Subido por Percy Infante Chavez

1-s2.0-S2212670814000633-main

Anuncio
Available online at www.sciencedirect.com
ScienceDirect
APCBEE Procedia 9 (2014) 354 – 359
ICCEN 2013: December 13-14, Stockholm, Sweden
Fundamental Vibration Period of SW Buildings
Farid Chalaha, , Lila Chalah-Rezguia, Kamel Faleka, Salah Eddine Djellaba and
Abderrahim Balib
b
a
Usthb, Faculty of Civil Engineering, Algiers, Algeria.
URIE, Ecole Nationale Polytechnique, Algiers, Algeria.
Abstract
This paper focuses on the fundamental period vibration evaluation of civil engineering constructions achieved in
reinforced concrete which use the shear walls bracing system. As known, in the vibration modes assessment phase of a
given structure, much of the seismic energy is absorbed by the fundamental mode. For this reason, many authors have
provided empirical formulas using many approaches. Based on an elastic behavior and the Dunkerley formula, a
simplified expression is proposed, which takes into account the geometrical and the mechanical characteristics of the
structure. Following this development, the period value is a function of the number of floors of the considered structure. It
is in good agreement with that obtained by the FEM that uses numerical methods requiring a sophisticated and more
complex process. It may constitute a practical tool for practicing engineers in the preliminary design phase of any SW
building.
©
2013Farid
Published
Elsevier
B.V. Selection
and/or peer review under responsibility of Asia-Pacific
© 2014
Chalah.by
Published
by Elsevier
B.V.
Chemical,
Environmental
Engineering
Selection andBiological
peer review&
under
responsibility of
Asia-Pacific Society
Chemical, Biological & Environmental Engineering Society
Keywords: Fundamental period, SW buildings, earthquake code, mode vibration
1.
Introduction
The objective of this work is to propose a formula for the determination of the fundamental period of shear
wall buildings. In this field, experimental works [1] have been conducted and often followed by statistical
treatments of results. These are generally obtained from ambient vibrations measurements or from occurred
Corresponding author. Tel.: +213-21-24-72-24; Fax: +213-21-24-79-14.
E-mail address: f_chalah@yahoo.fr.
2212-6708 © 2014 Farid Chalah. Published by Elsevier B.V.
Selection and peer review under responsibility of Asia-Pacific Chemical, Biological & Environmental Engineering Society
doi:10.1016/j.apcbee.2014.01.062
355
Farid Chalah et al. / APCBEE Procedia 9 (2014) 354 – 359
earthquakes (recorded data). They are used to suggest simplified formulas. Also, theoretical developments
have been already done for this purpose by solving differential equations with assumptions on the vibration
modes.
Some methods consisted on modifying existing formulas in the current codes which allow the evaluation of
the lateral shear force applied at the base of a projected structure.
In its preliminary design phase, the building structure is not yet completely and entirely defined. Thus, only
some parameters are known, namely; steel or concrete material and bracing system (shear walls or other…).
Using seismic records, many research investigations led to proposal formulas which are more and more
refined that take into account more effectively the bracing system, construction dimensions and mechanical
characteristics of the used material. Thus, a number of empirical formulas [2-5] were developed for a better
estimation of the fundamental vibration period of SW buildings and this was at the base of the earthquake
codes evolution.
Improved formulas are continuously suggested. They generally include the construction dimensions such
as the area, the height, the width and the length easily measurable and intuitively deductible. Many of them,
are based on the characteristics of the building which are ignored and replaced by none really representative
external dimensions in terms of in plane area’s length in the direction of the movement and the total height of
the studied structure.
The finding of this research work is to propose a simplified formula for assessing the fundamental
vibration period of SW buildings. It allows the evaluation of the seismic acting shear force at the base of the
studied structure.
2.
Modal Analysis of a Structure
For carrying out the free vibration analysis of an undamped multiple degrees of freedom system, the
homogeneous system of differential equations given in 1., is considered.
>M @^x` >K @^x` ^0`
(1)
where:
[M]
: mass matrix
[K]
: stiffness matrix
{x}, ^x` : displacement and acceleration vectors
with the assumption on the displacement:
^x` ^X `˜ sin(Zt I )
(2)
Substituting equation 2 in equation 1, without considering the nontrivial solution implies that its
determinant must satisfy, the following condition:
| [K]-ω2[M] |=0
(3)
Many solving numerical methods exist depending on the dimension of the two matrices [6]. However, a
formulation of a simple and practical expression of the fundamental period is needed. Its value for a single
degree of freedom is given by the relation:
T1 =2S(m/k)1/2
with;
k
m
: stiffness
: floor mass.
(4)
356
Farid Chalah et al. / APCBEE Procedia 9 (2014) 354 – 359
3.
Evaluation of the Fundamental Period in Compliance with Existing Codes
In the following presentations, the formulas to evaluate the fundamental periods in function of the bracing
systems are given for three earthquake codes; RPA99 version 2003[7], UBC-97[8] and Eurocodes[9].
3.1. Evaluation of the vibration period
In order to evaluate the base shear force acting on a civil engineering structure, different formulas for
determining the fundamental vibration period which consist on an intermediate parameter are given by
empirical methods (generally based on the Rayleigh quotient method) as expressed below:
T1=2.S.[1/g(6mi. xi2)/ (6fi.xi)] 1/2
(5)
where:
: mass of the ith story.
mi
: lateral displacement of the ith story under the application of a vector force.
xi
3.2. Proposed formula for the fundamental vibration as given by actual earthquake codes
In the other hand, a version of the Rayleigh formula can be expressed as indicated in earthquake codes:
T1=2.S.[1/g(6Wi. Gi2)/ (6fi.Gi)]1/2
(6)
where:
fi
: ith component of a horizontal vector force system distributed along the structure height.
δi
: lateral displacements of the ith floor.
3.3. Assessment of the fundamental period in compliance with earthquake codes:
The T fundamental period of a given structure is assessed by applying formulas largely admitted and used.
3.3.1. Algerian seismic standard
Depending on the bracing system, the empirical formula to be used is:
T
CT hN3/4
(7)
where :
hN : Total height of the structure in meters.
CT : coefficient which depends on the bracing system and the in filling nature.
The CT value to be considered for a bracing system partially or completely made by concrete SW is 0.05.
Adding to this, another expression is given, under the form:
T
0.09hN / D
(8)
where:
D : building dimension, measured at its base, in the vibration direction.
Nota: The appropriate value to be retained is the smaller of the values given by the two formulas and this
concerns each direction of vibration.
3.3.2. Expression of the period by UBC-97
The 1997 Uniform Building Code, expresses the period T1 by the relationship :
357
Farid Chalah et al. / APCBEE Procedia 9 (2014) 354 – 359
T= CT.hn3/4
(9)
where:
hn : is the building height in ft.
The following Table 1, shows the value CT to be considered:
Table 1. CT value to be considered according to the bracing system, as given in the UBC97.
Lateral force resisting system
Steel moment frames
Steel moment frames
eccentrically braced steel frames
All others buildings
CT
0.035
0.030
0.020
3.3.3. Evaluation of the fundamental period by the Eurocodes
For buildings up to 40 m of heights, the value of T1 (in s) may be approximated by the following
expression:
T1=Ct.H3/4
(10)
where:
:is 0.085 for moment resistant space steel frames, 0.075 for moment resistant space concrete frames
Ct
and for eccentrically braced steel frames and 0.050 for all other structures.
H
: height of the building, in m, from the foundation or from the top of a rigid basement.
Alternatively, the estimation of T1 (in s) may be made by using the following expression:
T1=2 d1/2
where
d :lateral elastic displacement of the top of the building, in m, due to the gravity loads applied horizontally.
4.
Proposed Formula for the Fundamental Vibration Period Assessment for SW buildings
The response of a given structure to a seism depends only on its eigenvalues and eigenvectors. These
parameters defined as vibration modes (periods, frequencies or pulsations and vectors) are well recognized
when the structure is in free oscillations. After having highlighted these parameters by a stiffness formulation
in statics and concentrating the mass of each level at its floor, a process is then usually used. At this step, an
eigenvalue problem is formulated were various methods of resolution exist, from handle to numerical ones.
Initially developed around the analysis field of rotating shafts by Dunkerley[10] and used in [11,12], its
extension was widely used to the analysis of many vibrating systems. Also, this use concerned the
determination of the first eigenvalue of various dynamic system representing constructions differently braced.
The equation 11., expresses the circular frequency:
1/Z1D2=m1. G11+m2. G22 +m3. G33 +…+ mk. Gkk +…+ mn. Gnn
(11)
where :
: Assessed fundamental vibration period by the Dunkerley-Southwell method
Z1D
: kth floor mass
mk
: lateral displacement of the kth floor.
Gkk
The expression of the Gkk displacement at a level k is given by the relationship 12.:
Gkk=1/3.hk3/(E.I)
where:
(12)
358
Farid Chalah et al. / APCBEE Procedia 9 (2014) 354 – 359
E : Young modulus
I : level inertia in m4
hk : kth floor position in meters
Assuming a constant level height, the hk value is given by the following relationship:
hk=k.h
where:
h : floor height
The previous equation is rewritten under the form of equation 13:
1/Z12=m1.131/3. h3/(E.I)+m2. 23.1/3. h3/(E.I)+ …+ mk. k3. 1/3.h3/(E.I)+…+mn. n3. 1/3.h3/(E.I)
(13)
By using a suplementary assumption of a constant mass for all the levels of m value, a new expression is
obtained, see equation 14 :
1/Z12= [13+23+33+…+k3+…+n3]. 1/3. m. h3/(E.I)
(14)
Then, a final expression for Z12 results as given in equation 15:
Z12= 12.[(E.I)/( m. h3)]/(n2.(n+1)2)
(15)
which leads to the period expression of the equation 16:
T1= 1.814 n(n+1)[ m h3/(EI)] 1/2
5.
(16)
Results
The Table 2 below summarizes the results on the period values obtained by the proposed formula in
equation 16 and those issued from the Jacobi method with an error calculus limited to 1.50% largely accepted.
Table 2. Some values of the T10 fundamental period of SW building as a function of the floors number.
N
2
3
4
5
6
Reference value
10,762
21,482
35,778
53,648
75,092
Assessed value
10,883
21,766
36,276
54,414
76,179
Error
0,0112
0,0132
0,0139
0,0143
0,0145
N
7
8
10
13
20
Reference value
100,11
128,702
196,609
325,274
750,584
Assessed value
101,573
130,593
199,518
330,111
761,795
Error
0,0146
0,0147
0,0148
0,0149
0,0149
with:
T1= T10 m h3/(EI)]1/2
A simple correction is proposed to improve the above formula, as written in 17:
T1= 1.8 n(n+1)[ m h3/(EI)] 1/2
6.
(17)
Conclusion
Various formulas have been proposed to determine empirically or theoretically the fundamental vibration
period of shear wall buildings. These are obtained by mathematical formulations and experimental
measurements of ambient vibrations with a post processing statistical treatment. For this, only the geometrical
characteristics of the buildings are taken into account with additional coefficients of correction. Formulas
based only on the dimensions, will give the same period value, whatever, the SW density repartition.
In this present work, starting from the Dunkerley formula, using hypothesis on constant height and mass of
the floor, a realistic formula is found. It allows the period assessment by a direct and simplified relationship
expressed in terms of mechanical and geometrical characteristics and the total floors number of the SW
Farid Chalah et al. / APCBEE Procedia 9 (2014) 354 – 359
building.
References
[1] Li-Hyung Lee, Kug-Kwan Chang and Young-Soo Chun, Experimental formula for the fundamental period of RC buildings with
shear-wall dominant systems, The structural design of tall buildings, Struct. Design Tall Build. 9, 295–307 (2000).
[2] Murat Pala, Naci Caglar, Zehra Sule Garip, Cihan Bayram and Hakan Ozturk, A New Formulation For The Fundamental Period
Of Reinforced Concrete Planar Shear Walls, International Balkans Conference on Challenges of Civil Engineering, BCCCE, 19-21 May
2011, EPOKA University, Tirana, ALBANIA.
[3] Y.-Soo Chun, Ji-Soo Yang, Kug-Kwan Chang and Li-Hyung Lee, Approximate estimations of natural periods for apartment
buildings with shear-wall dominant systems, 12WCEE2000.
[4] Can Balkaya1 and Erol Kalkan, Estimation of fundamental periods of shear-wall dominant building structures, Earthquake
Engng Struct. Dyn. 2003; 32:985–998 (DOI: 10.1002/eqe.258).
[5] Goel, R. K. and Chopra, A. K., 1998, Period formulas for Concrete Shear Wall Buildings, Journal of Structural Engineering,
ASCE, 124(4), 426-433.
[6] Lucia Dobrescu & Alexandru Dobrescu. « Dynamique des structures et sismologie de l’ingénieur », Tome I, OPU, Alger, 1983.
[7] Algerian parseismic rules, RPA99 V.2003, DTR B C 2 48, Centre de Génie Parasismique Algérien., Edition 2003.
[8] The 1997 Uniform Building Code (UBC).
[9] Eurocode 8. Common unified rules for structures in seismic zones.
[10] S. Dunkerley, On the whirling and vibration of shafts. Philosophical transactions of the royal society, 1895.
[11] B. Atzori, Journal of sound and vibration (1974), Dunkerley’s formula for finding the lowest frequency of vibration of elastic
systems. 36(4), 563-564.
[12] M. Endo, and O. Taniguchi. An extension of the southwell-dunkerley methods for synthesizing frequencies. Journal of sound
and vibration (1976), 49(4), 501-516.
359