SIEMENS 8DJH
Ring Main Operator Guide
Circuit Breaker Panel
L
(Type 2)
WARNING
Check that the Ready For Service (gas) Gauge indicates GREEN before operation
DO NOT OPERATE switchgear if the pointer is in the RED region
A
Feeder Earthed u
OPEN
Feeder Isolated u
CLOSE
2756
1
Slide the Isolator/Earth Switch Control Gate down to
open the Earth Shutter.
B
2
Insert the Operating Lever and rotate anti- clockwise
to open the Earth Switch.
Feeder Isolated u
OPEN
3
Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
Feeder Connected u
CLOSE
2756
1
Slide the right-hand Control Gate up to open the
Isolator Shutter.
2
Insert the Operating Lever and rotate clockwise
to close the Isolator Switch.
OPEN
a
3
For panels where the Circuit Breaker Spring Charge
mechanism is motorised, the spring is automatically
recharged immediately after the Circuit Breaker is
opened. In this case, steps 4 and 5 can be omitted.
6
Remove the Operating Lever. Press the CLOSE
button VERY HARD.
CLOSE
2756
b
4
1
(a) Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
(b) Slide the left-hand Control Gate up to open the
Circuit Breaker Spring Charge Shutter.
5
Insert the Operating Lever and rotate clockwise to
charge the Circuit Breaker Spring. It will click and hold
when rotated enough (70°).
Note: The aperture is sprung to eject the handle automatically.
It must be pushed in firmly and held to rotate.
These instructions detail mechanical operation of standard designs only
SIEMENS 8DJH
C
Ring Main Operator Guide
Feeder Connected u
Circuit Breaker L Panel (Type 2)
Feeder Isolated u
OPEN
CLOSE
2756
1
2
Press the OPEN button VERY HARD.
D
Slide the right-hand Control Gate up to open the
Isolator Shutter.
Feeder Isolated u
OPEN
3
Insert the Operating Lever and rotate anti-clockwise to
open the Isolator Switch.
Feeder Earthed u
CLOSE
2756
1
Slide the Isolator/Earth Switch Control Gate down to
open the Earth Shutter.
Circuit Breaker
Spring Charge
indicator
2
Insert the Operating Lever and rotate clockwise to
close the Earth Switch.
Circuit Breaker Spring
Charge Shutter
(clockwise to charge spring)
3
Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
Circuit Breaker CLOSE
push button
Isolator Status indicator (shown open)
OPEN
CLOSE
Circuit Breaker OPEN
push button
Isolator Switch Shutter
2756
Isolator/Earth Switch Control Gate
Circuit Breaker status
indication (shown open)
Circuit Breaker Spring Charge control gate
Earth Switch Shutter
Earth Switch status indication (shown open)
SWITCHGEAR Division