Geothermal Power Plants in Central America The map shows the geothermal power plants currently in operation in Central America. Not included are projects in exploration or planning stage. 90°0'0"W 85°0'0"W Balancan Tenosique Mexico Belize Belmopan El Cayo Orzunil Guatemala San Luis Field: Amatitlán Mazatenango COD: 2007 Units: 1 in operation Wells: 4 prod. Depth: 1,000 - 2,000 m Temperature: 285 °C Installed Capacity: 24 MWel [1] Running Capacity: 20 MWel [1] Produced Energy: 158 GWh/yr Owner: Ormat Supplier: Ormat, Ortitlan Salama Zacapa Santa Barbara El Progreso Chiquimula Jalapa Gracias Brus Laguna Yoro Juticalpa Honduras San Jose Coc Car os P i bbe late an P Masaya late Field: Momotombo COD: 1983 Units: 3 in operation Wells: 12 prod., 5 inj. Depth: 200 - 2,800 m Nicaragua Temperature: 182 °C [1], [2] Installed Capacity: 96 MWel Running Capacity: 24 MWel [2] Produced Energy: 275 GWh/yr Owner: Ormat Supplier: Alstrom, Polaris (now Ram Power) Puerto Cabezas Nicaragua San Andres Las Pailas Juigalpa La Cruz San Carlos San Juan del Norte Liberia Canas 100 Direct Use Topology Total Installed Total Produced Capacity Energy Total Units [MW el] [GWh/yr] COSTA RICA 1 21 5.8 Greenhouse 207 1,131 8 EL SALVADOR 2 40 ‐ Agricultural drying, fish farming, greenhouse 204 1,422 7 52 289 8 GUATEMALA 2.31 56.42 15.7 Agricultural drying, bathing and swimming, industrial process heat HONDURAS 1.9 45 12.5 Bathing and swimming ‐ ‐ ‐ NICARAGUA ‐ ‐ ‐ ‐ 142 347 6 BOCHUM UNIVERSITY OF APPLIED SCIENCES 90°0'0"W Quesada Miravalles Puerto Limon Heredia Field: Miravalles COD: 1994 Alajuela San Jose Units: 6 in operation Cartago Costa Rica Sixaola Wells: 33 prod., 14 inj. Depth: 1,000 - 2,000 m AlmiranteTemperature: 240 °C Installed Capacity: 165 MWel [1] Bocas delCapacity: Toro 136 MWel [1], [3] Running Ciudad Cortes Produced Energy: 1,131 GWh/yr 10°0'0"N 10°0'0"N Country Total Thermal Direct Use Direct Use Installed Capacity [TJ/yr] [GWh/year] [MW th] Field: Rincón de la Vieja COD: 2011 Units: 2 in operation Depth: 1,400 - 1,900 m Temperature: 260 °C Costa Rica Installed Capacity: 42 MWel [2] [2] Running Capacity: 35 MWel Owner: Banco Centoamericano de Integracion Economia (BCIE) Supplier: Ormat Bluefields Granada Rivas Pacific Ocean Nicaragua Momotombo La Esperanza La Paz Tegucigalpa Santa Ana Chalatenango Yuscaran Sonsonate San Vicente Ocotal Nacaome San El Salvador SalvadorUsulutan La Union Zacatecoluca Somoto Esteli Jinotega Choluteca Kilometers INTERNATIONAL GEOTHERMAL CENTER Field: San Jacinto-Tizate COD: 2007 Units: 3 in operation Wells: 3 prod., 2 inj. Depth: 2,200 m Temperature: 260 - 290 °C Installed Capacity: 46 MWel [1] Running Capacity: 10 MWel [3] Produced Energy: 72 GWh/yr Owner: Polaris (now Ram Power) Supplier: Alstrom, Polaris Chinandega Matagalpa Boaco Leon Field: Berlín COD: 1992 Units: 4 in operation Wells: 11 prod., 18 inj. Depth: 2,000 - 2,500 m Temperature: 300 °C El Salvador Installed Capacity: 109 MWel [1] Running Capacity: 104 MWel [3] Produced Energy: 753 GWh/yr Owner: LaGeo, Enel Green Power Supplier: Fuji, General Electric, Nuovo Pignone, Enex INTERNATIONAL GEOTHERMAL ASSOCIATION Trujillo San Jacinto-Tizate Escuintla Cuilapa Jutiapa Berlín 50 a e b b ari Puerto Lempira Field: Ahuachapán COD: 1975 Units: 3 in operation Wells: 21 prod., 9 inj. Depth: 600 - 1,500 m Temperature: 230 - 250 °C Installed Capacity: 95 MWel [1] Running Capacity: 84 MWel [1] Produced Energy: 669 GWh/yr Owner: LaGeo, Enel Green Power Supplier: Mitsubishi, Fuji 0 C Roatan La Ceiba Ahuachapán El Salvador e Puerto Barrios San Pedro Sula Coban Huehuetenango Punta Gorda Nort h Livingston Guatemala Tapachula San Marcos Solola Amatitlán Retalhuleu 15°0'0"N Guatemala Field: Zunil COD: 1998 Units: 7 in operation Wells: 5 prod., 2 inj. Depth: 1,000 m Temperature: 182 °C Installed Capacity: 28 MWel [1] Running Capacity: 16 MWel [1] Produced Energy: 131 GWh/yr Escuintla Owner: Ormat Supplier: Ormat, Orzunil ica r e Am t a l nP e t a l nP 15°0'0"N La Libertad San Cristobal de Las Casas Dangriga Flores ¯ Caribbean Sea Belize City Owner: Instituto Costarricense de Electricidad Supplier: Toshiba, Ormat, Mitsubishi, Ansaldo/Tosi Golfito Puerto Armuelles Costa Rica David References Maps: NASA/JPL/NIMA - Photojournal (http://photojournal.jpl.nasa.gov); Natural Earth (http://www.naturalearthdata.com/); ESRI ArcGIS Physical and Ocean (http://www.arcgis.com/) Pictures: Ram Power, Corp. (http://www.ram-power.com/); LaGeo (http://www.lageo.com.sv/index.php); ORMAT Technologies, Inc. (http://www.ormat.com/) Data: [ 1 ]: IGA Web Geothermal Database (http://www.geothermal-energy.org/); [2] : E-Mail correspondence Ms. Yogev, Marketing and Communication Manager, Ormat Technologies Inc., 24.11/08.12.2011; [3] : Montalvo, F.E. et al.: "Estado Actual Del Desarrollo De Los Recursos Geothermicos En Centroamerica", fifth edition, Istituto Italo-Latino Americano, San Salvador, Pisa, San Jose, 2009/2010; IGA Geothermal Conference Database - Country Updates and Proceedings World Geothermal Congress 2005, 2010 (http://www.geothermal-energy.org/); Pullinger, C.: "Geothermal Development in Central America: Opportunities and Difficulties", United Nations University - Geothermal Training Programme, LaGeo, El Salvador, 2009 (http://www.os.is/gogn/unu-gtp-sc/UNU-GTP-SC-09-11.pdf); 85°0'0"W Moya, P.; Perez, L.D.: "Las Pailas Geothermal Project: A 35 MW Plant", World Geothermal Congress 2010, Indonesia, 2010 (http://b-dig.iie.org.mx/BibDig/P10-0464/pdf/0632.pdf); Think GeoEnergy - Global Geothermal Power Plant Map (http://thinkgeoenergy.com/archives/7892); Enipedia (http://enipedia.tudelft.nl/wiki/Enipedia) Abbreviations December 2011 COD: Commission date; prod.: production; inj.: injection