidy • Implementation Criteria (isolated mini-grids) – Subsidies are provided for isolated mini-grids projects outside of a utility's concession with a power capacity under 500 KW. – The subsidy for isolated mini-grids expansion (mini hydro/thermal power plants) must be no higher than US$ 1000 per consumer. – The isolated mini-grids are transferred to the municipality. – The municipalities operate without concession – The law concedes the municipalities the rights to ser their own tariff and to determine the conditions of the service (number of hours of operations) – The service is provided between 6 to 13 hours per day and the consumers pay a fixed charge that varies between US$ 3 to US$ 10 per month. – Generally the municipality covers with its own budget the cost of fuel and maintenance. – There are 368 municipalities in Peru 8 Components of the Distribution Added Value Scenario A 100% Utility's Investment Distribution Added Value Primary feeder + Transformers + Secondary + Services + Meter aVNR + OyM DAV = Demand Scenario B 100% Government's Investment aVNR × 0,16 + OyM DAV = Demand 9 Rural Tariff for a Distribution Company (DISCO) Sector 5 New Replacement Value - NRV (thousand US$) NRV medium voltage NRV low voltage Service medium voltage Service low voltage Total Annual Investment Cost (thousand US$) Primary distribution Secondary distribution Service medium voltage Service low voltage Replacement Cost (thousand US$) Primary distribution Secondary distribution Service medium voltage Service low voltage Annual O&M (thousand US$) Primary distribution Secondary distribution Service medium voltage Service low voltage Peak Load (kW) Primary distribution Secondary distribution RES 100% DISCO RES 100% Goverment RES 20% DISCO 80% Goverment 2,210.5 3,504.2 ----5,714.7 795.8 1,261.5 78.0 577.5 2,712.8 795.8 1,261.5 78.0 577.5 2,712.8 795.8 1,261.5 78.0 577.5 2,712.8 274.4 435.0 ----- 98.8 156.6 9.7 71.7 --------- 19.8 31.3 1.9 14.3 --------- --------- 15.8 25.1 1.5 11.5 12.6 20.0 1.2 9.2 96.0 156.6 ----- 34.6 56.4 0.3 8.9 34.6 56.4 0.3 8.9 34.6 56.4 0.3 8.9 3,057.0 2,458.0 395.0 395.0 395.0 395.0 395.0 395.0 9.7 19.3 29.1 59.5 10.8 21.1 14.5 28.8 Distribution Added Value - DAV DAV medium voltage US$/kW-month DAV low voltage US$/kW-month 10 Final Isolated Rural Retail Tariffs (Subsidy #1) 60.0 52,71 32,49 36,54 50.0 ct. US$/kW.h 40.0 22.01 10.65 30.0 7.81 9.58 3.56 4.77 3.32 3.32 3.32 17.80 17.80 17.80 RES 100% DISCO RES 100% Goverment RES 20% DISCO 80% Goverment DAV - Secondary grid 22.01 7.81 10.65 DAV - Primary lines 9.58 3.56 4.77 Power Generation Cost 3.32 3.32 3.32 Energy Generation Cost 17.80 17.80 17.80 20.0 10.0 0.0 11 #2--Internal tariff subsidy 12 Isolated Generation Price Internal Subsidy 13 Subsidy to Isolated Generation Attended by Energy Power Utilities • Law N° 288832 ( Law for the Efficient Development of the power generation): created compensation mechanisms for isolated systems. • Objective: compensate the differential between the isolated generation prices with the bus bar price of the national interconnected system. • Resources: No more than 50% of the Rural Electric Fund created by Law N° 28749 (General Law of Rural Electrification) 14 Framework: Maximum Tariffs to Regulated Consumers REGULATED BY OSINERGMIN PRICES AS ARESULT OF THE BIDDINGS FOR ENERGY SUPPLY STABLISHED BY OSINERGMIN APPROVED BY MINISTRY OF NERGY AND MINES SPECIFIC AMOIUNT NET PRICE BUS BAR FULL BUS BAR LAW SUBSIDY BIDDING PRICES BUS BAR PRICE RGULATED BUS BAR TRANSMISSION TOLLS DISTRIBUTION ADDED VALUE ISOLATED SYSTEM MECAHNISM OF COMPENSATION DISTRIBUTION ADDED VALUE INTERCONECTED NATIONAL GRID 15 NATIONAL INTERCONECTED GRID VS ISOLATED SYSTEMS SUBESTACIÓN BASE DE MAYOR PRECIO DEL SEIN IS_ J IS_A PMTA > PSEIN Center EXP-A PMTG > PSEIN EXP-G ~ IS_ B PMTB > PSEIN South East IS_I EXP-B ~ PMTC > PSEIN South West LIMA North ~ IS_ G IS_ H PMTH > PSEIN EXP-H PMTF > PSEIN EXP-F 16 EXP-C Bar Prices Expanded to Primary Voltage Utility Adinelsa Chavimochic Edelnor Edelsa Egepsa Electro Oriente Electro Pangoa Electro Puno Electro Sur Este Electro Sur Medio Electro Ucayali Electrocentro Electronorte Emseusa Hidrandina Seal Sersa Tensión kV MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT PPM US$/kW‐mes 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 7.10 PEMP ctv. US$/kW.h 7.24 7.24 7.24 7.24 7.24 10.48 7.24 15.70 16.72 15.70 7.24 7.24 6.77 6.43 7.28 12.17 10.85 PEMF ctv. US$/kW.h 7.24 7.24 7.24 7.24 7.24 10.48 7.24 15.70 16.72 15.70 7.24 7.24 6.77 6.43 7.28 12.17 10.85 Average Price ctv. US$/kW.h 9.04 9.04 9.04 9.04 9.04 12.27 9.04 17.50 18.51 17.50 9.04 9.04 8.56 8.23 9.07 13.96 12.65 PPM: Peak load marginal power price PEMP: Peak load marginal energy price PEMP: Peak out load marginal energy price 17 Annual Compensation Utility Adinelsa Chavimochic Edelnor Edelsa Egepsa Electro Oriente Electro Pangoa Electro Sur Este Electro Sur Medio Electro Ucayali Electrocentro Electronorte Emseusa Hidrandina Seal Sersa Total Annual Compensation Thousand of US$ Dollars 33 2 29 4 6 22,438 12 214 1 18 179 176 0 110 253 295 23,768 Participation (%) 0.14% 0.01% 0.12% 0.02% 0.03% 94.40% 0.05% 0.90% 0.00% 0.07% 0.75% 0.74% 0.00% 0.46% 1.06% 1.24% 100.00% 18 Net Bus Bar Price Utility Adinelsa Chavimochic Edelnor Edelsa Egepsa Electro Oriente Electro Pangoa Electro Puno Electro Sur Este Electro Sur Medio Electro Ucayali Electrocentro Electronorte Emseusa Hidrandina Seal Sersa Tensión PPM PEMP PEMF Average Price kV US$/kW‐mes ctv. US$/kW.h ctv. US$/kW.h ctv. US$/kW.h MT 7.10 4.91 4.91 6.70 MT 7.10 4.91 4.91 6.70 MT 7.10 4.91 4.91 6.70 MT 7.10 4.91 4.91 6.70 MT 7.10 4.91 4.91 6.70 MT 7.10 5.28 5.28 7.07 MT 7.10 4.91 4.91 6.70 MT 7.10 5.08 5.08 6.87 MT 7.10 5.69 5.69 7.48 MT 7.10 5.08 5.08 6.87 MT 7.10 4.91 4.91 6.70 MT 7.10 4.91 4.91 6.70 MT 7.10 5.05 5.05 6.84 MT 7.10 5.15 5.15 6.94 MT 7.10 4.91 4.91 6.70 MT 7.10 5.01 5.01 6.80 MT 7.10 5.32 5.32 7.11 PPM: Peak load marginal power price PEMP: Peak load marginal energy price PEMP: Peak out load marginal energy price 19 Final Impact on Isolated Bar Price Utility Adinelsa Chavimochic Edelnor Edelsa Egepsa Electro Oriente Electro Pangoa Electro Puno Electro Sur Este Electro Sur Medio Electro Ucayali Electrocentro Electronorte Emseusa Hidrandina Seal Sersa Tensión kV MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT PPM US$/kW‐mes 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEMP ctv. US$/kW.h ‐32% ‐32% ‐32% ‐32% ‐32% ‐50% ‐32% ‐68% ‐66% ‐68% ‐32% ‐32% ‐25% ‐20% ‐33% ‐59% ‐51% PEMF ctv. US$/kW.h ‐32% ‐32% ‐32% ‐32% ‐32% ‐50% ‐32% ‐68% ‐66% ‐68% ‐32% ‐32% ‐25% ‐20% ‐33% ‐59% ‐51% Average Price ctv. US$/kW.h ‐26% ‐26% ‐26% ‐26% ‐26% ‐42% ‐26% ‐61% ‐60% ‐61% ‐26% ‐26% ‐20% ‐16% ‐26% ‐51% ‐44% PPM: Peak load marginal power price PEMP: Peak load marginal energy price PEMP: Peak out load marginal energy price 20 Distribution Added Value Internal Subsidy 21 Internal Subsidy DAV • Rules of Law N° 25844 ( Art. 147): The distribution added value will be set for each concession through the application of weighed factors. • Ministry Decree: Establish the methodology for the calculation of weighed factors. • Objective: compensate the differential price between rural and urban areas. • Application: OSINERGMIN set the DAV weighed factors every year. 22 Weighed factor of the DAV • The weighed factor is calculated for each utility. • The factor is calculated using the sales of energy separated for each level of voltage (medium and low voltage). 23 Weighed Factor of the DAV of Medium Voltage Company Coelvisac Edecañete Edelnor Electro Oriente Electro Pangoa Electro Puno Electro Sur Este Electro Sur Medio Electro Tocache Electro Ucayali Electrocentro Electronoroeste Electronorte Electrosur Emsemsa Emseusa Hidrandina Luz del Sur Seal Sersa 1 0.00% 0.00% 94.51% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% 2 0.00% 93.66% 5.24% 75.98% 100.00% 49.59% 47.81% 95.71% 0.00% 92.04% 53.38% 87.87% 71.14% 90.41% 0.00% 0.00% 82.79% 0.00% 82.13% 0.00% 3 5.66% 0.00% 0.23% 10.47% 0.00% 22.57% 17.48% 0.32% 99.60% 5.05% 19.05% 4.66% 21.32% 0.00% 100.00% 0.00% 7.70% 0.00% 8.15% 100.00% Sector 4 0.00% 6.34% 0.00% 2.94% 0.00% 2.29% 0.00% 0.02% 0.00% 2.91% 8.13% 5.94% 2.99% 0.00% 0.00% 100.00% 2.90% 0.00% 0.87% 0.00% 5 0.00% 0.00% 0.02% 10.57% 0.00% 24.90% 34.33% 3.62% 0.00% 0.00% 18.90% 1.51% 4.29% 9.59% 0.00% 0.00% 6.25% 0.00% 8.81% 0.00% Especial 94.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% SER 0.00% 0.00% 0.00% 0.04% 0.00% 0.65% 0.38% 0.33% 0.40% 0.00% 0.54% 0.02% 0.26% 0.00% 0.00% 0.00% 0.36% 0.00% 0.04% 0.00% 24 DAV Sersa Seal Luz del Sur Hidrandina Emseusa Emsemsa Electrosur Electronorte Electronoroeste Electrocentro Electro Ucayali Electro Tocache Electro Sur Electro Sur Este Electro Puno Electro Pangoa Electro Oriente Edelnor Edecañete Sector 5 Sector 4 Sector 3 Sector 2 Sector 1 DAV (US$/KW‐month) Weighed Factor of the DAV of Medium Voltage 12 10 8 6 4 2 0 Weighed VAd 25 Weighed Factor of the DAV of Low Voltage Company Coelvisac Edecañete Edelnor Electro Oriente Electro Pangoa Electro Puno Electro Sur Este Electro Sur Medio Electro Tocache Electro Ucayali Electrocentro Electronoroeste Electronorte Electrosur Emsemsa Emseusa Hidrandina Luz del Sur Seal Sersa 1 0.00% 0.00% 94.95% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% 2 0.00% 87.87% 4.68% 80.48% 100.00% 53.72% 53.53% 96.13% 0.00% 91.71% 55.60% 83.31% 75.33% 94.93% 0.00% 0.00% 83.59% 0.00% 85.19% 0.00% 3 47.38% 0.00% 0.34% 6.14% 0.00% 18.84% 19.58% 0.82% 99.56% 6.94% 16.85% 5.61% 15.45% 0.00% 100.00% 0.00% 9.78% 0.00% 8.30% 100.00% Sector 4 0.00% 12.13% 0.00% 2.28% 0.00% 1.72% 0.00% 0.06% 0.00% 1.35% 8.88% 8.67% 3.93% 0.00% 0.00% 100.00% 2.51% 0.00% 1.17% 0.00% 5 0.00% 0.00% 0.03% 11.03% 0.00% 24.74% 26.37% 2.14% 0.00% 0.00% 18.01% 2.36% 4.89% 5.07% 0.00% 0.00% 3.62% 0.00% 5.27% 0.00% Especial 52.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% SER 0.00% 0.00% 0.00% 0.07% 0.00% 0.98% 0.52% 0.85% 0.44% 0.00% 0.66% 0.05% 0.40% 0.00% 0.00% 0.00% 0.50% 0.00% 0.07% 0.00% 26 DAV Weighed VAd Sersa Seal Luz del Sur Hidrandina Emseusa Emsemsa Electrosur Electronorte Electronoroeste Electrocentro Electro Ucayali Electro Tocache Electro Sur Electro Sur Este Electro Puno Electro Pangoa Electro Oriente Edelnor Edecañete Sector 5 Sector 4 Sector 3 Sector 2 Sector 1 DAV (US$/kW‐month) Weighed Factor of the DAV of Low Voltage 25 20 15 10 5 0 27 Variation of de Distribution Added Value 10.0% 5.0% 4.3% 0.0% -2.9% -5.0% -10.0% -13.2% -15.0% -20.0% -22.7% -25.0% Area 2 Area 3 Area 4 Area 5 28 #3--Consumption subsidy 29 Electricity Social Compensation Fund (FOSE) Law 28307 Consumers Inerconected System Isolated System Typical sector Monthly tariffs reduction Consumption <= 30 KW.h Monthly tariffs reduction Consumption >= 30 KW.h and <= 100 Kw.h Urban Rural Urban Rural 25% 50% 50% 62.50% 7,5 kW.h 15 kW.h 15 kW.h 18,75 kW.h 30 Electricity Social Compensation Fund (FOSE) Range 0-30 kW.h 31-100 kW.h > 100 kW.h (1) Total Interconected 1 150 155 1 188 228 2 031 648 4 370 031 Isolated 141 527 97 166 72 705 311 398 Total 1 291 682 1 285 394 2 104 353 4 681 429 Percentage 55% 45% 100% (1) Consumers with consumption > 100 kW.h are charged with 3% over their energy bill consumption. FOSE collection : Million US$ 30.7 per year 31 Final Isolated mini-grid Retail Tariff Subsidies (#1, #2 y #3) 60.0 52.71 22.07 8.28 50.0 ct. US$/kW.h 40.0 22.01 30.0 9.58 20.0 10.0 3.32 9.01 3.98 17.80 3.32 3.38 Tarifa Tarifa Subsidido Interno 1.49 1.25 2.16 Tarifa Subsidio Interno + FOSE 22.01 9.01 3.38 DAV - Primary lines 9.58 3.98 1.49 Power Generation Cost 3.32 3.32 1.25 Energy Generation Cost 17.80 5.76 2.16 5.76 0.0 DAV - Secondary grid 32 Conclusions • • • • • It is possible to implement different types of subsidies depending on the necessity of its use in order to cover social, economical and political issues. The model of subsidy applied in Peru is based on recognizing the economic cost of service. The reductions in the retail tariffs is financed through monthly transfers to the utilities. The subsidies applied in Peru are financed mainly by urban consumers served by the National Interconnected Grid with a consumption higher than 100 KWh. Equalize the rural and urban tariffs stabilize the social environment. 33 Thank you ! 34