Vector® (iX and Q25 models) Mechanical maintenance sheets Edition 3 April 2015 543160 CA lectra.com 1/214 Vector® (iX and Q25 models) Mechanical maintenance sheets PREFACE Copyright Translation of the original document. ©2015 Lectra. Any copy, reproduction or complete or partial translation of the information contained in this document, without the written consent and agreement of Lectra, is prohibited by copyright law. Translation of the original document. Guarantees Lectra reserves the right to modify the information relating to its products, without prior notice, with the aim of improving their reliability and operation. Publication does not imply that the material included is free of all industrial property rights and does not grant any license over these rights. Moreover, Lectra takes no responsibility regarding the consequences of its use for whatever purpose. The dimensions, weights, performance measurements and other data mentioned in this documentation are approximate and have no contractual value. Registered trademarks Vector® is a registered trademark of Lectra SA, France. Loctite, Scelroulement, Blocpresse are registered trademarks of Loctite Corporation, USA. Klüberpaste is a registered trademark of Klüber Lubrification München KG. Update monitoring Edition Purpose of the update Sheet N° November 2012 Document creation January 2015 Modification and addition of sheets April 2015 Addition of sheet M3, M7, M21, M53, M55, M63. E1 Purpose of the document This document contains detailed procedures and information for the mechanical maintenance of the Vector® (iX and Q25 models). This document is intended for Lectra technical personnel. Key to icons used in this document Note Advice or suggestion April 2015 - 543160 CA Personal danger Risk of machine breakage lectra.com 2/214 Vector® (iX and Q25 models) Mechanical maintenance sheets CONTENTS Safety instructions and general indications................................................................................................. 1 1. Definition of the standard initial state ................................................................................................... 1 2. Safety data sheets ............................................................................................................................... 1 3. Tests and calibration............................................................................................................................ 1 Specifications of adhesive products............................................................................................................. 2 4. Presentation of products used ............................................................................................................. 2 5. Removal procedure ............................................................................................................................. 2 Specifications of greasing products ............................................................................................................. 3 Greasing the blade raising/lowering assembly guide rail and slider Greasing the Y trolley ball bearings and the rear bearing Greasing the X guide rails and sliders Greasing the vacuum turbine Greasing/replacing the blade holder and crank rod OPM Replacing the gear motor assembly and the wheels Replacing the gear motor assembly (OPM) on the new vacuum box CODA Replacing the CODA Cutter maintenance Replacing the CODA encoder Vacuum Inspecting and servicing the vacuum box Replacing the turbine only Replacing the motor/turbine assembly Replacing and adjusting the turbine belts Replacing the turbine drive motor Replacing the turbine box ventilation motor Conveyor Removing the rear covers Removing the side covers Adjusting the height of the lateral covers Removing the side profiles Cleaning the roller ramps Replacing the slats and blocks Replacing the conveyor motor Replacing the conveyor encoder belt X drive Replacing the X drive belts Replacing X axis belt, gearbox or motor April 2015 - 543160 CA lectra.com 3/214 Vector® (iX and Q25 models) Mechanical maintenance sheets Replacing the X guide rails and sliders Beam Removing the beam covers Beam squaring procedure Replacing and adjusting the Y axis belt Replacing the Y return pulley Replacing the Y drive motor Replacing the Y motor tensioner or transmission belt Removing the Y drive shaft and pulley Replacing the Y guide rails Replacing the cutting head ball bearings Cutting head Removing the head cover Removing the cutting head Vibration assembly Replacing the vibration motor Replacing the vibration unit raising/lowering jack Replacing the blade raising/lowering assembly guide rail and slider L Blade rotation assembly Removing the presser foot, replacing the diabolo/fork and the bearing Replacing the blade rotation motor with fittings Replacing the rotation motor satellite Replacing the presser foot raising/lowering jack Removing the presser foot revolving support Replacing the bearing or shank of the presser foot support Replacing the wear parts of the C-Kit removable module or the standard removable module Replacing the wear parts of the presser foot lower guide Replacing the intermediate blade guide Sharpening Operating principle of the sharpening system Adjusting the sharpening symmetry Checking the sharpening quality Replacing the sharpener jack Replacing the sharpening arms Replacing the sharpening motor or pulley Adjusting the blade Replacing the conical stops Adjusting the blade penetration Adjusting the blade zero Pneumatic drills Removing the hot needle drill Removing the drill drive belt and the presser foot shafts Removing the drill raising/lowering jack Adjusting the drilling depth Punch maintenance and sharpening April 2015 - 543160 CA lectra.com 4/214 Vector® (iX and Q25 models) Mechanical maintenance sheets Cameras, detectors Replacing the spot V2 camera assembly for Drill1 Replacing the spot V2 camera assembly for Drill2 Replacing the spot V2 camera assembly for DHEAT Replacing the blade breakage detector Adjusting the blade breakage detection sensor Adjusting the spread height sensor Adjustment of zero positioning camera April 2015 - 543160 CA lectra.com 5/214 Vector® (iX and Q25 models) Mechanical maintenance sheets SAFETY INSTRUCTIONS AND GENERAL INDICATIONS 1. DEFINITION OF THE STANDARD INITIAL STATE All the dismantling operations described must be carried out, unless otherwise specified, with the cutter switched off: electrical and pneumatic lines switched off and isolated at the circuit breakers. The machine must be isolated by two padlocks immobilizing the electrical switches in the “0” position for the isolating switch on the control cabinet and the “Off” position for the power circuit breaker on the control cabinet. (The padlocks are not supplied by Lectra.) “Control cabinet” line isolating switch. “Vacuum” line power circuit breaker. The tools, blade and drills, are removed (use appropriate protective gloves). Before starting any maintenance, briefly clean the head. Some of the specific tools necessary for the servicing and maintenance of the Vector, which are referred to in this document, are delivered with the cutter, and the remainder can be ordered using the Lectra item code. 2. SAFETY DATA SHEETS You can get information about the safety data sheets of greasing and gluing products stated in this document by contacting your Lectra call-center. 3. TESTS AND CALIBRATION Must be performed following a maintenance operation on the machine 1. Beam squaring 2. Blade Zero adjustment (essential after squaring) 3. Spot Calibration 4. Drill Calibration (drill) 5. Pen Calibration 6. X and Y Calibration 7. Blade Calibration 8. Clockwise and trigonometric circles test April 2015 - 543160 CA lectra.com 6/214 Vector® (iX and Q25 models) Mechanical maintenance sheets SPECIFICATIONS OF ADHESIVE PRODUCTS 4. PRESENTATION OF PRODUCTS USED Description 5. Area of use Item code Weak screwlock LOCTITE 222 M 2.5 screws and blade raising/lowering limit stops. 116062 Normal screwlock LOCTITE 243 M3 to M10 screws. 111683 Bearing glue LOCTITE SCELROULEMENT 603 Immobilizing a bearing ring (to prevent surface corrosion and to prevent rotation of the ring in the case of bearings that spin very quickly). 107537 Fitting glue LOCTITE THREAD SEALANT 577 Gluing of pneumatic connectors. 115593 Fitting glue LOCTITE BLOCPRESSE 638 Gluing of shafts. 116067 Degreaser 3M cleaning pouch Degreasing any part before gluing. 124924 REMOVAL PROCEDURE Elements assembled using glue (vibration bearings, presser foot and drill needle bushings) should only be dismantled after heating with a hot air gun. - A temperature of 150-160°C must be reached to destroy the glue joint. - The heating time will depend on the size of the parts to be dismantled (10 to 20 minutes). April 2015 - 543160 CA lectra.com 7/214 Vector® (iX and Q25 models) Mechanical maintenance sheets SPECIFICATIONS OF GREASING PRODUCTS Greasing products used: Description Area of use Code KLÜBER ISOFLEX NBU 15-G1 Grease. - Presser foot roller bearings - Vacuum turbine KLÜBER MICROLUBE GBU-Y 131: G10 grease pump - Vibration box guide rails and sliders - Recirculation ball bearings 130255 124528 KLÜBER ISOFLEX TOPAS NB 152: G11 grease pump - Crank rod and blade holder piston box greaser 124529 - Blade rotation motor gear and satellite 131837 G17 grease syringe Greasing locations: G10: Vibration box guide rails and sliders. G11: Crank rod and blade holder piston. G17: Blade rotation motor gear and satellite. G1: Rollers of the presser foot. April 2015 - 543160 CA lectra.com 8/214 Greasing the blade raising/lowering assembly guide rail and slider Vector® (iX and Q25 models) - Mechanical maintenance sheets M1 Indice 1 Page 1/1 Aim: To grease the slider and the rail every 50 hours of vibration. Tools: Grease pump and nozzles supplied in greasing kit 704542. G10 grease. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The front head cover is raised. Greasing procedure: 1. Position the pump nozzle on the slider grease nipple. 2. Press the pump to inject G10 grease, release the pressure and repeat until the grease overflows out of the slider. 3. Move the slider along the whole length of the rail to distribute the grease among the ball bearings. 4. Repeat the above 2 operations once. 50 hours of vibration April 2015 - 543160 CA G10 lectra.com 9/214 Greasing the Y trolley ball bearings and the rear bearing Vector® (iX and Q25 models) - Mechanical maintenance sheets M2 Indice 1 Page 1/2 Aim: To grease the ball bearings every 500 hours of vibration. Tools: Standard tools. G10 grease pump. Screw the conical nozzle supplied in “Greasing pack 704542” onto the G10 grease pump. G10 Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The head covers are removed. Y rear bearing greasing procedure: Perform the procedure described below for each of the 2 grease nipples on the Y rear bearing. 1. Position the pump nozzle on the grease nipple of the Y rear bearing (1). 2. Press the pump to inject the grease, release the pressure and repeat until the grease overflows out of the bearing. 3. Move the Y trolley/head assembly along the entire length of the rail (2) to spread the grease among the ball bearings. 4. Repeat the above 2 operations once. 2 1 April 2015 - 543160 CA lectra.com 10/214 Greasing the Y trolley ball bearings and the rear bearing M2 Indice 1 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets Y trolley greasing procedure: 1. Position the pump nozzle on the grease nipple (1). 2. Press the pump to inject the grease, release the pressure and repeat until the grease overflows out of the bearing. 3. Move the Y trolley along the entire length of the rail to spread the grease among the ball bearings. 4. Repeat the above 2 operations once. 5. Perform the same operations for grease nipple (2). 1 2 April 2015 - 543160 CA lectra.com 11/214 M3 Greasing the X guide rails and sliders Vector® Indice 2 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: To grease the X rail sliders every 500 hours of vibration. Tools: Standard tools. G10 grease pump and nozzles supplied in greasing kit 704542. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. There are three types of X rail that may be fitted to the machine. Use the appropriate greasing nozzle for the model. Greasing procedure: According to the date of cutter manufacturing, the location of the grease nipples differs. Old installation of the grease nipples: 1. Position the pump nozzle on the grease nipple and press 4 or 5 times on the pump to inject G10 grease into the slider simultaneously moving along the whole length the rail so that the grease fills the space between the balls (1). 2. The greasing is properly carried out when the grease overflows out of the slider. 3. Repeat that greasing operation for each slider. G10 G10 ! ! 500 hours of vibration THK BOSCH REXROTH INA 1 April 2015 - 543160 CA lectra.com 12/214 Greasing the X guide rails and sliders M3 Indice 2 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets New installation of the grease nipples: 4. Remove the covers at the mobile unit ends. 5. Position the pump nozzle on the grease nipple and press 4 or 5 times on the pump to inject G10 grease into the slider simultaneously moving along the whole length the rail so that the grease fills the space between the ball bearings (1). 6. The greasing is properly carried out when the grease overflows out of the slider. 7. Repeat that greasing operation for each slider. G10 1 April 2015 - 543160 CA lectra.com 13/214 M4 Greasing the vacuum turbine Vector® Indice 1 Page 1/7 (iX and Q25 models) - Mechanical maintenance sheets Aim: To grease the turbine front bearing. Every 850 hours of vacuum. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Tools: Grease pump (131962) - ISOFLEX NBU 15 grease cartridge (130255). A: ISOFLEX NBU 15 grease cartridge B: Empty cartridge supplied with the pump (used as a cartridge when filled with grease) C: Piston with chain attached D: Greasing nozzle E: Hose F: Top of pump G: Pump body A B C Warning, the piston (C) is essential to operate the pump! Do not lose it. E F G D Preparing the grease pump: 1. Unscrew the top (1) of the pump. 1 2. Pull the cap (2) out of the grease cartridge. 3. Insert the piston (3), with its chain until it reaches the edge of the cartridge. 2 3 April 2015 - 543160 CA lectra.com 14/214 Greasing the vacuum turbine M4 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/7 4. Place the chain in the piston (4). 5. Insert the grease cartridge into the tube, while simultaneously pressing the air release valve (5). 5 4 6. Remove the “PULL-OFF” cap with the loop handle (6). 6 7. Screw the top of the pump (7) back onto the body of the pump. 7 8. Fix the flexible hose (8) at the end of the pump. 8 April 2015 - 543160 CA lectra.com 15/214 Greasing the vacuum turbine M4 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/7 9. Pump to sufficiently pressurize the air pressure accumulator (9). 9 10. Activate the lever (10) several times until the grease begins to come out of the hose nozzle. 10 Launching the assistant: - Click on the button to enter the cutter operating software’s “Maintenance” session. - Click the test tab: - Click on “Test Assistant”: - Click on “Vacuum turbine run-in” and the following dialog box appears: Touch here April 2015 - 543160 CA lectra.com 16/214 Greasing the vacuum turbine M4 Indice 1 Vector® - Page 4/7 (iX and Q25 models) - Mechanical maintenance sheets The following dialog box appears: Touch here - A message appears: 11. Place some paper and polyethylene film (11) over the entire surface of the bed and flaps. 11 - Press the keypad validation button . - The following message appears: - Click on “Yes”, and the turbine begins to rotate at 5% of its maximum speed. You can now start the greasing. Touch here April 2015 - 543160 CA lectra.com 17/214 Greasing the vacuum turbine M4 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/7 Greasing the turbine: 12. Unlock the latches (12) to open the panel. 12 13. Insert the pump’s flexible greasing nozzle into the grease nipple (13) located in the cabinet. 13 13 14. Press 35 times: - Raise the lever to its stop in the upper position (14) and then press it down as far as it will go. - Activate the pump 35 times to inject the grease into the turbine bearing. Warning! During the greasing operation, the grease lever (14) should offer resistance to the pressure. If this is not the case, the pump is not injecting grease into the turbine. In this case, reprime the pump: Disconnect the pump and refer to points 9 and 10. 14 Keep the hose nozzle straight so that the grease does not leak from the sides. 15. Ensure that the pressure is maintained in the air accumulator (15): Check this by operating it to ensure it offers sufficient resistance to pressure. 15 April 2015 - 543160 CA lectra.com 18/214 Greasing the vacuum turbine M4 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 6/7 16. After 10 minutes the following message (16) appears: - Answer “Yes” if the 35 grease injections have been performed. - Answer “No” if the operation is not finished, and the turbine will keep running for 10 more minutes at 5% speed. 16 Automatic turbine run-in: 17. If you clicked on “Yes” the window (17) displays, giving the remaining running-in time. The turbine goes through the following stages automatically: - 3 minutes at 15% 3 minutes at 25% 3 minutes at 35% 3 minutes at 45% 3 minutes at 55% 3 minutes at 65% 3 minutes at 75% 3 minutes at 85% 3 minutes at 100% and then finishes with 3 minutes at 50% The complete breaking-in cycle lasts 33 minutes. April 2015 - 543160 CA lectra.com 19/214 Greasing the vacuum turbine M4 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 7/7 18. When the running-in has finished, press the button on the right. Touch here 19. To remove the pump, hold the hose pipe nozzle (18) and pull hard. 18 Check that grease is still coming out the hose nozzle (19) when you operate the pump, to ensure that it was still primed. 19 20. Purge the pump by pressing the air release valve (20). 20 April 2015 - 543160 CA lectra.com 20/214 Greasing/replacing the blade holder and crank rod Vector® M5 Indice 1 Page 1/5 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace and/or grease the blade holder. To grease the slider and rail every 50 hours of vibration. The cutter guarantee and performance are based on the use of the consumables specified by Lectra. It is essential to use consumables specifically defined by Lectra for this range of cutters. Using other consumables (in particular those from the previous range of cutters) alters performance and damages the system. Tools: Standard tools. Lectra G11 grease. Small brush. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The head covers are removed. Dismantling procedure 1. Lift the front head cover until the prop is engaged. 2. Press and hold in the push button (1) to immobilize the crankshaft. 3. Release (without unscrewing) the fixing screw (2). 4. Hold the crank rod (3) against the motor and remove the screw (4) by hand. - There should not be any space between the connecting pin and the crank rod (A). There is a danger of the crank rod bearings and fastening screw breaking if this procedure is not applied. 3 A 1 2 4 3 April 2015 - 543160 CA lectra.com 21/214 Greasing/replacing the blade holder and crank rod M5 Indice 1 Vector® Page 2/5 (iX and Q25 models) - Mechanical maintenance sheets 5. Remove the blade holder (5) from the top. 6. Remove the blade from the blade holder by removing the fixing screw (6). Warning! Risk of cuts. Use suitable gloves. 5 6 If the blade was broken, clear up all the debris and check the presser foot and guides. Greasing procedure: Each time the blade is changed: 1. With the blade removed, carefully wipe the blade holder with dry cleaning paper. 2. Check that the cavities (1) are not clogged with dried grease, if so clean them. 3. Lightly grease the 4 sides of the blade holder (2) with a small brush and some G11 grease. 4. Remove the excess grease. Every 50 hours of vibration: 5. Carry out points 1, 2 described above. 6. Inject some G11 grease (3) into the grease nipple (4) until the grease overflows. 7. Carry out points 3, 4 described above. 1 4 3 G11 2 G11 April 2015 - 543160 CA lectra.com 22/214 Greasing/replacing the blade holder and crank rod M5 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/5 Replacement procedure Warning! Risk of cuts. Use suitable gloves. 1. Offer up the blade to the blade holder. The Lectra logo and writing (1) must be on the same side as the screw (2), which corresponds to the blade cutting wire approximately along the blade holder axis. 2. Fasten the blade to the blade holder with its fastening screw (2). 2 1 3. Engage the blade holder fitted with its blade into the blade guide (3) and into the presser foot rollers (4), respecting the blade fitting orientation. 4. Lower the blade holder fitted with its blade: Ensure there is no binding of the blade with the presser foot rollers. 3 4 April 2015 - 543160 CA lectra.com 23/214 Greasing/replacing the blade holder and crank rod M5 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/5 5. Fasten the crank rod to the connecting pin: Because the pitch of the screw thread is fine, it is not necessary to apply screwlock to the screw (6). - Hold the crank rod (5) against the motor and screw in the screw (6) by hand. - There should not be any space between the connecting pin and the crank rod (A). There is a danger of the crank rod bearings and fastening screw breaking if this procedure is not applied. Do not apply screwlock to the screw! A 6 5 6. Press and hold in the push button (7) to immobilize the crankshaft. 7. Lock the crank rod fastening screw (6), keeping the crankshaft immobilized by the push button. 7 6 8. Close the cover. 9. Unlock the emergency stop button. April 2015 - 543160 CA lectra.com 24/214 Greasing/replacing the blade holder and crank rod M5 Indice 1 Vector® Page 5/5 (iX and Q25 models) - Mechanical maintenance sheets Software configuration 1. Touch the button on the toolbar: the Machine Commands window displays. 2. Touch the button to switch the cutter Power supply circuit back on. 1st case: Fitting a new blade of the same type 1. Touch the Blade tool holder area to activate it. 2. Touch the button. 3. Answer the question: Is the tool broken? - The blade wear indicator is automatically reset to zero. 4. Perform two sharpening cycles. 5. Return to the control window by touching the button on the toolbar. 2nd case: Fitting a new blade of a different type 1. Touch the button. 2. Choose a type of blade from the list. 3. Touch the OK button. - Adjust the wear percentage if necessary. 4. Return to the control window by touching the button on the toolbar. 3rd case: Fitting a worn blade 1. Measure the width of the blade with calipers at the narrowest part even if the blade is new. Dimension to measure 2. Enter the blade dimension in the Blade holder area. - The wear percentage displays automatically. Do not forget this operation: measuring the blade and indicating its actual dimension in the dialog box is important for cutting quality. In fact, this information is used to calculate the blade trajectory. 3. Perform two sharpening cycles. 4. Touch the Close button to return to the Machine Commands window. 5. Return to the control window by touching the April 2015 - 543160 CA button on the toolbar. lectra.com 25/214 OPM M6 Replacing the gear motor assembly and the wheels Vector® Index 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the gear assembly, the gear support place or the wheels of the OPM system. Tools: Standard tools - Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Open the right lateral door (1) with the triangular pattern die key. 2. Remove the right side door. 3. Unscrew the 4 beam fixing screws (2). 4. Remove the door support beam. 2 1 Remove the gear assembly: 5. Gently unscrew the 4 electric place fixing screws. 6. Disconnect the earth connectors of the electric plate. 7. Lift and then remove the electric plate. 8. Disconnect the power supply cables in the box (3). 9. Remove the support screw (4) of the gear assembly. 3 4 April 2015 - 543160 CA lectra.com + 26/214 Replacing the gear motor assembly and the wheels M6 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/3 10. Unscrew the cells support plate (5). 11. Pull the gear assembly outwards to extract the axis (6). Warning! The gear motor assembly is quite heavy. 5 6 Remove the wheel support plate: Lift the front of the machine using jacks. 12. Unscrew the 10 fixing screws (7). 13. Remove the wheel support plate. 7 + April 2015 - 543160 CA lectra.com 27/214 Replacing the gear motor assembly and the wheels M6 Index 1 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets Remove the wheel opposite the OPM: Lift each side of the machine using jacks. 14. Open the left side door (8) with the triangular pattern die key. 15. Unscrew the 6 fixing screws (9). 16. Remove the wheel support plate. 8 9 Remove the rear wheel: 17. Unscrew the four fixing screws (10). 18. Remove the rear wheel support plate. 10 + Replacement procedure 1. Reverse the operations described in the dismantling chapter. 2. Apply Blue Loctite 243 screwlock to all the screws except to the cover fastening screws. Adjust the height of the cells so that it is 7 mm from the bottom of the cell to the top of the cam fixed to the ground. April 2015 - 543160 CA lectra.com 28/214 Replacing the gear motor assembly (OPM) on the new vacuum box Vector® (iX and Q25 models) - Mechanical maintenance sheets M7 Index 2 Page 1/2 Aim: To replace the gear motor assembly, the gear motor support plate or the wheels of the OPM system. Tools: Standard tools - Loctite 243 normal screwlock. Initial state: Standard initial state described in paragraph 1. of the "Safety instructions" chapter. Removal procedure: 1. Open the right side door (1) with the triangular key, then remove it. 1 Removing the gear motor assembly: 2. Remove the support (2) from the door by taking out its 4 fixing screws. 3. Slightly unscrew the 4 screws securing the electrical plate (3). 4. Disconnect the earth connectors from the electrical plate. 5. Lift and then remove the electrical plate (3). 6. Disconnect the power supply cables in the motor housing (4). 3 4 2 7. Make a height mark (5), then remove the cell support (6) by removing the 2 screws (7). April 2015 - 543160 CA lectra.com 29/214 Replacing the gear motor assembly (OPM) on the new vacuum box Vector® (iX and Q25 models) - Mechanical maintenance sheets M7 Index 2 Page 2/2 8. Remove the support (8) by removing its 4 screws. 9. Remove the screw and washer (9) at the end of the shaft holding the gear motor assembly. 10. Pull the gear assembly outwards to remove it from the shaft (10). Warning! The gear motor assembly is quite heavy. 7 5 6 8 9 10 Reassembly procedure 1. Remove the cap (11) from the new motor. 2. Remove the vent cap (12) from the old motor and fix it to the new one. 11 12 3. Reassemble by performing the removal procedure in reverse order. 4. Apply Loctite 243 normal screwlock to the screws (7) and (9). April 2015 - 543160 CA lectra.com 30/214 CODA M8 Replacing the CODA Vector® Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To dismantle / replace the CODA. Tools: Standard tools. Lifting hooks and hoist. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Remove the side covers as per the sheet M17. - Remove the side profiles as per the sheet M19. Dismantling procedure: 1. Unscrew the 4 screws (1) on each side of the CODA. 2. Mark the position of the 4 angle brackets (2) on each side of the CODA using a pencil, for example. 3. Unscrew the 3 screws (3) from each of the 4 angle brackets on each side of the CODA. 4. Installing the lifting hooks. 5. Remove the CODA by lifting using the lifting hooks. 2 3 1 Replacement procedure: 1. Perform the replacement operations in the reverse order. 2. Position the angle brackets on the marks you made earlier. April 2015 - 543160 CA lectra.com 31/214 Cutter maintenance Vector® E1 Index 1 (iX and Q25 models) - Maintenance Page 1/3 Frequency Weekly, 200 h and 250 hours Tools - Cloth and vacuum cleaner - Vacuum turbine air filter - Vacuum turbine sealing joint For cleaning operations, do not use a compressed air blower. When removing dust, cleaning or replacing the various machine air filters, you are recommended to wear: - Safety goggles with side protectors. - Anti-dust mask type FFP3. - Protection gloves specially adapted for cut material. - Specially adapted work clothing (especially if the Vector is cutting Technical Textiles). This equipment is not supplied with the machine. Initial state The two electrical power supplies (Control and Vacuum) and the air supply are switched off at the cutter main switches. Weekly maintenance When cleaning the translucent covers (head cover, beam ends), use only mild soapy water to avoid chemical damage (cracks) in these covers. 1. Ensure that the cutter is kept clean by regular vacuuming of the belts and the cutting area, to remove all the cutting waste. 2. Visually check the condition of the X belts (1): edges raised, not rectilinear, etc. 3. Check that the conveyor's steel sealing flaps (2) have not deteriorated. 4. Check the condition of the front comb (3): The teeth should not be broken or bent. Rear view 3 3 2 2 1 1 Front view April 2015 - 543160 CA lectra.com 32/214 Cutter maintenance Vector® Index 1 (iX and Q25 models) - Maintenance Page 2/3 5. Check the condition of the cutting conveyor bristle blocks. 6. Clean the vacuum air inlet grille: - Unclip the grille from its support. - Take out the filter. - Remove any accumulated dust from the grille and filter before re-fitting them. The dust filter on the air inlet should be replaced every 2000 h of operation (Maintenance Kit). Regularly check that no plastic or paper is obstructing the air inlet. If a cutting waste recovery tray is used, this should not obstruct it in any way. 7. Open the right front door and purge the regulator filter (5). The purge is manual; simply press the button located at the bottom of the filter to perform the purge. 5 8. Check the cleanliness of the filter: If the filter is dirty and clogged, replace it. The filter should be replaced every 2000 h of operation (Maintenance kit). - Unscrew the filter bracket. - Fit the new filter in its support and re-tighten it. Depending on the brand of the regulator filter in the cutter, it may have a semi-automatic purge. In this case, the purge is performed automatically when the air supply is switched off (on/off switch). 9. Clean the vacuum turbine filter: - Unscrew and withdraw the vacuum pipe access cover at the front right of the cutter. - Release the filter/grille unit from the pipe. April 2015 - 543160 CA lectra.com 33/214 Cutter maintenance Vector® Index 1 (iX and Q25 models) - Maintenance Page 3/3 - Remove the 2 sealing joints (6). - Remove the filter (7) from the grille. - Using a vacuum cleaner, clean the entire length of the pipe (8) and the grille. 6 7 8 6 - Remove the dust from the filter (7) using the vacuum cleaner. - Replace the clean filter (7) on the grille, taking care to fold the two ends over inside the grille. - Replace the 2 sealing joints so as to correctly maintain the filter. The joint should cover the filter fold. - Replace the filter/grille unit in the tube. - Close the vacuum pipe access cover. The frequency of the vacuum filter cleaning and replacement depends on the type of material being cut. The frequency should be adjusted based on the application. 200 h maintenance 1. Replace the vacuum turbine filter. Two filters are supplied with the cutter on delivery for replacement after 200 hours and 400 hours of operation. The filters required for subsequent maintenance operations are included in the various Maintenance Kits. 250 h maintenance 1. Open the covers of the electrical cabinets and remove all the dust from the cabinets using a vacuum cleaner. The other operations related to preventive maintenance of the cutter (Maintenance Kits) are set out in the Preventive Maintenance Guide. April 2015 - 543160 CA lectra.com 34/214 Replacing the CODA encoder Vector® (iX and Q25 models) - Mechanical maintenance sheets M9 Index 1 Page 1/1 Aim: To dismantle / replace the CODA encoder. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Gently lift the CODA belt. 2. Disconnect the encoder (1) from the electric supply. 3. Unscrew the 2 screws (2). 4. Remove the encoder. 1 2 5. Heat the end of the axis to undo the glue. 6. Unscrew the 3 screws (3). 7. Unscrew the 2 screws (4). 4 3 Replacement procedure: 1. Perform the replacement operations in the reverse order. Apply Loctite 243 normal screwlock to the encoder's fastening screws and Loctite 638 block seal to the shaft of the encoder. April 2015 - 543160 CA lectra.com 35/214 M10 Vacuum Inspecting and servicing the vacuum box Vector® Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Tools: Standard tools. Frequency meter. Industrial vacuum cleaner. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The door and top cover of the vacuum box are removed. (see M11 sheet) Procedure: 1. Clean all parts of the box using an industrial vacuum cleaner. 2. Check the condition of the fixings and silent blocks of: - the turbine (1), - the turbine drive motor (2), - the box ventilation motor (3). 3. Check the condition and tension of the belts (4): - Place the frequency meter sensor close to the upper belt. - Tap lightly on the upper belt with a tool and measure the frequency, which should be between 54.6 and 56.9 Hz for used belts. 4. Check that the grease tube is in good condition (5) and that it is full of grease along its entire length. 5. Check the condition of the rubber seal and the filter box pipe collars (6). 1 3 6 2 5 4 April 2015 - 543160 CA lectra.com 36/214 Replacing the turbine only Vector® (iX and Q25 models) - Mechanical maintenance sheets M11 Index 1 Page 1/16 Aim: Replace the turbine only. Tools: Standard tools. Forklift or lifting winch. Straps. Ratchet wrench with extensions. Frequency meter. Normal Loctite 243 screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Take off the doors and front panels on the right and left sides (sheet M17). - Remove the right and left side sections (sheet M19). - Remove the CODA (sheet M8). Dismantling procedure: 1. Remove the seven fastening screws (1) from the box door and remove the door. 1 2. Remove the four top cover fastening screws (2a). - Pull the cover a few centimeters forward (2b). - Lift and then remove the cover (2c). 2a 2c 2b 2b 3. Remove the four fastening screws (3) from the cross piece. 4. Remove the cross piece (4). 3 3 April 2015 - 543160 CA 4 lectra.com 37/214 Replacing the turbine only M11 Index 1 Vector® Page 2/16 (iX and Q25 models) - Mechanical maintenance sheets 5. Take off the sound insulation cover (5) under the conveyor by removing the four screws. (Pass it under the conveyor through one of the panels previously removed.) 5 There are two methods of fixing the pipe to the turbine: see diagram below. 6. Version 1: Take out the four fastening screws (6) to release the turbine inside the box. 7. Version 2: Loosen the collar (A) to release the turbine inside the box. The photos shown below are of version 1. 6 6 6 6 Version 2 Version 1 A 6 6 6 April 2015 - 543160 CA lectra.com 38/214 Replacing the turbine only M11 Index 1 Vector® Page 3/16 (iX and Q25 models) - Mechanical maintenance sheets On the front left side of the conveyor: 8. Remove the nut (7) to release the grease nipple and its tube attached to the turbine. 7 Removing the filter box: 9. Unscrew the two connectors and their pneumatic tubes (8). 10. Loosen the collars (9). 8 9 11. Loosen the collars (10). 10 April 2015 - 543160 CA lectra.com 39/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/16 12. Remove the screws (11) from under the filter box. 11 13. Remove the screws (12) and nuts on the sides of the filter box. 12 Warning! 2 nuts to be taken out. 14. Remove the filter box (13). 13 Removal of the belts: 15. Unscrew the screw by 1 turn (14). 14 April 2015 - 543160 CA lectra.com 40/214 Replacing the turbine only M11 Index 1 Vector® Page 5/16 (iX and Q25 models) - Mechanical maintenance sheets If you do not have a frequency meter, take measurement (A) before slackening the belts. 16. Unscrew the nut by 1/4 turn (15). 17. Unscrew the nut by a few centimeters (16). A 15 16 18. Push the motor plate towards the turbine (17) to release the belts. 19. Check that the three belts (18) are free of the turbibe pulley. 17 18 20. Use a pencil to mark the position of the turbine on its support (19). 19 April 2015 - 543160 CA lectra.com 41/214 Replacing the turbine only M11 Index 1 Vector® Page 6/16 (iX and Q25 models) - Mechanical maintenance sheets Extracting the turbine using a lifting device: winch, forklift, etc. If you do not have a lifting device, you can take the turbine out manually; for instructions please see the next page. 21. Pass the straps (20) through the turbine. - Keep the straps slightly tensioned using an appropriate lifting device to take the pressure off the turbine when removing its fastening screws. 20 22. Remove the 4 screws (21) fixing the turbine to its support. 21 21 23. Raise then tilt the turbine (22). 24. Remove the turbine (23). 23 22 April 2015 - 543160 CA lectra.com 42/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 7/16 Manually extracting the turbine: This task requires two people. The turbine weighs approximately 65 kg. You are strongly advised to wear safety shoes. - Place the grease tube somewhere where it will not be crushed during the operation. - Remove the fastening screws A and B. B A - Take out the turbine in the manner shown in the photos below. C D E F G April 2015 - 543160 CA H lectra.com 43/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 8/16 Preparing the new turbine: Fitting the grease tube and its grease nipples to the turbine: - Unpack the new turbine. - Remove the protective cap (A) using a flat screwdriver. - Remove the plastic grease nipple (B) screwed to the turbine. B A 25. Screw the grease nipple supplied (C) to the turbine. C 26. Check that the collar (D) is on the tube before inserting it. 27. Push the tube (E) as far as it will go onto the grease nipple, using “Festo” pliers. 28. Using a crimping tool (F) pinch the collar firmly without damaging the tube. E F D April 2015 - 543160 CA lectra.com 44/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 9/16 Manually assembling the turbine: If you have a lifting device, please refer to the next page. - Place a wedge (E) approximately 4 to 5 cm thick where the turbine pulley will sit. - Lift the turbine and bring it up to its support (F). E F - Position and screw in the turbine's rear fastening screws (G) without locking them. Warning! The number of screws may differ for different versions (see below). Old fixing New fixing G - Lifting the front of the turbine. - Hand tighten the two other screws (H) at the front of the turbine. Line the turbine up with the marks made during removal. - Lock all the nuts. - Remove the wedge. H - Perform the reassembly operations at the start of the “Fitting the belts” chapter. April 2015 - 543160 CA lectra.com 45/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 10/16 Replacement procedure: Assembling the turbine using a lifting device: 1. Lift the turbine using an appropriate lifting device. 1 2. Tilt the turbine (2) to position it in its support. 3. Position the grease tube correctly (3). 2 3 The tube should pass over the fastening foot so it does not touch the belts. 4. Keep the turbine suspended, then screw the 2 screw, flat washer and split washer sets without locking them (4). 5. Then screw the 2 screw, flat washer and split washer sets without locking them (5). 4 5 April 2015 - 543160 CA lectra.com 46/214 Replacing the turbine only M11 Index 1 Vector® Page 11/16 (iX and Q25 models) - Mechanical maintenance sheets 6. Fit the grease nipple (6) to the wall with its nut and washer. Box exterior 6 7. Version 1: Fasten the four fastening screws (7) glued with Loctite 243 normal screwlock. 8. Version 2: Tighten the Serflex collar (A). 7 7 7 7 Version 2 Version 1 A 7 7 7 April 2015 - 543160 CA lectra.com 47/214 Replacing the turbine only M11 Index 1 Vector® Page 12/16 (iX and Q25 models) - Mechanical maintenance sheets 9. Put the sound insulating box back (8): - Apply Loctite 243 normal screwlock to the screws. - Start by partially screwing in the two screws (A). - Engage the openings in the base of the cover on the screws (A). - Fix the top of the cover using the screws (B). - Lock the two screws at the bottom to the chassis (A). Check that the bottom of the cover is flat against the box wall to ensure good sound insulation. B + 8 A 10. Lower or slightly raise the turbine (9) to position it in line with the marks made during removal. 9 Warning! The number of screws may differ for different versions (see below). Old fixing April 2015 - 543160 CA New fixing lectra.com 48/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 13/16 11. Lock the screws (10) then remove the straps. 10 Fitting the belts: 12. Position the belts on the motor and turbine pulleys. - WARNING! You must respect the alignment of the belts shown in the view (11). - All the belts must have the writing in the same direction (12). 11 12 Tensioning the belts without a frequency meter: 13. Set the nut (13) to the location shown by measurement (A) taken during removal. 14. Tighten the nut (14) and bring the plate to stop on the nut (13). 15. Lock the nuts. A 14 April 2015 - 543160 CA 13 lectra.com 49/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 14/16 Tensioning the belts with a frequency meter: 16. Tighten the nut (15) to tension the belts. 17. Place the frequency meter probe (16) above the upper belt. - Tap lightly on the upper belt with a tool and measure the frequency, which should be between 54.6 and 56.9 Hz. If new belts are being fitted, use a frequency of between 63 and 66 Hz. 18. Tighten the nuts (15) and (17). 19. Measure the frequency again; if it is not correct, repeat the tension adjustment procedure. 54.6 to 56.9 Hz Old belts 16 15 63 to 66 Hz New belts 17 20. Lock the nut (18). 18 21. Replace the filter box (19). You may have difficulty reinstalling the seal (20). If so, you will have to remove the filter and pass your arm inside the box to position it correctly. 19 April 2015 - 543160 CA 20 lectra.com 50/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 15/16 22. Fix the filter box with its screws (21) glued with Loctite 243 normal screwlock. 23. Refit the connections and tubes (22) to the filter box. 21 + 22 Warning! 2 nuts to be locked. 24. Tighten the collars on the joints (23) and (24). 23 Warning! The ends of the collars must be positioned so that they never touch the CODA belt. 24 25. Fit the cross piece (25) with its four fastening screws. + 25 April 2015 - 543160 CA lectra.com Align the flat surface of the cross-piece with the flat surface of the box. 51/214 Replacing the turbine only M11 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 16/16 26. Fasten the box cover (26) with its four fastening screws. 26 27. Refit the front door of the box. 28. Refit all the panels that were removed (sheet M17). 29. Refit the CODA (sheet M8). 30. Refit the lateral sections (sheet M19). 31. Reconnect the power to the machine. April 2015 - 543160 CA lectra.com 52/214 Replacing the motor/turbine assembly Vector® (iX and Q25 models) - Mechanical maintenance sheets M12 Index 1 Page 1/10 Aim: Replace the motor/turbine assembly. Tools: Standard tools. Forklift or lifting winch. Straps. Ratchet wrench with extensions. Frequency meter. Normal Loctite 243 screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Take off the doors and front panels on the right and left sides (sheet M17). - Remove the right and left side sections (sheet M19). - Remove the CODA (sheet M8). Dismantling procedure: 1. Remove the seven fastening screws (1) from the box door and remove the door. 1 2. Remove the four top cover fastening screws (2a). - Pull the cover a few centimeters forward (2b). - Lift and then remove the cover (2c). 2a 2c 2b 2b 3. Remove the four fastening screws (3) from the cross piece. 4. Remove the cross piece (4). 3 3 April 2015 - 543160 CA 4 lectra.com 53/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 2/10 (iX and Q25 models) - Mechanical maintenance sheets 5. Take off the sound insulation cover (5) under the conveyor by removing the four screws. (Pass it under the conveyor through one of the panels previously removed.) 5 There are two methods of fixing the pipe to the turbine: see diagram below. 6. Version 1: Take out the four fastening screws (6) to release the turbine inside the box. 7. Version 2: Loosen the collar (A) to release the turbine inside the box. The photos shown below are of version 1. 6 6 6 6 Version 2 Version 1 A 6 6 6 April 2015 - 543160 CA lectra.com 54/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 3/10 (iX and Q25 models) - Mechanical maintenance sheets 8. Remove the nut (7) to release the grease nipple and its tube attached to the turbine. 9. Loosen the cable seal (8) so that the motor cable can slide. 10. Remove the six fastening screws (9) from the plate and remove it. 7 9 8 11. Remove the cover of the motor connection housing (10) by unscrewing its four screws. 12. Disconnect the motor (11). 13. Disconnect the small terminal block (12). 14. Take out the motor power supply cable (13). 15. Take out the wire (14) and its cable seal. 10 11 13 April 2015 - 543160 CA 12 14 lectra.com 55/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 4/10 (iX and Q25 models) - Mechanical maintenance sheets Removing the filter box: 16. Unscrew the two connectors and their pneumatic tubes (15). 17. Loosen the collars (16). 15 16 18. Loosen the collars (17). 19. Remove the screws (18) from under the filter box. 17 18 April 2015 - 543160 CA lectra.com 56/214 Replacing the motor/turbine assembly M12 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/10 20. Remove the screws (19) and nuts on the sides of the box. 19 Warning! 2 nuts to be taken out. 21. Remove the filter box (20). 20 22. Remove the nuts fastening the motor/turbine assembly (21) to the back of the box. 21 21 April 2015 - 543160 CA lectra.com 57/214 Replacing the motor/turbine assembly M12 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 6/10 23. Remove the nut (22) fastening the motor/turbine assembly to the front of the box. 22 24. Fit straps to the three eye bolts (23) on the turbine and motor. 25. Lift out the motor/turbine assembly using a forklift or a lifting winch (24). 23 24 Replacement procedure: 1. Using a forklift or a lifting winch, lift the motor/turbine assembly (1A) and place it on its three silent blocks (1B) in the vacuum box. 1A 1B April 2015 - 543160 CA lectra.com 1B 58/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 7/10 (iX and Q25 models) - Mechanical maintenance sheets 2. Position the grease tube correctly (2). 2 The tube should pass over the fastening foot so it does not touch the belts. 3. Fit the grease nipple (3) to the wall with its nut and washer. 3 4. Version 1: Fasten the four fastening screws (4) glued with Loctite 243 normal screwlock. 5. Version 2: Tighten the Serflex collar (A). 4 4 4 4 Version 2 Version 1 A 4 4 4 April 2015 - 543160 CA lectra.com 59/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 8/10 (iX and Q25 models) - Mechanical maintenance sheets 6. Put the sound insulating box back (5): - Apply Loctite 243 normal screwlock to the screws. - Start by partially screwing in the two screws (A). - Engage the openings in the base of the cover on the screws (A). - Fix the top of the cover using the screws (B). - Lock the two screws at the bottom to the chassis (A). Check that the bottom of the cover is flat against the box wall to ensure good sound insulation. B 5 A 7. Lock the three nuts (6). 6 6 6 - Replace the filter box (7). You may have difficulty reinstalling the seal (8). If so, you will have to remove the filter and pass your arm inside the box to position it correctly. 7 April 2015 - 543160 CA 8 lectra.com 60/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 9/10 (iX and Q25 models) - Mechanical maintenance sheets 8. Fix the filter box with its screws (9) glued with Loctite 243 normal screwlock. 9. Refit the connections and tubes (10) to the filter box. 9 + 10 Warning! 2 nuts to be locked. 10. Tighten the collars on seals (11) and (11b). Warning! The ends of the collars must be positioned so that they never touch the CODA belt. 11b 11 11. Connect the 15 KW (12) or 22 KW (12b) motor. 12. Connect the small terminal block (13). 15 KW motor Inverter 22 KW motor W 12B U V 12 13 April 2015 - 543160 CA lectra.com 61/214 Replacing the motor/turbine assembly M12 Index 1 Vector® Page 10/10 (iX and Q25 models) - Mechanical maintenance sheets 13. Re-tighten the cable seal (14). 14. Fasten the cover (15) of the motor connection housing. 15. Fasten the motor access plate (16). 14 15 16 16. Fit the cross piece (17) with its four fastening screws. Align the flat surface of the cross-piece with the flat surface of the box. + 17 17. Fit the box cover (18) with its four fastening screws. 18 18. Refit the front door of the box. 19. Refit all the panels that were removed (sheet M17). 20. Refit the CODA (sheet M8). 21. Refit the lateral sections (sheet M19). April 2015 - 543160 CA lectra.com 62/214 M13 Replacing and adjusting the turbine belts Vector® Index 1 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: Replace/adjust the turbine belts Tools: Standard tools. Set of Allen wrenches. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Removal procedure: 1. Unscrew the 7 screws (1) fastening the turbine box door and remove the door. 1 If you do not have a frequency meter, take measurement (A) before slackening the belts. 2. Unscrew the nut by 1/4 turn (2). 3. Unscrew the nut by a few centimeters (3). A 2 3 4. Push the motor plate towards the turbine (4) to release the belts. 5. Remove the three belts (5). 5 4 April 2015 - 543160 CA lectra.com 63/214 Replacing and adjusting the turbine belts M13 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 Replacement procedure: 1. Position the belts on the motor and turbine pulleys. - WARNING! You must respect the alignment of the belts shown in the view (1). - All the belts must have the writing in the same direction (1B). 1 1B Adjusting the new belts without a frequency meter: 2. Set the nut (2) to the location shown by measurement (A) taken during removal. 3. Tighten the nut (3) and bring the plate right up to the nut (2). - Tighten the nuts (2) and (3). A 2 3 Tensioning the belts with a frequency meter: 4. Tighten the nut (4) to tension the belts. 5. Place the frequency meter sensor (5) close to the upper belt. - Tap lightly on the upper belt with a tool and measure the frequency, which should be between 54.6 and 56.9 Hz. If new belts are being fitted, use a frequency of between 63 and 66 Hz. 6. Tighten nuts (4) and (6). 7. Measure the frequency; if it is not correct, repeat the tension adjustment procedure. 54.6 to 56.9 Hz 5 Old belts 4 63 to 66 Hz 6 New belts 8. Reinstall the turbine box door with its 7 fastening screws. April 2015 - 543160 CA lectra.com 64/214 Replacing the turbine drive motor Vector® (iX and Q25 models) - Mechanical maintenance sheets M14 Index 1 Page 1/8 Aim: To replace the motor. Tools: Standard tools. Forklift or lifting winch. Straps. Ratchet wrench with extensions. Frequency meter. Normal Loctite 243 screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Take off the doors and front panels on the right and left sides (sheet M17). - Remove the right and left side sections (sheet M19). - Remove the CODA (sheet M8). Dismantling procedure: 1. Remove the seven fastening screws (1) from the box door and remove the door. 1 2. Remove the four top cover fastening screws (2a). - Pull the cover a few centimeters forward (2b). - Lift and then remove the cover (2c). 2a 2c 2b 2b 3. Remove the four fastening screws (3) from the cross piece. 4. Remove the cross piece (4). 3 3 April 2015 - 543160 CA 4 lectra.com 65/214 Replacing the turbine drive motor M14 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/8 5. Partially unscrew the cable seal (5). 6. Unscrew the eight screws fastening the access plate (6) and remove the plate. 5 6 7. Remove the cover of the motor connection housing (7) by unscrewing its four screws. 8. Disconnect the motor (8). 9. Disconnect the small terminal block (9). 7 9 8 10. Take out the motor power supply cable (10). 11. Take out the wire (11) and its cable seal. 10 April 2015 - 543160 CA 11 lectra.com 66/214 Replacing the turbine drive motor M14 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/8 Removal of the belts: 12. Unscrew the screw by 1 turn (12). 12 If you do not have a frequency meter, take measurement (A) before slackening the belts. 13. Unscrew the nut by 1/4 turn (13). 14. Unscrew the nut by a few centimeters (14). A 13 14 15. Push the motor plate towards the turbine (15) to release the belts. 16. Check that the three belts (16) are free of the turbine pulley. 15 April 2015 - 543160 CA 16 lectra.com 67/214 Replacing the turbine drive motor M14 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/8 17. Hold and support the motor using straps and a forklift (17). 18. Unscrew the four screws and nuts (18) fastening the motor. 19. Lift and then remove the cover (19). 17 19 18 20. Mark the position (B) of the pulley on the worn motor shaft for copying over to the new motor For information: in the factory, the pulley is preset (before final adjustment) 43mm from the end of the motor shaft. 20 B 21. Remove the pulley from the old motor. 22. Remove the two Allen screws (21). 23. Take one of the screws (21) and screw it into the threaded hole (22) to separate the hub from the pulley. 22 21 April 2015 - 543160 CA lectra.com 68/214 Replacing the turbine drive motor M14 Index 1 Vector® Page 5/8 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Put the pulley (1) on the shaft of the new motor. 2. Put the hub (2) on the shaft of the new motor, applying the measurement (B) recorded during removal. 3. Insert and tighten the screws (3) with Loctite 243 screwlock in the threaded holes. B 1 2 2 3 4. Attach straps to the new motor (4) and lift the motor using a winch or forklift. 5. Position the motor on its plate (5). 6. Fasten the motor with its 4 screws (6). 4 5 6 7. Connect the 15 KW (7) or 22 KW (7b) motor. 8. Connect the small terminal block (8). 15 KW motor Inverter 22 KW motor W 7B U V 7 8 April 2015 - 543160 CA lectra.com 69/214 Replacing the turbine drive motor M14 Index 1 Vector® Page 6/8 (iX and Q25 models) - Mechanical maintenance sheets 9. Re-tighten the cable seal (9). 10. Fasten the cover (10) of the motor connection housing. 11. Fasten the motor access plate (11). 9 10 11 12. Position the belts on the motor and turbine pulleys. - WARNING! You must respect the alignment of the belts shown in the view (12). - All the belts must have the writing in the same direction (13). 12 13 Tensioning the belts without a frequency meter: 13. Set the nut (14) to the location shown by measurement (A) taken during removal. 14. Tighten the nut (15) and bring the plate right up to the nut (14). - Lock the nuts. A 15 April 2015 - 543160 CA 14 lectra.com 70/214 Replacing the turbine drive motor M14 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 7/8 Tensioning the belts with a frequency meter: 15. Tighten the nut (16) to tension the belts. 16. Place the frequency meter sensor (17) over the upper belt. - Tap lightly on the upper belt with a tool and measure the frequency, which should be between 54.6 and 56.9 Hz. If new belts are being fitted, use a frequency of between 63 and 66 Hz. 17. Tighten the nuts (16) and (18). 18. Measure the frequency again; if it is not correct, repeat the tension adjustment procedure. 54.6 to 56.9 Hz 17 16 Old belts 63 to 66 Hz New belts 18 19. Lock the nut (19). 18 20. Fit the cross piece (20) with its four fastening screws. + Align the flat surface of the cross-piece with the flat surface of the box. 20 April 2015 - 543160 CA lectra.com 71/214 Replacing the turbine drive motor M14 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 8/8 21. Fit the box cover (21) with its four fastening screws. 21 22. Refit the front door of the box. 23. Refit all the panels that were removed (sheet M17). 24. Refit the CODA (sheet M8). 25. Refit the lateral sections (sheet M19). 26. Reconnect the machine to the power supply. April 2015 - 543160 CA lectra.com 72/214 Replacing the turbine box ventilation motor Vector® (iX and Q25 models) - Mechanical maintenance sheets M15 Index 1 Page 1/2 Aim: To replace the ventilation motor. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Take off the doors and front panels on the right and left sides (sheet M17). - Remove the right and left side sections (sheet M19). - Remove the CODA (sheet M8). Dismantling procedure: 1. Remove the seven fastening screws (1) from the box door and remove the door. 1 2. Remove the four top cover fastening screws (2a). - Pull the cover a few centimeters forward (2b). - Lift and then remove the cover (2c). 2a 2c 2b 2b 3. Unplug the motor connector (3) on the plate. 4. Remove the cover of the motor connection housing (4) by unscrewing its four screws. 5. Disconnect the motor, and then pull out the cable through the cable seal (5). 5 3 4 April 2015 - 543160 CA lectra.com 73/214 Replacing the turbine box ventilation motor M15 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 6. Remove the rear left side cover (see sheet M17). 7. Loosen the outlet duct fastening collar (6). 8. Unscrew the 4 fastening screws (7). 9. Take the motor out from above. 6 7 Replacement procedure: 1. Install the new motor and tighten the nuts slightly so as not to crush the rubber seals (8). 2. Connect the motor as shown in photo (9). 8 9 3. Perform the dismantling operations in the reverse order. April 2015 - 543160 CA lectra.com 74/214 Conveyor M16 Removing the rear covers Vector® Indice 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/2 Aim: To remove the rear covers. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. In the first photo the roll unwinder is removed but the panel removal operation is still the same. Dismantling procedure: Upper rear panels: 1. Take out the screws then remove the three panels (1), (2) and (3). 1 3 2 Lower right rear panel: 2. First remove the panel through which the cables pass (4). 3. Then remove the panel (5). 4 5 Lower left rear panel: 4. Open the side cover (6) with the triangular pattern die key supplied with the machine, then remove it by pulling it upwards to release it from its notches. 6 April 2015 - 543160 CA lectra.com 75/214 Removing the rear covers M16 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 5. Take the screws out of the panel (7) then remove it. 7 6. Remove the screws (8) then loosen the collar (9). 7. Take out the screws (10) then remove the panel. 8 9 10 Replacement procedure: 1. Put the panels back in the reverse order to their removal. April 2015 - 543160 CA lectra.com 76/214 Removing the side covers Vector® (iX and Q25 models) - Mechanical maintenance sheets M17 Indice 1 Page 1/3 Aim: To remove the side covers. Tools: Standard tools. Triangular pattern die keys. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: Right side of the machine: 1. First open the cover (1) with the triangular pattern die key supplied with the machine, then remove it by pulling it upwards to release it from its notches. 2. Then open the cover (2) in the same way as for cover (1). 1 2 2 3. Open the cabinet door (3) with the triangular pattern die key. 4. Remove the pins from the three hinges (4) to remove the door. 3 4 April 2015 - 543160 CA lectra.com 77/214 Removing the side covers M17 Indice 1 Vector® Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets Left side of the machine: 5. Open the cover (5) with the triangular pattern die key, then remove it by pulling it upwards to release it from its notches. 6. Perform the same procedure for cover (6). 5 6 Replacement procedure: Right side of the machine: 1. First fix cover (2) in place: - Position the bottom of the cover in the notches (7), then lock it with the triangular pattern die key. 7 7 2 2 2. Then fix cover (1) in place: April 2015 - 543160 CA lectra.com 78/214 Removing the side covers M17 Indice 1 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets - Position the bottom of the cover in the notches (8), then lock it with the triangular pattern die key. 1 8 8 3. Fix the cabinet door (3) in place: - Position the door on the hinges, then reinstall the pins in the three hinges (4). 4 3 Left side of the machine: 4. Position the bottoms of the covers in their respective notches (9) and (10), then lock these with the triangular pattern die key. 10 9 9 10 April 2015 - 543160 CA lectra.com 79/214 Adjusting the height of the lateral covers Vector® M18 Index 1 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Tools: Standard tools. Triangular pattern die key. Adjustment procedure: The side covers should be adjusted so that the adhesive strip along the side is correctly aligned (Vector logo). Left side 1. Remove the cover (1). 2. Unscrew the screw (2). 3. Adjust the height of the tie (3) to obtain the same amount of clearance between the top and bottom of the covers (4). 4. Adjust the sideways play of the side covers (5) to obtain a clearance of 4mm +/- 0.75mm). 1 2 3 4 5 4mm (+/- 0.75mm) 4 April 2015 - 543160 CA lectra.com 80/214 Adjusting the height of the lateral covers M18 Index 1 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets Right side 5. Remove the cover (1). 6. Unscrew the screws (2). 7. Adjust the height of the support (3) to obtain the same amount of clearance between the top and bottom of the covers (4). 8. Adjust the sideways play of the side covers (5) to obtain a space of 4mm +/- 0.75mm). 1 2 3 4 4 5 4mm (+/- 0.75mm) April 2015 - 543160 CA lectra.com 81/214 M19 Removing the side profiles Vector® Index 1 Page 1/4 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove or replace the side profiles. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The side panels are removed (sheet M17). - The photos shown on this sheet are of the left side profile, but the procedure is the same for the right side profile. Dismantling procedure: 1. Disconnect the emergency stop controls on the right (1) and/or left (1b) sides. A2 J 34 / W 40 Right side 1 13 Left side 1b 2. Remove all the screws but without taking off the flap flange (2). 2 April 2015 - 543160 CA lectra.com 82/214 Removing the side profiles M19 Index 1 Vector® Page 2/4 (iX and Q25 models) - Mechanical maintenance sheets 3. Partially unscrew the two screws (3). 4. Remove the cover (4). 3 4 5. Remove the screw (5). 6. Remove the part (6). 6 5 7. Remove the three screws (7). 8. Remove the part (8). 9. Remove the part (9). 8 7 9 April 2015 - 543160 CA lectra.com 83/214 Removing the side profiles M19 Index 1 Vector® Page 3/4 (iX and Q25 models) - Mechanical maintenance sheets 10. Remove the two screws (10). 11. Remove the parts (11) and (12). 10 12 11 12. Unclip and remove the screw cover (13). 13. Remove the screw (14). 14. Remove the screw (15). 13 14 15 April 2015 - 543160 CA lectra.com 84/214 Removing the side profiles M19 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/4 15. Remove the two screws (16) and (17). 17 1 16 16. Remove the two screws (18) and (19). 18 19 17. Remove the two screws (20). 18. Remove the profiles. 20 Replacement procedure: 1. To reinstall, perform the removal operations in reverse order. April 2015 - 543160 CA lectra.com 85/214 Cleaning the roller ramps Vector® (iX and Q25 models) - Mechanical maintenance sheets M20 Indice 1 Page 1/1 Aim: To clean the roller ramps. Tools: Standard tools - Loctite 222 normal screwlock - Vacuum cleaner. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Remove approximately ten of the slats as per the sheet M21. 2. Use a vacuum cleaner to clean the roller ramps. Replacement procedure: 1. Replace the slats as per the sheet M21. April 2015 - 543160 CA lectra.com 86/214 M21 Replacing the slats and blocks Vector® Indice 2 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the worn slats and blocks. Tools: Standard tools - Loctite 222 normal screwlock - Set of 50 blocks: 129951. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Remove the screws (1) over the entire length of the side fastening plates. 2. Unscrew the screws (2), (3) and (4), and then remove the upper profiles. 3. Remove the flanges and the side fastening plates. 2 1 3 4 4. Unscrew the stop blocks (5) on both sides of the slats. - Remove the slats containing the worn blocks and place them on the trestles. 5. Extract the blocks (6) through one of the sides of the slat. 5 6 Replacement procedure: Warning! there are two types of slat supports (7). 1. Place the slats such that the oblong holes (8) are on the right side of the conveyor. Apply Loctite 222 weak screwlock to the fastening screws of slats. OLD TYPE: 7 Old type April 2015 - 543160 CA 8 lectra.com 87/214 Replacing the slats and blocks M21 Indice 2 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets NEW TYPE: 2. Place the slats such that the oblong holes (8) are on the right side of the conveyor. 3. Always first tighten the left side of the slat. Apply Loctite 243 normal screwlock to the fastening screws of slats. Tighten the screws of the stop blocks to a torque of 1.2 Nm. 7 New type 8 Place the last slat by fitting it at a slant between the previous two. 4. Perform a complete turn of the conveyor for verification. 5. Reverse the operations described in the dismantling chapter. April 2015 - 543160 CA lectra.com 88/214 Vector® M22 Replacing the conveyor motor Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/1 Aim: To dismantle or replace the conveyor motor. Tools: Standard tools. Revolving. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Open the left lateral panels. 2. Disconnect the motor's electrical connections. 3. Unscrew the motor's 4 fastening screws (2), without removing them. 4. Gently lift the motor to slacken the chain and then remove the Snap-on clip link (1) and remove the chain. 5. Remove the 3 fastening screws (2) of the motor and let the assembly pivot around the screw (3). 6. Put a support under the motor and hold it. 7. Unscrew the screw (3) and remove the motor. 1 2 3 Replacement procedure: 1. Perform the replacement operations in the reverse order. April 2015 - 543160 CA lectra.com 89/214 Replacing the conveyor encoder belt Vector® (iX and Q25 models) - Mechanical maintenance sheets M23 Index 1 Page 1/1 Aim: To replace the conveyor encoder belt. Tools: Standard tools. Loctite 243 normal screwlock. Triangular pattern die key. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Open the side panels with the triangular pattern die key. Panels 2. Disconnect the encoder (1). 3. Gently unscrew the 2 screws (2) and move the flange/encoder assembly. 4. Remove the belt (3). 5. Finish unscrewing the 2 screws (2) and remove the flange/encoder assembly. 3 + 1 2 Replacement procedure: 1. Replace the belt and perform the dismantling operations in the reverse order. 2. Adjust the belt tension by moving the flange/encoder assembly so that the teeth of the belt do not skip. Apply Loctite 243 normal screwlock to the screws. A conveyor calibration must be performed. Launch the “Conveyor calibration” assistant. April 2015 - 543160 CA lectra.com 90/214 X drive M24 Replacing the X drive belts Vector® Index 1 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the X drive belts. Tools: Standard tools. Frequency meter 126305. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The side covers are removed. Dismantling procedure: On each side, at the front of the machine: 1. Unscrew the locknut by a few turns (1). 2. Unscrew the belt tensioner fastening screws (2) by a few turns. 3. Unscrew the tension screw (3) to slacken the belts. 2 3 1 4. Unscrew the fastening screws (4) from the supporting blocks (5). 5. Remove the supporting blocks (5). 6. Remove the belts. 4 5 4 5 April 2015 - 543160 CA lectra.com 91/214 Replacing the X drive belts M24 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 Replacement procedure: 50RT10/4410 M CA 1303803 F 50RT10/4410 M CA 1303803 F 1. Position the new belts so that the writing can be read in the same direction from one side of the machine. 2. Fit the belts in the notches that are provided (6). 3. Position the sloping side (7) of the wedges facing upwards. 4. Fasten the wedge screws (4) using Loctite 243 normal screwlock. 6 + 7 4 Adjust the belt tension using the frequency meter 126305: 5. Position the beam 500 mm ± 5 mm from the front bearing pulley shaft. 6. Position the frequency meter sensor close to the belt to be adjusted. 7. Tap the belt sharply using a small tool, then read the value indicated by the frequency meter. 8. Turn the screw (3) to tighten the belt until you obtain a value of 44 Hz using frequency meter 126305. 9. Tighten the locknut (1) against the tensioner flange. 2 1 3 10. Tighten the fastening screws (2), and then check the belt tension again. Adjust the beam squareness as per sheet M28. April 2015 - 543160 CA lectra.com 92/214 M25 Replacing X axis belt, gearbox or motor Vector® Index 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the belt, gearbox or motor. Tools: Standard tools. Normal Loctite 243 screwlock. Cleaning pouch Lectra code 124924. Torque wrench. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Remove the side cover (sheet M17) and the right side profile (sheet M19). - Remove the base cover as per the sheet M16. Dismantling procedure: 1. Disconnect the motor cables (1). 1 2. Gently unscrew the flange holding screws (2). 3. Push the motor upwards (3). 4. Remove the belt (4). 5. Finish unscrewing the screws (2) and then remove the motor unit. + 4 2 2 3 6. Remove the four screws (5) attaching the motor to the gearbox. 5 April 2015 - 543160 CA lectra.com 93/214 Replacing X axis belt, gearbox or motor M25 Index 1 Vector® Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets 7. Remove the cap, and then unscrew the screw (6) locking the motor axis. 8. Separate the motor and the reducer unit (7). 7 6 Replacement procedure: 1. Degrease the motor shaft using a 3M cleaning pouch, Lectra code 124924. 1 124924 2. Prepare the reducer unit (2): Position the slot in the ring (A) at 90° to the tightening screw (B). B 90° 2 A 3. Position the motor in the gearbox following the position of the cabling indicated in the photo (3) below. 3 April 2015 - 543160 CA lectra.com 94/214 Replacing X axis belt, gearbox or motor M25 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/3 4. Lock the four fastening screws (4) with Loctite 243 normal screwlock. 4 + 5. Tighten the screw (5) to a torque of 9.5 Nm using a torque wrench. 5 9.5 Nm 6. Put the cap back in place (6). 6 7. Put the motor back in position with Loctite 243 normal screwlock on the screws (7). 8. Put the belt back in place (8): - Hold the belt tensioned and at the same time tighten the four fastening screws. - Using a frequency meter, check the belt tension (8), which should be between 160 and 176 Hz. 8 7 + 9. Reconnect the motor power supply cables. 10. Fasten the side cover (sheet M17), the profile (sheet M19) and the bottom cover (sheet M16). An XY calibration must be performed. Launch the “XY calibration” assistant. April 2015 - 543160 CA lectra.com 95/214 M26 Replacing the X guide rails and sliders Vector® Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the X guide rails and sliders. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The beam covers are removed (sheet M27) and the side profiles are removed (sheet M19). Dismantling procedure: 1. Position the beam so that it is stopped against the fabric roller. 2. Place a block under each side of the beam. 3. Unscrew the 8 screws (1) fastening the beam to the sliders (on each side of the machine). 4. Place the beam on the blocks. 5. On each rail, using a screwdriver remove every other cap (2). 6. Remove the rail and its sliders on the right hand side by unscrewing the 17 fastening screws. Warning! When removing the screws, recover the shims (3) fastened between the rail and the frame, make a note of their values and mark their respective location. Warning! It is possible that there will be several shims on top of one another on a single screw. 7. Remove the other rail, which is not fitted with shims. 3 2 1 Screws tightened to 4.6 Nm Replacement procedure: 1. Put the right hand side rail (reference rail) in place: - Present the rail to the frame with the machined surface of the sliders facing upwards. - Put each shim or pile of shims back in its respective place. - Apply Loctite 243 normal screwlock to all the fastening screws. Tightened to 4.6 Nm 2. Replace the left hand rail in the same way, except for installing the shims. 3. Insert a new cap over each rail fastening screw. 4. Put the beam in position on the sliders and fasten it with Loctite 243 normal screwlock. Grease the slider and rail (see the “Greasing the X guide rails and sliders” sheet). Adjust the beam squareness as per sheet M28. April 2015 - 543160 CA lectra.com 96/214 Beam Removing the beam covers Vector® (iX and Q25 models) - Mechanical maintenance sheets M27 Indice 1 Page 1/1 Aim: To remove the beam covers. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: At each end of the beam: 1. Remove the screw (1). 2. Unclip the screw cover (2). 3. Remove the screw (3) under the screw cover. 2 3 1 4. On the other side of the cover remove screws (4) and (5). 5. Place the beam cover, still connected, on the slats. 4 5 6. Disconnect the emergency stop (6) and the keypad connector (7). 7. Remove the cover. 7 6 Replacement procedure: 1. Perform the replacement operations in the reverse order. April 2015 - 543160 CA lectra.com 97/214 M28 Beam squaring procedure Vector® Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/2 Aim: To square the beam. Tools: Standard tools. Lectra tool No. 131318 (not mandatory). Torque wrench. Lectra tool No. 131318 is not essential for the squaring procedure but it makes it easier to release/secure the interconnection hub. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Adjustment of the X belts has been performed. See the chapter “Adjusting the belt tension”, sheet M24. Launch the “Adjusting the beam squareness” assistant to define the correction to be made. Adjustment procedure: 1. Remove the side profiles (see sheet M19). 2. Remove the rubber stops (1) on the right and left rear mechanical stops (2). 3. To replace the rubber stops during the squareness adjustment: - fit 2 HM 5-16 screws with two nuts each (screw the bolts all the way to the end) (A), - put the 2 screws fitted with the bolts in the place of the rubber stops that have just been removed. 1 A 2 4. Hold the interconnection hub (3) using Lectra tool No. 131318 (4) then loosen the three screws (5) without removing them. 5. Take out the interconnection hub (3). 6. Hold one side of the beam firmly and push fairly hard on the other side to separate the two sides (do this in both directions). 3 4 April 2015 - 543160 CA 5 lectra.com 98/214 Beam squaring procedure M28 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 7. Bring the beam (6) up against the screws (A) and hold it there very firmly. Visually check the contact between the screws (A) and the beam trolleys. 6 Beam trolley A 6 8. Place the interconnection hub in its housing: - The screw heads should be flush with the bearing. - Check that the interconnection hub rotates freely without causing the shaft to turn (7). 9. Position Lectra tool No. 131318 (5) so that it is resting against the bearing surface (8). - The depth adjustment is determined by the tool. 10. Start by gradually tightening the three screws, and then with a torque wrench tighten the screws to a torque of 10 Nm. 7 5 8 10 Nm Check that there is no play between the beam and the gauges (A) using a set of feeler gauges. If there is any play, redo the adjustment. Warning: once the adjustment procedure is finished, do not forget to put the rubber stops back in their original place (before they were removed). 11. Reinstall the side profiles (see sheet M19). Continue following the instructions of the “Beam squaring” assistant. April 2015 - 543160 CA lectra.com 99/214 M29 Replacing and adjusting the Y axis belt Vector® Indice 1 Page 1/4 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove the Y axis belt. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The cutting head covers and the beam end cover on the left hand side are removed. Switch off the pneumatic supply Dismantling procedure: 1. On the left hand side of the head, remove the 2 fastening screws (1). 2. Remove the part (2). 1 2 1 3. On the right hand side of the head, loosen the 2 fastening screws (3). 3 3 April 2015 - 543160 CA lectra.com 100/214 Replacing and adjusting the Y axis belt M29 Indice 1 Vector® Page 2/4 (iX and Q25 models) - Mechanical maintenance sheets 4. Completely unscrew the tension screw (4). 5. Unscrew the 2 fastening screws (3) that were previously loosened. 6. Pull on the toothed belt to extract the belt flange (5). 4 5 7. On the left hand side of the beam, remove the fastening screws (6) from the belt flange. 8. Pull the toothed belt (7). 7 6 9. Remove the belt flanges (8) from each side of the belt. 10. Remove the belt by pulling it out (9). 9 8 April 2015 - 543160 CA lectra.com 101/214 Replacing and adjusting the Y axis belt M29 Indice 1 Vector® Page 3/4 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Thread the new belt into the beam (1). 1 2. Replace the belt flanges (2) on either side of the belt. 3. On the left hand side of the beam, put the belt flange in position and tighten the fastening screws (3). 2 3 4. On the right hand side put the belt flange in place under the head (4). 4 April 2015 - 543160 CA lectra.com 102/214 Replacing and adjusting the Y axis belt M29 Indice 1 Vector® Page 4/4 (iX and Q25 models) - Mechanical maintenance sheets 5. Screw in the 2 fastening screws (5) WITHOUT TIGHTENING. 5 5 6. Position the head so that the distance between the pulley shaft and the edge of one of the holding plates (6A) is 500mm ± 5mm. 7. Position the frequency meter sensor close to the belt to be adjusted (6B). 8. Tap the belt sharply using a small tool, and then read the value indicated by the frequency meter 126305; it should be 50 Hz ± 1 Hz. 6B 6A 5 0 0m m±5 mm 9. Tighten the tensioner (7) until the required value is obtained. 10. Lock the 2 fastening screws (5). Move the cutting head along the beam. Bring it back to the correct position for adjustment, then check the value once again using the frequency meter. 7 5 April 2015 - 543160 CA lectra.com 5 103/214 M30 Replacing the Y return pulley Vector® Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/1 Aim: To replace the pulley and/or the bearings of the Y drive pin. Tools: Standard tools. Loctite 222 normal screwlock. Seal. Bearing extractor. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Remove the left beam cover as per sheet M27. - Slacken and remove the left side of the belt as per sheet M29. Dismantling procedure: 1. Remove the two screws (1) in order to remove the Y return pulley. 1 Removed Y return pulley on the workbench: 2. Remove the screw (2). 3. Pull the pin (3) outwards to remove the pulley (4) and the washer (5). 4. Remove the bearings (6) using a small bearing extractor. 6 6 3 4 5 2 7 Replacement procedure: 1. Put the bearings (6) back into the pulley (4) using a press. 2. Put the pulley (4) and the washer (5) back into the clevis (7). Take care to install the washer in the position indicated in the diagram! 3. Insert the pin (3) through the clevis (7). 4. Fasten the pin (3) using the screw (2) glued with Loctite 222 screwlock. 5. Pass the belt through the clevis, and then fasten the assembly to the beam using the screws (1). 6. Adjust the tension as per sheet M29. 7. Re-fit the beam cover as per the sheet M27. April 2015 - 543160 CA lectra.com 104/214 Vector® M31 Replacing the Y drive motor Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/6 Aim: To replace the Y drive motor fitted with its pinion. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Remove the beam cover as per the sheet M27. - Remove the right side profile as per sheet M19. - Remove the right side panels as per sheet M17. Dismantling procedure: 1. Remove the two screws (1). 2. Take out the plastic cover (2). 2 1 3. Remove the eight fastening screws (3) from the cable holders (4 on each side). 4. Remove the two cable holders (4). 3 4 4 April 2015 - 543160 CA lectra.com 105/214 Replacing the Y drive motor M31 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/6 5. Cut the nylon tie (5). 6. Remove the connector (6). 7. Remove the bolt (7) and then the earth wire. 8. Remove the connector (8). 5 6 7 8 9. Pull the cables upwards (9). 9 9a 10. Pull the cables outwards (10). 10 April 2015 - 543160 CA 10a lectra.com 106/214 Replacing the Y drive motor M31 Index 1 Vector® Page 3/6 (iX and Q25 models) - Mechanical maintenance sheets 11. Unscrew the screw by 1 turn (11). 12. Unscrew the nut by 1 turn (12). 13. Unscrew the nuts by a few turns (13). 14. Turn the screw (14) to slacken the belt. 15. Take out the screw and the nut (12). 14 13 11 12 16. Remove the belt (15). 17. Hold the motor and then remove the remaining three screws (16). 15 16 18. Remove the motor (17). April 2015 - 543160 CA lectra.com 107/214 Replacing the Y drive motor M31 Index 1 Vector® Page 4/6 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Hold the motor in position and fasten it with the three screws (1) glued with Loctite 243 normal screwlock. 2. Put the belt (2) into position. Watch out for the position of the cables. 2 + 1 3. Screw but do not tighten the screw (3) glued with Loctite 243 normal screwlock. 4. Screw but do not tighten the screw and the nut (4). 5. Turn the screw (5) to tension the belt sufficiently for the teeth not to slip. 3 4 5 6. Lock the nuts (6). 7. Lock the screw and the nut (7). 8. Using a frequency meter, check the belt tension (2), which should be between 165 and 175 Hz. 6 7 April 2015 - 543160 CA lectra.com 108/214 Replacing the Y drive motor M31 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/6 9. Insert the cables inwards (8). 8 8a 10. Push the cables downwards (9). 9a 9 11. Connect the connector (10). 12. Fasten the connector with a plastic cable tie (11). 13. Fasten the earth wire with the nut (12). 14. Connect the connector (13). 11 12 April 2015 - 543160 CA 10 13 lectra.com 109/214 Replacing the Y drive motor M31 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 6/6 15. Fasten the two cable holders (14) with their 8 screws. Pay attention to the assembly direction of the cable holders. 14 14 16. Insert the plastic cover (15). 17. Tighten the two screws (16). 15 16 18. Reinstall the right side profile (see sheet M19). 19. Reinstall the right side panels (see sheet M17). Reinstall the beam cover (see sheet M27). An XY calibration must be performed. Launch the “XY calibration” assistant. April 2015 - 543160 CA lectra.com 110/214 Replacing the Y motor tensioner or transmission belt Vector® (iX and Q25 models) - Mechanical maintenance sheets M32 Index 1 Page 1/2 Aim: To replace the Y motor tensioner and/or transmission belt. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - Remove the right beam cover as per sheet M27. Dismantling procedure: 1. Unscrew the nuts by a few turns (1). 2. Turn the screw (2) to slacken the belt. 3. Remove the screw (3). 4. Remove the nut (4). 5. Remove the belt and the tensioner (5). 2 1 5 3 4 Replacement procedure: Put the tensioner back into its position. 1. Screw but do not tighten the screw (1) glued with Loctite 243 normal screwlock. 2. Screw but do not tighten the screw and the nut (2). 3. Put the belt (3) back into position starting with the motor pinion, followed by the sprocket wheel and then the roller. 4. Turn the screw (4) to tighten the belt. 3 1 2 April 2015 - 543160 CA 4 lectra.com 111/214 Replacing the Y motor tensioner or transmission belt M32 Index 1 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets 5. Lock the nuts (5). 6. Lock the screw and the nut (6). 5 6 7. Using a frequency meter, check the belt tension (3), which should be between 165 and 175 Hz. Reinstall the right beam cover as per sheet M27. An XY calibration must be performed. Launch the “XY calibration” assistant. April 2015 - 543160 CA lectra.com 112/214 M33 Removing the Y drive shaft and pulley Vector® Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove the Y drive axis. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The beam cover is removed (see sheet M27). Dismantling procedure: 1. Remove the belt (1) as per sheet M32. 2. Remove the 4 fastening screws (2) of the plate and remove it. 3. Remove the 2 fixing screws (3) of the bearing. 4. Remove the 4 fastening screws (4) of the toothed wheel and remove it. 5. Remove the shaft with its fittings (5). 3 4 + + 2 1 5 Replacement procedure: 1. Position the new shaft with its bearings in its housing. 2. Put some Loctite 222 weak screwlock on the fastening screws (2) and (3) and some Loctite 243 normal screwlock on the fastening screws (4). 3. Re-fit the belt according to the sheet M32. 4. Re-fit the beam cover as per the sheet M27. An XY calibration must be performed. Launch the “XY calibration” assistant. April 2015 - 543160 CA lectra.com 113/214 M34 Replacing the Y guide rails Vector® Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/1 Aim: Remove/replace the Y guide rails. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Remove the head according to the sheet M37. 2. Remove the beam covers as per the sheet M27. 3. Remove the belt according to the sheet M29. 4. Mark the positions (A and B) of the limit stops (1) on each side of the beam and remove them. 5. Remove the covers (2) and (3) by taking them out from the side of the beam. 6. Unscrew the 26 screws of the upper rail (4) and remove it. 7. Unscrew the 30 screws of the lower rail (5) and remove it. A 1 2 B 3 4 5 Replacement procedure: 1. Perform the assembly operations in the reverse order. An XY calibration must be performed. Launch the “XY calibration” assistant. April 2015 - 543160 CA lectra.com 114/214 Replacing the cutting head ball bearings Vector® (iX and Q25 models) - Mechanical maintenance sheets M35 Indice 1 Page 1/2 Aim: To replace the cutting head bearings. Tools: Standard tools. G10 grease. Loctite 222 weak screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The head is removed to a workbench (see sheet M37). Dismantling procedure: Ball bearings at the front of the head 1. Remove the 2 screws (1) fastening the ball bearings to the front of the head. WARNING! Use a BRAND NEW Allen wrench to remove screws glued with Loctite 222 screwlock. 1 Ball bearings at the rear of the head 2. Remove the 2 grease nipples (2) fastening the ball bearings to the rear of the head. 2 2 April 2015 - 543160 CA lectra.com 115/214 Replacing the cutting head ball bearings M35 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 Replacement procedure: Ball bearings at the rear of the head 1. Place the new ball bearings in their housings. - WARNING! Assembly of self-aligning ball bearings: these have a bump (see photo A) that standard ball bearings do not have. 2. Respect the position shown in diagram B. 3. Fasten the grease nipples (1). - WARNING! Apply some Loctite 222 weak screwlock only to the thread of the grease nipples. A + Self-aligning ball bearing 1 B YES NO Ball bearings at the front of the head 4. Place the new ball bearings in their housings. - ATTENTION: Fit standard ball bearings, without a bump (see photo C). - Respect the position shown in diagram D. 5. Fasten the screws (2). - WARNING! Apply Loctite 222 weak screwlock in the threaded holes and not to the screws. C Standard ball bearing 2 D + YES NO When the cutting head has been put back, the bearings must be greased (see sheet M2). April 2015 - 543160 CA lectra.com 116/214 Cutting head M36 Removing the head cover Vector® Indice 1 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove the head cover. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: Raise the front cover. 1. Remove the connector (1) and then cut the self-tightening collars (2) holding it in place. 2. Unscrew the screws (3). 3 1 3 2 3. Put the circuit board to one side and unscrew the screw (4). 4. Release the cover prop (5). 5. Unscrew the screws (6), remove the shaft (7) and remove the front cover. 7 5 4 April 2015 - 543160 CA 6 6 lectra.com 117/214 Removing the head cover M36 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 6. Unscrew the screw (8). 7. Unscrew the 3 screws (9). 9 8 8. Unscrew the 2 screws (10). 9. Remove the rear cover (11). 11 10 Replacement procedure: Perform the replacement operations in the reverse order. - Apply Loctite 222 screwlock to the screws (3) when reassembling the circuit board. 3 3 April 2015 - 543160 CA lectra.com 118/214 M37 Removing the cutting head Vector® Indice 1 Page 1/7 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove the cutting head. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The cutting head covers and the beam end cover on the left hand side are removed. Switch off the pneumatic supply. Dismantling procedure: 1. On the left hand side of the beam, remove the 4 fastening screws (1). 2. Allow the part (2) to hang, held by the wires. 1 2 3. On the left hand side of the head, remove the 2 fastening screws (3). 4. Remove the part (4). 3 4 3 April 2015 - 543160 CA lectra.com 119/214 Removing the cutting head M37 Indice 1 Vector® Page 2/7 (iX and Q25 models) - Mechanical maintenance sheets 5. On the right hand side of the head, disconnect the pneumatic tube (5) from the pneumatic fitting. 5 6. Unscrew the 2 fixing screws (6). 6 6 7. Completely unscrew the tension screw (7). 8. Pull on the toothed belt to extract the belt flange (8). 7 8 April 2015 - 543160 CA lectra.com 120/214 Removing the cutting head M37 Indice 1 Vector® Page 3/7 (iX and Q25 models) - Mechanical maintenance sheets 9. Disconnect the female connectors (9). 10. Release the male connectors (10): Remove the fastening screws (11), then screw them temporarily in their respective places. 11 9 10 11. Remove the connectors from the electronics board (12). 12 12 12 12. Remove the fastening screws (13). 13 April 2015 - 543160 CA 13 lectra.com 121/214 Removing the cutting head M37 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/7 13. Remove the fastening screws (14). 14 14 14. Remove the fastening screws of the earth wire (15). 15 15. Pull out the strip with all the wires disconnected (16). 16 April 2015 - 543160 CA lectra.com 122/214 Removing the cutting head M37 Indice 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/7 16. On the left hand side of the beam, remove the fastening screws (17) from the belt flange. 17 17. Pull the toothed belt (18) out and let it hang down (19). 18 19 18. Remove the last fastening screw (20) from the pulley. 19. Remove the pulley (21). 21 20 April 2015 - 543160 CA lectra.com 123/214 Removing the cutting head M37 Indice 1 Vector® Page 6/7 (iX and Q25 models) - Mechanical maintenance sheets 20. Slide the cutting head off gently (be careful that the balls from the ball bearings do not drop) to extract it from its rails (22). 21. Place the cutting head on a workbench. 22 Replacement procedure: 1. Gently slide the cutting head into its rails (22). - Be careful that the balls from the ball bearings do not fall out. 2. Reinstall the pulley (21). 3. Reinstall the toothed belt (18) and fasten it (17). 4. Put the strip, connectors and earth wires back in place (16), (15), (14), (13) and (12). 5. Take care with the position of connectors (9) and (10). Warning: BLUE markings at the top! 6. Put the toothed belt flange in place under the head (8). 8 April 2015 - 543160 CA lectra.com 124/214 Removing the cutting head M37 Indice 1 Vector® Page 7/7 (iX and Q25 models) - Mechanical maintenance sheets 7. Screw in the 2 fastening screws (6) WITHOUT TIGHTENING. 6 6 8. Position the head so that the distance between the pulley shaft and the edge of one of the holding plates (6B) is 500mm ± 5mm. 9. Position the frequency meter sensor close to the belt to be adjusted (6C). 10. Tap the belt sharply using a small tool, and then read the value indicated by the frequency meter 126305; it should be 50 Hz ± 1 Hz. 6C 6B 5 0 0m m±5 mm 11. Tighten the tensioner (7) until the required value is obtained. 12. Lock the 2 fastening screws (6). Move the cutting head along the beam. Bring it back to the correct position for adjustment, then check the value once again using the frequency meter. 7 6 6 April 2015 - 543160 CA lectra.com 125/214 Vibration assembly Vector® M38 Replacing the vibration motor Index 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/3 Aim: To replace the vibration motor. Tools: Standard tools. Lectra tool No. 129281. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Unscrew the screw (1) that fastens the jack to the motor plate. 2. Disconnect the cables (2) from the motor. 3. Remove the screw (3) (refer to sheet M5) and then the crank rod/blade holder assembly. 2 1 3 4. Remove the four screws (4) fastening the motor plate to the raising/lowering rail slider. Warning! Use an Allen wrench in very good condition. 4 April 2015 - 543160 CA lectra.com 126/214 Replacing the vibration motor M38 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/3 5. Extract the motor and the cables from the front (5). 5 5b 5c 6. Remove the four fastening screws (6) to separate the motor from its plate. 7. Unscrew the two screws (7) and then remove the crankshaft (8). 7 6 8 Replacement procedure: 1. Fasten the new motor to its plate, applying Loctite 243 screwlock to the screws (9). 2. Check that the cap is properly tightened (10). Make sure the cables are in the correct position. 9 + 10 April 2015 - 543160 CA lectra.com 127/214 Replacing the vibration motor M38 Index 1 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets 3. Assemble the two parts of the crankshaft (11), applying Loctite 243 normal screwlock to the screws (12) but without tightening them. 4. Fix Lectra tool No. 129281 (13) to the crankshaft using the crank rod fastening screw. (Tighten by hand, not using a tool.) Face the supports towards the crankshaft. 12 11 + 13 Face the boss towards the tool. 5. Place the tool supports in contact against the motor plate (14). 14 6. Lock the two crankshaft screws by passing an Allen wrench through the holes (15). 15 7. Fasten the motor to the slider using the four screws (4) glued using Loctite 243 normal screwlock. 8. Connect the motor cables (2). 9. Fasten the screw (1) that fixes the jack to the motor plate using Loctite 243 screwlock. 10. Install the crank rod/blade holder assembly with the screw (3) as per sheet M5. The “Vibration break-in” assistant must be run. April 2015 - 543160 CA lectra.com 128/214 Replacing the vibration unit raising/lowering jack Vector® (iX and Q25 models) - Mechanical maintenance sheets M39 Indice 1 Page 1/1 Aim: To replace the vibration unit raising/lowering jack. Tools: Standard tools, Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Remove the head cover as per the sheet M36. 2. Put the vibration unit in the lowered position and remove the screw (1). 3. Mark the locations of the position sensors (2) on the jack. 4. Unscrew the screws (3) and remove the position sensors. 5. Disconnect the jack’s pneumatic Snap-on connectors (4). 6. Take out the nut (5) and remove the jack. 5 4 2 3 4 + 1 Replacement procedure: 1. Perform the replacement operations in the reverse order. 2. Apply Loctite 243 normal screwlock to the fastening screws (1). 3. Set the position of the sensors by referring to the dimensions (2) taken before removal. April 2015 - 543160 CA lectra.com 129/214 Replacing the blade raising/lowering assembly guide rail and slider L Vector® M40 Indice 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Tools: Standard tools. Lectra tool No. 129281. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The head covers are removed. Dismantling procedure: 1. Unscrew the screw (1) that fastens the jack to the motor plate. 2. Disconnect the cables (2) from the motor. 3. Remove the screw (3) (refer to sheet M5) and then the crank rod/blade holder assembly. 2 1 3 4. Remove the four screws (4) fastening the motor plate to the raising/lowering rail slider. Warning! Use an Allen wrench in very good condition. 5. Extract the motor from the front (5). + 5 April 2015 - 543160 CA 4 lectra.com 130/214 Replacing the blade raising/lowering assembly guide rail and slider L Vector® M40 Indice 1 Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets 6. Using a small screwdriver, remove the two plugs (7) from the guide rail (8). 7. Remove the two guide rail fastening screws under the plugs. 8. Remove the guide rail. 7 8 7 Replacement procedure: 1. Put the new guide rail in position following the instructions in view (9). - Fasten the screws glued with Loctite 243 normal screwlock. - Put caps on the screws. 2. Put the new guide slider in position on its rail following the instructions in view (9B). 9B The grease nipple should be on this side. + The rough, printed face of the slider should be on this side. 9 Position the rail so it is resting on the heel April 2015 - 543160 CA lectra.com 131/214 Replacing the blade raising/lowering assembly guide rail and slider L Vector® (iX and Q25 models) - Mechanical maintenance sheets M40 Indice 1 Page 3/3 3. Fasten the vibration motor to the slider with its screws (10). - Place a 2 mm-thick shim under the motor to ensure the motor is horizontal before tightening the screws. - Lock the screws. - Remove the shim. Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 2mm shim 10 4. Connect the motor cables. 5. Fasten the screw that fixes the jack to the motor plate using Loctite 243 screwlock. 6. Install the crank rod/blade holder assembly with the screw (4) as per sheet M5. Grease the slider and the rail. (See the “Greasing the blade raising/lowering assembly rail and slider” sheet.) April 2015 - 543160 CA lectra.com 132/214 Blade rotation assembly Removing the presser foot, replacing the diabolo/fork and the bearing Vector® (iX and Q25 models) - Mechanical maintenance sheets M41 Indice 1 Page 1/3 Aim: To remove the diabolo/fork, to remove the presser foot and to replace the diabolo bearing. To remove the presser foot: - either remove 3 slats from the conveyor, - or remove the cutting head. The recommended course of action is to remove 3 slats, unless other actions require the cutting head to be removed. Tools: Standard tools. One press. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1 of the “Safety instructions” chapter. Dismantling procedure: Remove the complete diabolo/fork Some old versions of the presser foot have a circlip at the top, which must be taken off to remove the diabolo. 1. Using a flat wrench on the flattened part (1), hold the jack shaft in place. 2. Unscrew the part (2) to remove the complete diabolo. 1 2 Remove the presser foot 3. Remove 3 slats as per sheet M21. 4. Position the cutting head above the space cleared by removing the slats while holding the presser foot (because it is not fixed it will fall if it is not held). 5. Remove the presser foot from underneath. April 2015 - 543160 CA lectra.com 133/214 Removing the presser foot, replacing the diabolo/fork and the bearing Vector® (iX and Q25 models) - Mechanical maintenance sheets M41 Indice 1 Page 2/3 Remove the bearing The latest version of the presser foot shown below is factory-assembled as follows: The bearing (4) is inserted into the diabolo (3) using a press, but is not glued in place. The part (2) is inserted freely into the bearing (4) and is not glued. 6. Clamp the diabolo (3) in a vice, but not too tightly, and then tap on the bearing to extract it using a tool and a hammer. 4 2 3 Replacement procedure: Installing the new bearing 1. Using a press, insert the new bearing as far as it will go (5) into the diabolo. 5 5 Reinstalling the presser foot 2. Reinstall the presser foot by placing the cutting head above the space cleared by removing the slats. 3. While holding the presser foot, move the cutting head over the cutting bed. 4. Reinstall the 3 slats as per sheet M21. April 2015 - 543160 CA lectra.com 134/214 Removing the presser foot, replacing the diabolo/fork and the bearing Vector® (iX and Q25 models) - Mechanical maintenance sheets M41 Indice 1 Page 3/3 Reinstall the complete diabolo/fork on the presser foot 5. Apply Loctite 243 screwlock to the threads of parts (2) and (6). 6. Place the diabolo with fittings on the jack shaft. 7. Screw part (2) to the jack shaft without tightening. 6 2 8. Put the presser foot in the up position (7). 9. Manually push the sharpener arms into the sharpening position (8) to check that they do not touch the presser foot (8). 10. If the arms touch the presser foot, adjust the height of the diabolo on the jack shaft. - Hold the jack using a flat wrench on its flattened part. - Using a socket wrench, unscrew part (2) to lower the presser foot. 11. Check that the sharpener arms no longer touch the presser foot. 12. Hold the jack using a flat wrench on its flattened part and then lock part (2). 7 8 8B April 2015 - 543160 CA lectra.com 135/214 M42 Replacing the blade rotation motor with fittings Vector® Index 1 Page 1/4 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the motor fitted with its pinion (because the pinion is glued to the motor, it is not supplied separately). Tools: Standard tools. Set of six-sided wrench. Normal Loctite 243 screwlock. G17 grease, Lectra code 131937. Initial state: Standard initial state, described in paragraph 1 of the “Safety instructions” chapter. The cutting head covers are removed. The blade holder is removed as per sheet M5. The vibration has to be removed to adjust the rotation motor when it is being reinstalled. Dismantling procedure: 1. Remove the screw (1) fastening the cables. 2. Take out the six screws (2) then remove the stiffener (3). 2 3 1 2 2 3. Unscrew the screw (4) that fastens the jack to the motor plate. 4. Disconnect the cables (5) from the vibration motor. 5. Remove the screw (6) (refer to sheet M5) and then the crank rod/blade holder assembly. 5 4 6 April 2015 - 543160 CA lectra.com 136/214 Replacing the blade rotation motor with fittings M42 Index 1 Vector® Page 2/4 (iX and Q25 models) - Mechanical maintenance sheets 6. Remove the four screws (7) fastening the motor plate to the raising/lowering rail slider. Warning! Use an Allen wrench in very good condition. 7. Extract the motor from the front (8). 8 7 8. If the head is fitted with a heat drill, remove the screws (9). 9. Position the heat drill to one side to remove screw (10). 10. Remove screws (10) and (11) and screw (12) beside the rotation motor. 11. Remove the protective plate (13). 12 9 9 13 10 11 12. Remove the four screws (14) from the satellite (15). 14 April 2015 - 543160 CA 15 lectra.com 137/214 Replacing the blade rotation motor with fittings M42 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/4 13. Disconnect the motor cables (16) and (17). 17 16 14. Remove the 2 screws (18) securing the motor. 15. Remove the motor (19) from above. 18 18 Replacement procedure: 1. Apply G17 grease to the motor pinion (1). G17 1 2. Put the motor back into position, applying Loctite 243 normal screwlock to the screws (2). 2 April 2015 - 543160 CA 2 + lectra.com 138/214 Replacing the blade rotation motor with fittings M42 Index 1 Vector® Page 4/4 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Grease the satellite with G17 grease before reassembling. 2. Position the satellite with its screws in contact without tightening them. 3. Adjust the satellite: The satellite/sprocket wheel/motor pinion must rotate without stiffness. 4. Tighten the screws (1) in a cross. 1 Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. G17 5. Fasten the protective plate with its screws (2). Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 2 2 2 6. Fasten the vibration motor to the slider with its screws (3). - Place a 2 mm-thick shim under the motor to ensure the motor is horizontal before tightening the screws. - Lock the screws and remove the shim. Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 2mm shim 3 7. Connect the motor cables. 8. Fasten the screw that fixes the jack to the motor plate using Loctite 243 screwlock. 9. Install the crank rod/blade holder assembly with its screw as per sheet M5. April 2015 - 543160 CA lectra.com 139/214 M43 Replacing the rotation motor satellite Vector® Index 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the satellite. Tools: Standard tools. Set of six-sided wrench. Normal Loctite 243 screwlock. G17 grease, Lectra code 131937. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The cutting head covers are removed. The blade holder is removed as per sheet M5. The vibration motor has to be removed in order to access and adjust the satellite. Dismantling procedure: 1. Remove the screw (1) fastening the cables. 2. Take out the six screws (2) then remove the stiffener (3). 2 3 1 2 2 3. Unscrew the screw (4) that fastens the jack to the motor plate. 4. Disconnect the cables (5) from the vibration motor. 5. Remove the screw (6) (refer to sheet M5) and then the crank rod/blade holder assembly. 5 4 6 April 2015 - 543160 CA lectra.com 140/214 Replacing the rotation motor satellite M43 Index 1 Vector® Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets 6. Remove the four screws (7) fastening the motor plate to the raising/lowering rail slider. Warning! Use an Allen wrench in very good condition. 7. Extract the motor from the front (8). 8 7 8. If the head is fitted with a heat drill, remove the screws (9). 9. Position the heat drill to one side to remove screw (10). 10. Remove screws (10) and (11) and screw (12) beside the rotation motor. 11. Remove the protective plate (13). 12 9 9 13 10 11 12. Remove the four screws (14) and then the satellite (15). 14 April 2015 - 543160 CA 15 lectra.com 141/214 Replacing the rotation motor satellite M43 Index 1 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Grease the satellite with G17 grease before reassembling. 2. Position the satellite with its screws in contact without tightening them. 3. Adjust the satellite: The satellite/sprocket wheel/motor pinion must rotate without stiffness. 4. Tighten the screws (1) in a cross. 1 Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. G17 5. Fasten the protective plate with its screws (2). Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 2 2 2 6. Fasten the vibration motor to the slider with its screws (3). - Place a 2 mm-thick shim under the motor to ensure the motor is horizontal before tightening the screws. - Lock the screws and remove the shim. Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 2mm shim 3 7. Connect the motor cables. 8. Fasten the screw that fixes the jack to the motor plate using Loctite 243 screwlock. 9. Install the crank rod/blade holder assembly with its screw as per sheet M5. April 2015 - 543160 CA lectra.com 142/214 Replacing the presser foot raising/lowering jack Vector® (iX and Q25 models) - Mechanical maintenance sheets M44 Indice 1 Page 1/1 Aim: To replace the presser foot raising/lowering jack. Tools: Standard tools, Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The head is removed. Dismantling procedure: 1. Remove the presser foot as per the sheet M41. 2. Mark the location of the jack position sensor (1) and then remove it. 3. Disconnect the jack’s pneumatic Snap-on connectors (2). 4. Take out the fastening nut (3) holding the jack in place and remove it. 2 1 + 3 Replacement procedure: 1. Perform the replacement operations in the reverse order. 2. Adjust the position of sensors by referring to the dimensions (1) taken before removing. 3. Apply Loctite 243 normal screwlock to the nut (3). April 2015 - 543160 CA lectra.com 143/214 M45 Removing the presser foot revolving support Vector® Index 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove the presser foot revolving support. Tools: Standard tools. Normal Loctite 243 screwlock. G17 grease, Lectra code 131937. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The presser foot is removed as per sheet M41. - The blade holder is removed as per sheet M5. Dismantling procedure: 1. If the head is fitted with a heat drill, remove the screws (1). 2. Position the heat drill to one side to remove screw (2). 3. Remove screws (2) and (3) and screw (4) beside the rotation motor. 4. Remove the protective plate (5). 4 1 5 2 1 3 5. Remove the four screws (6) from the satellite (7). 6. Remove the four screws (8). 7. Remove the sprocket wheel (9). 8. Remove the screws (10) and then remove the revolving support (11) from below. 10 6 10 10 7 8 9 11 April 2015 - 543160 CA lectra.com 144/214 Removing the presser foot revolving support M45 Index 1 Vector® Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Apply G10 grease to the outside of the bearing (1). 1 G10 2. Position the presser foot support in its housing: - Apply Loctite 243 normal screwlock to the thread of the three screws (2). - Gradually, and in order (1, 2, 3) screw in the screws (2). - Leave a 1.5 mm gap between the revolving support and the head structure (3). 2 3 1.5 mm April 2015 - 543160 CA lectra.com 145/214 Removing the presser foot revolving support M45 Index 1 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets 3. Grease the sprocket wheel with G17 grease before assembling. 4. Put the greased sprocket wheel (4) into position and fasten it. Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. G17 + 4 5. Grease the satellite with G17 grease before assembling. 6. Position the satellite with its screws in contact without tightening them. 7. Adjust the satellite: The satellite/sprocket wheel/motor pinion must rotate without stiffness. 8. Tighten the screws (5) in a cross. 5 Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. G17 9. Fasten the protective plate with its screws (6). Warning! Apply Loctite 243 normal screwlock in the threaded holes and not to the thread of the screws. Wipe away the surplus. 6 6 6 10. Fasten the heat drill and structural reinforcement with Loctite 243 normal screwlock. 11. Reinstall the blade holder as per sheet M5. 12. Reinstall the presser foot as per sheet M41. A blade zero adjustment must be performed. Launch the “Adjusting blade zero” assistant. April 2015 - 543160 CA lectra.com 146/214 Replacing the bearing or shank of the presser foot support Vector® (iX and Q25 models) - Mechanical maintenance sheets M46 Index 1 Page 1/2 Aim: To replace the bearing or the other parts if necessary. The bearing is assembled in the factory using a press, but is not glued. Tools: Standard tools. Loctite 243 normal screwlock. Loctite 222 weak screwlock. One bearing extractor. One press. Installation tools, Lectra code 131249. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. - The presser foot is removed as per sheet M41. - The presser foot support is removed as per sheet M45. Dismantling procedure: 1. Take the two screws out of the central blade guide (1) and then remove it. 2. Remove the four screws from the holding plate (2) and remove the plate. 1 2 3. Remove the blade guide shank (3). 3 4. Place the extractor arms (4) on the plate (5), protecting the plate. 5. Take out the bearing plate assembly (6). 4 5 April 2015 - 543160 CA 6 lectra.com 147/214 Replacing the bearing or shank of the presser foot support Vector® M46 Index 1 Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets 6. By hand, remove the bearing from the plate (7). 7 Replacement procedure: 1. Place the new bearing (1) in the plate (2). 2. Place the revolving support on the press (3). Warning! The jack of the press should press at least on the inner ring (A) of the bearing (if possible use the tool Lectra code 131249). 3. Press the bearing as far as it will go against the shoulder (B) of the revolving support. 131249 1 A B 2 3 4. Install the shank (4): Make sure the notches (5) are positioned correctly. 5. Fasten the holding plate (6) with Loctite 243 normal screwlock on the screws. 6. Fasten the central blade guide (7) with Loctite 243 normal screwlock on the screws. 5 + 6 4 7 A blade zero adjustment must be performed. Launch the “Adjusting blade zero” assistant. April 2015 - 543160 CA lectra.com 148/214 Replacing the wear parts of the C-Kit removable module or the standard removable module Vector® M47 Indice 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the worn parts of the C-Kit removable module or the standard removable module. To check the condition of the presser foot rim and/or replace it. Tools: - Tools 112135 and 112136 for reinstalling the needle bearings. - Needle bearing fitting/removal press 112170. Pin punch. - G1 KLÜBER Isoflex NBU 15 grease. Normal Loctite 243 screwlock. Initial state: The equipment is switched off; the head can remain on the machine. The blade is removed. Removal procedure for the C-Kit removable module: 1. Remove the removable module from the presser foot: - Push the cam out to release the removable module, then press the module downwards to extract it. Place the module on a workbench: replacing the rear roller, bushing, shaft and guide sliders. 2. Remove the shaft (1) by punching it out with a pin punch. 3. Remove the roller and its bushing (2). 4. Loosen the flange screws (3) and then remove the guide sliders (4). 4 2 4 3 1 Removal procedure for the C-Kit removable module: 1. Position the roller and its fittings (2) in the module, then insert the new shaft (1). 2. Position the new guide sliders (4) inside their housing so that they do not obstruct the passage of the blade. 3. Fasten the slider flanges (3) with screws glued with Loctite 243 normal screwlock. 4. Put the module back into its housing. April 2015 - 543160 CA lectra.com 149/214 Replacing the wear parts of the C-Kit removable module or the standard removable module Vector® M47 Indice 1 Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets Removal procedure for the removable module: 1. Remove the removable module from the presser foot: - Push the tab outwards to release the removable module, then press the module downwards to extract it. Place the module on a workbench: replacing the side rollers, the rear roller and their shafts and needle bearings. 2. Remove the shafts (1) by pushing their heads out of the module with a small screwdriver and then with a pair of needle-nose pliers. 3. Remove the rollers (2) fitted with their bushings. 4. Using a pin punch, tap on the shaft (3) to extract it from the module with the first bushing (4). 5. Take the rear roller (5) out of the module. 6. Reinstall the shaft and drive it in the other direction to extract the second bushing (4). 2 5 4 3 1 4 Reinstallation procedure for the removable module: 1. Put the new side rollers (2) in the module, then insert the shafts (1). 2. Install the new rear roller supplied in the kit: Lightly grease the bushings (4). -Place the first bushing on the tip of tool 112136 and slide it into the module. -Position the rear roller in its housing and thread the shaft (5) into the module from the opposite side to the bushing, through the roller and the bushing. -Insert the second bushing in the same way as the first, until tool 112136 meets the shaft. -Then, using tool 112135, tap until the bushing is fully inserted. 3. Reinstall the module in the presser foot. April 2015 - 543160 CA lectra.com 150/214 Replacing the wear parts of the C-Kit removable module or the standard removable module Vector® (iX and Q25 models) - Mechanical maintenance sheets M47 Indice 1 Page 3/3 Presser foot rim removal procedure: 1. Take advantage of work being done on the presser foot to check the wear of the presser foot rim. New rim Old rim 0.5 mm 2. If necessary, replace the rim after removing the 3 screws (6). 6 Presser foot rim reinstallation procedure: 1. Apply Loctite 243 normal screwlock to the rim fastening screws when reassembling. 2. After reinstallation, check the adjustment of the intermediate guide. April 2015 - 543160 CA lectra.com 151/214 Replacing the wear parts of the presser foot lower guide Vector® M48 Indice 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the wear parts of the presser foot lower guide. To check the condition of the presser foot rim and/or replace it. Tools: - Tools 112135 and 112136 for reinstalling the needle bearings. - Pin punch. - G1 KLÜBER Isoflex NBU 15 grease. Normal Loctite 243 screwlock. Loctite 222 weak screwlock. Initial state: The equipment is switched off; the head can remain on the machine. The blade is removed. Dismantling procedure: 1. Unscrew the two play adjustment screws (1). 2. Unscrew the four screws (2). 3. Take out the removable module. 1 2 1 Place the module on a workbench. 4. Drive out the shaft (3) using a pin punch, retrieve the rear roller (4) and the bushing. 5. Refit the shaft and perform the same operation in the other direction to retrieve the second bushing. 6. Remove the two shafts (5) by driving them out with a pin punch. 7. Retrieve the side rollers (6). G1 6 4 3 5 April 2015 - 543160 CA lectra.com 152/214 Replacing the wear parts of the presser foot lower guide Vector® M48 Indice 1 Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: Grease the new bushings with G1 grease before installing them. Hold the bearing holder (1) in a vice on the side on which force is to be applied to prevent it becoming misshapen. Alternatively, a wedge can be placed between the 2 sections of the bearing holder. Wedge Support or 1. Install one new rear roller fitted with 2 new bushings and a new shaft, supplied in the kit: Bushing replacement tools: Grease the new bushings (4) with G1 grease before installing them. Place the first bushing on the tip of tool 112136 and slide it into the bearing holder. Position the rear roller (6) in its housing and thread the shaft (5) into the bearing holder on the opposite side to the bushing, through the roller and the bushing. Insert the second bushing in the same way as the first, until tool 112136 meets the shaft. Then, using tool 112135, tap until the bushing is fully inserted. Refit the 2 side rollers (3): G1 4 4 7 G1 1 2 3 6 5 4 April 2015 - 543160 CA lectra.com 153/214 Replacing the wear parts of the presser foot lower guide Vector® (iX and Q25 models) - Mechanical maintenance sheets M48 Indice 1 Page 3/3 During 1000-hour maintenance, use the new rollers supplied in the Level 2 kit. They already have the bushings fitted. - Fit 2 new side rollers, then install 2 new shafts (2). Fit the complete bearing holder and remove play between the blade and the side rollers: Install the complete bearing holder in the presser foot cup without the 4 mounting screws (7). Install a blade and make it pass through the presser foot. Insert one thickness of paper either side of the blade, between the blade and the side roller. Tighten the 2 screws (8) symmetrically to remove play until there is resistance when the blade is raised/lowered. - Lock the 4 screws (7). Check that tightening them has not altered the adjustment: the blade should slide freely between the rollers. 8 8 Presser foot rim removal procedure: 1. Take advantage of work being done on the presser foot to check the wear of the presser foot rim. 2. If necessary, replace the rim after removing the 3 screws (9). New rim Old rim 9 0.5 mm Presser foot rim reinstallation procedure: 1. Apply Loctite 243 normal screwlock to the rim fastening screws when reassembling. 2. After reinstallation, check the adjustment of the intermediate guide. April 2015 - 543160 CA lectra.com 154/214 Replacing the intermediate blade guide Vector® (iX and Q25 models) - Mechanical maintenance sheets M49 Indice 1 Page 1/1 Aim: To replace the intermediate blade guide. Tools: Standard tools - Loctite 222 weak screwlock - Cutting blade. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The blade is removed. Dismantling procedure: 1. Unscrew the 2 screws (1). 2. Remove the intermediate blade guide. + 1 Replacement procedure: 1. Put Loctite 222 screwlock on the screws (1) and then screw them in without tightening them. 2. Position a blade in the blade holder. Check that the unit guide passes between the two sharpening belts. 3. Lock the screws (1). April 2015 - 543160 CA lectra.com 155/214 Sharpening Operating principle of the sharpening system Vector® (iX and Q25 models) - Mechanical maintenance sheets M50 Index 1 Page 1/2 Sharpener's operations - Sharpening is done through two sanding belts fitted on a pivoting arm. - The tension of each sanding belt is adjusted by a loose pulley associated with a compression spring. - The sharpening arm is placed in front of the blade through a jack controlled reciprocally. - The sharpening pressure is managed by the pressure and flow adjuster. Sharpening is only possible when the blade is in up position and at a specific angular value in relation to the blade zero. This value is determined by configuring the micro plotter program. Sharpening principle - Pressure 1 is the pressure exerted by the arm when the blade is in position 1 and the sharpening direction is negative (-). - Pressure 2 is the pressure exerted by the arm when the blade is in position 2 and the sharpening direction is positive (+). 75° 75° _ 1 Sharpening half-rotation po tio si n 138° Median sharpening angle 2 po sitio n + April 2015 - 543160 CA lectra.com 156/214 Operating principle of the sharpening system M50 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 Sharpening cycles The sharpening cycles are performed during empty movements. Their number and their duration can be programmed by the user. The vibration speed used during a sharpening cycle is different from the speed used for cutting (configurable from the microprogram ª 3000 rpm). To ensure that the sharpening is correct, the motor's rotation direction must correspond to the direction indicated previously for positions 1 and 2 of the blade. Breakdown of a sharpening cycle A single sharpening cycle (Sharpening Parameter Number = 1) is broken down into six separate steps: 1. Rotation of the blade in position 1. 2. Rotation of the sharpener arm and rotation of belts in the “Sharpening -” direction. 3. Sharpener return. 4. Rotation of the blade in position 2. 5. Rotation of the sharpener and rotation of belts in the “Sharpening +” direction. 6. Sharpener return. April 2015 - 543160 CA lectra.com 157/214 M51 Adjusting the sharpening symmetry Vector® Indice 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To adjust the sharpening symmetry. To check (with the felt-tip pen test) and adjust the sharpening symmetry to ensure the two sharpening belts make proper contact with both sides of the blade. Tools: No tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Procedure: 1. Launch the “Adjusting the sharpening angles” assistant. 2. Visually check the blade condition. 3. Follow the instructions of the “Adjusting the sharpening angles” assistant. Diagram below: Red color on the blade = felt pen erased. Asymmetric sharpening => Adjust the median angle. Reduce the median sharpening angle Increase the median sharpening angle Felt-pen test Spot viewfinder Spot viewfinder Symmetrical sharpening => Adjust the half-rotation. Reduce the sharpening half-rotation Increase the sharpening half-rotation Spot viewfinder Spot viewfinder Sharpening OK! Spot viewfinder April 2015 - 543160 CA lectra.com 158/214 Checking the sharpening quality Vector® (iX and Q25 models) - Mechanical maintenance sheets M52 Indice 1 Page 1/1 Aim: To apply a method for monitoring the sharpening quality. Tools: Kitchen string. It is necessary to check the blade in place so as not to break the cutting edge. (Risk of contact between the rotating block and the blade when it is being reinstalled.) Check that the blade cutting edge is not bent. If it is, then check the median sharpening angle (see M51 sheet). Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Procedure: 1. Normally perform a material cutting cycle then, when it is finished, perform the following check: 2. Place the presser foot in the raised position. 3. Place the blade in the lowered position. 4. Take a piece of the string and then perform a cutting test on: - The upper part of the blade (photo 1). - The lower part of the blade (photo 2). Test procedure: - Hold the two ends of the string. - Apply this against the blade. - Push horizontally. Note: The string should be cut without effort. 1 2 If the quality of the sharpening is not homogenous between the top and bottom of the blade, change the blade penetration adjustment (See M57 sheet) April 2015 - 543160 CA lectra.com 159/214 Sharpening M53 Replacing the sharpener jack Vector® Indice 2 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the sharpener jack kit. Tools: Standard tools. Loctite 243 normal screwlock. Loctite 222 weak screwlock. Loctite 577 sealant. Hot air gun. Initial state: Standard initial state described in paragraph 1. of the "Safety instructions" chapter. It is possible, but difficult, to replace the sharpener jack kit with the head still installed on the beam. Performing this operation with the head on a workbench or partially removed and laid on one side is recommended. Removal procedure: 1. Remove the screws and washer (1) fastening the jack; do not lose the nut (1B). 1B 1 2. Pull out the tube (2) using a pair of needle-nose pliers. Putting identifying marks on the tubes before removal is recommended. 3. Turn the pneumatic nozzle (3) so it is pointing downwards. 4. Depending on the model, remove the nut or fastening screw (4) using a ratchet wrench fitted with an extension. 2 3 4 5. Pull out the tube (5). 6. Remove the worn jack kit (6). 6 5 April 2015 - 543160 CA lectra.com 160/214 Replacing the sharpener jack M53 Indice 2 Vector® Page 2/3 (iX and Q25 models) - Mechanical maintenance sheets 7. Remove the 2 screws (7). 8. Unscrew the pneumatic connector (8) and (9). The base of the jack is glued into the part (10) using Loctite 577 sealant. 9. Heat the part (10) with a hot air gun, and then remove the jack. 10 7 9 8 Replacement procedure: Reinstalling the jack: Clean and degrease the threads of the pneumatic connectors and the base of the jack. Make sure the Loctite does not get into the jack or its connectors, otherwise it will not work. 1. Lightly coat the threads of the pneumatic connectors (1) and (2) with Loctite 577 sealant. 2. Screw the pneumatic connectors (1) and (2) to the jack and the fitting. 3. Lightly coat the base of the jack (3) with Loctite 577 sealant. 4. Insert the jack base (3) into the fitting. 5. Screw up and lock the screws coated with Loctite 222 weak screwlock. 6. Thoroughly degrease the thread on the ball joint (A), apply Loctite 243 weak screwlock to the thread on the jack, then screw in as far as it will go. 1 3 A 2 7. Insert the pneumatic tube into its connector (4). 4 April 2015 - 543160 CA lectra.com 4 161/214 Replacing the sharpener jack M53 Indice 2 Vector® Page 3/3 (iX and Q25 models) - Mechanical maintenance sheets 8. Position the jack fitting (5) on the stud (6) (or by means of its screw, depending on the version). - Warning! Check that the washer is present (7). - The fitting has two fastening holes (B). Whether the upper or lower hole should be used depends on the sharpener version. However, the jack should always be positioned horizontally, parallel to the head plate (8). 6 7 8 B 5 9. Depending on the model, fasten the nut or the fastening screw (9) with a ratchet wrench and extension. 10. Position the pneumatic nozzle (10) so that it is pointing upwards. 11. Put the tube back (11) using a pair of needle-nose pliers. 10 11 9 12. Fasten the jack to the sharpening module (12); do not forget to put the washer back in place. 12 13. Operate the jack by hand and check that there is no stiffness. 14. Switch on the pneumatic supply and perform a sharpener test. April 2015 - 543160 CA lectra.com 162/214 Vector® M54 Replacing the sharpening arms Indice 1 (iX and Q25 models) - Mechanical maintenance sheets Page 1/1 Tools: Standard tools. Set of six-sided wrench. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. This operation can be performed with the head in place or with the sharpener removed. Remove the sharpening belts by pressing on each arm. Dismantling procedure: 1. Unscrew the screw and the stop plate (1). 2. Remove the sharpening arms (2). 1 2 Replacement procedure: 1. Position the arms fitted with their springs in their housings (3). 3 Warning! Make sure they are in the position shown in the photo. 2. Keep the arms (4) pressed in. 3. Fasten the stop plate using its screw glued with Loctite 243 normal screwlock. Make sure the notches (5) are in the correct position. 4 5 5 Check that the arms slide smoothly in their housings. 4. Reinstall the sharpening belts (please refer to the operator guide if necessary). April 2015 - 543160 CA lectra.com 163/214 M55 Replacing the sharpening motor or pulley Vector® Index 2 Page 1/2 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace the arms, arm support or sharpening module. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state described in paragraph 1. of the "Safety instructions" chapter. - Remove the cutting blade as per sheet M5. - Remove the sharpening belts (please refer to the operator guide). Removal procedure: Removing the sharpening arms: 1. Take out the screw (1), then remove the part (2) and the arms (3). Removing the arm support: 2. Take out the 2 screws (4) then remove the arms (5). 4 2 1 5 3 Removing the motor assembly: 3. Disconnect the motor power supply cable (6). 6 April 2015 - 543160 CA lectra.com 164/214 Replacing the sharpening motor or pulley M55 Index 2 Vector® Page 2/2 (iX and Q25 models) - Mechanical maintenance sheets 4. Remove the screws and washer (7) fastening the jack; do not lose the nut (7B). 5. Remove the lower fastening nut (8) from each position sensor (9). 6. Remove the sensors (9). 7. Unscrew the 2 fastening screws (10) from the sharpening module while supporting it. 8. Remove the sharpening module. 7B 10 10 7 9 8 Replacement procedure: 1. Perform the dismantling operations in reverse order. 2. Apply Loctite 243 normal screwlock to the screws (1) and (10). 3. Adjust the sensor play to 1 mm using a feeler gauge between the sensor and the screw head, then lock the half nuts. 1mm 4. Perform the adjustment described on sheet M51. April 2015 - 543160 CA lectra.com 165/214 Adjusting the blade Vector® Replacing the conical stops (iX and Q25 models) - Mechanical maintenance sheets M56 Indice 1 Page 1/1 Aim: To replace them. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: The photo shows a molded head but the procedure is the same for a machined head. 1. Position the motor with its fittings at mid-height. 2. Remove the nut (1) and then the upper conical stop. 3. Remove the nut (2) and then the lower conical stop. 1 3 2 5 mm Replacement procedure: 1. Reinstall the upper conical stop (1). 2. Adjust the lower conical stop (2) to a measurement of 5 mm. If a drill is being added, fasten the angle mount of the lower stop (2) into the hole (3). Because the fastening screw is on the same side as the motor, the motor and its plate have to be removed (please see sheet M5). 3. Adjust the blade penetration as per sheet M57. April 2015 - 543160 CA lectra.com 166/214 M57 Adjusting the blade penetration Vector® Indice 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To prevent damage to the cutting bed conveyor blocks (blade too low) and to prevent poor cutting of the lower plies (blade too high). Tools: Standard tools, Pencil – Rule. Initial state: The head is in place on the machine. A new blade is fitted. The cover is open. Blade is adjusted to zero position. The control cabinet is switched on, control part only. Adjustment: 1. Place a polyethylene sheet and set the vacuum to maximum. Move the cutting head to the center of the cutting area. 2. Close the air inlet. 3. Open the head cover. 4. Turn the crankshaft by hand to position the blade at top dead center. 5. Raise the presser foot and, with the pencil, mark a line on the blade tangent with the rule placed on the cutting bed, as shown in the figure below. 6. Remove the blade and check that dimension A is 1 mm. To see the measurement, a spacer of a corresponding thickness can be placed beside the blade. Direction of movement A Rule Blocks + polyethylene sheet 7. If required, adjust the position of the vibration box lower conical limit stops. 8. Check the position of the blade bottom position detector. Adjust it if necessary, until the diode lights up. If the blade penetrates too far into the bed, this will cause premature deterioration of the bristle blocks and cause cutting quality problems in the lower plies. April 2015 - 543160 CA lectra.com 167/214 M58 Adjusting the blade zero Vector® Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To perform a blade zero adjustment. Tools: Lectra tool No. 131424 (gauge of dia. 3mm, length 50mm). Initial state: The cutting head is in place on the cutter and all connections are made. Place the machine head on the operator side before making the adjustment. Adjustment procedure: 1. Enter the machine “Maintenance” session. 2. Access the “Machine adjustment” function. 3. Start the “Blade zero adjustment” assistant. 4. Follow the procedure described in the assistant, up to the “Fitting the tool” chapter. 5. Open the head cover. 6. Insert Lectra tool 131424 (2) into the hole (1) on the underside of the bob. 7. Rotate the bob until the tool slots into the groove (3) in the base plate. When the tool is engaged the angular position of the blade is 180°: the blade cutting edge is oriented along -X. 8. Follow the procedure described in the assistant until the operations to be performed are completed. 1 3 2 1 April 2015 - 543160 CA lectra.com 168/214 Pneumatic drills Vector® M59 Removing the hot needle drill Index 1 Page 1/1 (iX and Q25 models) - Mechanical maintenance sheets Aim: To remove or replace the hot needle drill. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Open the head cover. 2. Disconnect the electrical connections (1) of the motor and the heating resistance. 3. Mark the positions (A and B) of the cylinder sensors and remove them. 4. Disconnect the pneumatic clip-on connectors (2) of the cylinder. A 2 B 1 5. Unscrew the two fixing screws (3). 6. Remove the heating drill. 3 Replacement procedure: Perform the replacement operations in the reverse order. April 2015 - 543160 CA lectra.com 169/214 Removing the drill drive belt and the presser foot shafts Vector® (iX and Q25 models) - Mechanical maintenance sheets M60 Index 1 Page 1/4 Aim: To remove the drill drive belt and the presser foot shafts. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The drill unit is removed. The photos show a double drill but the procedure is the same for a single drill. Dismantling procedure: 1. Remove the adjustment screw (1) and the fastening screw (2). 1 2 2. Disengage the drill (3) and the belt (4). 4 3 April 2015 - 543160 CA lectra.com 170/214 Removing the drill drive belt and the presser foot shafts M60 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/4 3. Unscrew the two shaft fastening screws (5). 5 5 4. Remove the presser foot (6) and the belt (7). 6 7 5. Take out the screws (8) to remove the shafts. 8 8 April 2015 - 543160 CA lectra.com 171/214 Removing the drill drive belt and the presser foot shafts M60 Index 1 Vector® Page 3/4 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Fasten the shafts to the presser foot, applying Loctite 222 weak screwlock to the screws (1). 1 1 2. Position the springs (2) and the belt (3) as shown below. 3 2 2 3. Fasten the two fastening screws (4) of the shafts with Loctite 222 weak screwlock. 4 4 April 2015 - 543160 CA lectra.com 172/214 Removing the drill drive belt and the presser foot shafts M60 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/4 4. Install the belt on the drill (5). 5 5. Install and fasten the drill on its support: - apply Loctite 243 normal screwlock to the screws (5), - install the screws, - tension the belt and lock the screws. 5 5 April 2015 - 543160 CA lectra.com 173/214 Removing the drill raising/lowering jack Vector® (iX and Q25 models) - Mechanical maintenance sheets M61 Index 1 Page 1/3 Aim: To remove/replace the drill jack. Tools: Standard tools. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. The drill unit is removed. The photos show a double drill but the procedure is the same for a single drill. Dismantling procedure: 1. Disconnect the pneumatic tubes (1). 2. Make a note of the height and position of the position sensors (2) and (3). 1 2 3 1 April 2015 - 543160 CA lectra.com 174/214 Removing the drill raising/lowering jack M61 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/3 3. Remove the nut (4) and then (5). 4. Remove the jack. 5. Take the screw (5) out of each sensor to remove the sensors. 5 6 4 Replacement procedure: 1. Place the sensors on the new jack. - Refer to the height measurements recorded previously. - Place the sensors and the pneumatic connectors at the correct angle on the jack (see photo below). Jack connector axis 25°to 30° Top jack sensor axis 90° Top jack sensor axis 30°to 35° 90° View from above April 2015 - 543160 CA lectra.com 175/214 Removing the drill raising/lowering jack M61 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/3 2. Fasten the jack with its nut (1). 3. Fasten the nut (2) using Loctite 243 normal screwlock. 1 2 4. Connect the pneumatic tubes. 5. Perform a drilling depth adjustment as per sheet M62. April 2015 - 543160 CA lectra.com 176/214 M62 Adjusting the drilling depth Vector® Index 1 Page 1/3 (iX and Q25 models) - Mechanical maintenance sheets Aim: To avoid damage to the cutting bed blocks. Tools: No. 5 and No. 10 flat fork wrenches. Felt-tip pen. LOCTITE 222 screwlock. Initial state: The machine is in working order. The two head covers are removed. The blade is removed. - If the head is fitted with two drills, you must adjust both of them. - The photos used in the procedures described below are of a vacuum drill and a heat drill. However, checking and adjustment is exactly the same for a standard drill. Adjustment procedure: Check the drilling depth: 1. Fit a needle or punch to the drill tool holder (1). 2. Cover the cutting bed with paper and film (2). 3. Set the vaccum to maximum (3). 4. Position the head in the center of the cutting bed (4). 1 2 3 4 5. Use the manual control to lower the tool (needle or punch) into the cutting bed (5). 5 6. Manually raise the presser foot (6). 7. Make a mark on the tool with a felt-tip pen (7) as shown in the photo below. 7 6 April 2015 - 543160 CA lectra.com 177/214 Adjusting the drilling depth M62 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/3 8. Position the head on one side of the machine to make it easier to perform the check (8). 9. Use the manual control to raise the tool (9) (needle or punch). 10. Manually raise the presser foot (10). 11. Measure the cylindrical part of the tool which was buried in the cutting bed (11). Check that the measurement taken is within the tolerances given below. Warning! There are different measurements for different tools: 8 9 11 10 Punch Needle Min. 2mm Max. 6mm Approx. 2mm Section Section Adjustment procedure Adjusting the drilling depth: Case 1: The drill or needle goes too far into the cutting bed 1. Set the air supply switch to 0. 2. Hold the part (1) with a No. 10 flat wrench and unscrew the nut (2) by a few turns. 3. Using a No. 5 flat wrench on the flat section (3) screw the jack shaft a few turns into the part (1) which is still being held. 4. Hold the part (1) and lock the nut (2). 3 2 1 5. Set the air supply switch to 1. Perform another depth check and adjust if necessary. April 2015 - 543160 CA lectra.com 178/214 Adjusting the drilling depth M62 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/3 Case 2: The drill or needle does not go far enough into the cutting bed 6. Set the air supply switch to 0. 7. Hold the part (5) with a No. 10 flat wrench and unscrew the nut (6) by a few turns. 8. Using a No. 5 flat wrench on the flat section (7) unscrew the jack shaft by a few turns out of the part (5) which is still being held. 9. Hold the part (5) and lock the nut (6). 7 6 5 10. Set the air supply switch to 1. Perform another depth check and adjust if necessary. Safety setting: To avoid injury, setting the needle or drill height so that it does not go beyond the presser foot is recommended. 11. Remove one of the two screws (8). 12. Apply Loctite 222 weak screwlock to this screw and then put it back in place with its washer. 13. Remove the other screw and perform the same operation as for the first. 14. Turn the two screws until the point of the tool has gone 1 mm back into the presser foot. 15. Allow the screwlock to dry on the screws for a few moments. 8 1mm April 2015 - 543160 CA lectra.com 179/214 Punch maintenance and sharpening Vector® (iX and Q25 models) - Mechanical maintenance sheets M63 Index 1 Page 1/1 Aim: To avoid breaking the punches and to ensure their effectiveness, check their condition every week and determine whether sharpening is required. Tools: A sharpening grinding mill. Initial state: The punches are removed (see operator sheet). Procedure: A worn punch must have a minimum length of 70mm, below which it should not be used. Using a punch that is not sharp could cause its destruction. The procedure described in this sheet is valid for all punches, whether Teflon-coated or not, and for all diameters. 1. Using a grinding mill, sharpen the cutting edge of the punch at an angle of 15°. New punch: 73 mm ± 0.5 mm. Worn punch: Minimum size 70 mm. 15° Maximum 3 mm of wear after several sharpenings. 2. After sharpening, check that there are no burrs inside the punch. 3. Replace the punch in the drill (see operator sheet). April 2015 - 543160 CA lectra.com 180/214 Cameras, detectors Replacing the spot V2 camera assembly for Drill1 Vector® (iX and Q25 models) - Mechanical maintenance sheets M64 Index 1 Page 1/6 Aim: To replace spot V2 camera assembly for Drill1. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Disconnect the cable (1) from connector (2). 2 1 2. Extract the cable (1) then cut the collars (3). 1 3 1 April 2015 - 543160 CA 3 lectra.com 181/214 Replacing the spot V2 camera assembly for Drill1 M64 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/6 3. Cut the collars (4) to free the ferrite (5). 5 4 4. Unscrew the screws (6) which fix the camera (7) and the plate (8). 7 7 8 8 6 6 April 2015 - 543160 CA lectra.com 182/214 Replacing the spot V2 camera assembly for Drill1 M64 Index 1 Vector® Page 3/6 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Open kit 705770 (1). 2. Disconnect the element (1) which holds the camera cable. 1 3. Fix the label (2) from the camera cable using a self-tightening collar (3). 2 3 Trim the surplus self-tightening collar and reposition it so that the next operator cannot catch it. This is also true for the rest of the procedure. 4. Screw the camera assembly (4) to the plate (5) using the screws (6). 4 4 5 5 + 6 6 Apply Loctite 243 normal screwlock to the screws. April 2015 - 543160 CA lectra.com 183/214 Replacing the spot V2 camera assembly for Drill1 M64 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/6 5. Fold the cable (7) to fix the ferrite (8) using self-tightening collars (9). 7 9 8 6. Bind the different cables and the camera assembly cable (7) using self-tightening collars (10) and then pass the cable as shown below. 7 10 7 April 2015 - 543160 CA 10 lectra.com 184/214 Replacing the spot V2 camera assembly for Drill1 M64 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/6 7. Position the cable (7) as shown below and bind it with the other cables using self-tightening collars (11). 11 7 11 12 The photo (12) shows the pinched assembly of the system around the axis with the washer. 8. Connect the cable (7) from the camera assembly to the connector (13). 7 13 N.B.: Below is a plan listing the different USB ports and their associated labels. April 2015 - 543160 CA lectra.com 185/214 Replacing the spot V2 camera assembly for Drill1 M64 Index 1 Vector® April 2015 - 543160 CA (iX and Q25 models) - Mechanical maintenance sheets lectra.com Page 6/6 186/214 Replacing the spot V2 camera assembly for Drill2 Vector® (iX and Q25 models) - Mechanical maintenance sheets M65 Index 1 Page 1/7 Aim: To replace it. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Disconnect the cable (1) from connector (2). 2 1 2. Extract the cable (1) then cut the collars (3). 3 1 April 2015 - 543160 CA 3 lectra.com 187/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® Page 2/7 (iX and Q25 models) - Mechanical maintenance sheets 3. Extract the cable (1) from the other side of the system then cut the collars (4). 4 1 1 1 1 4 1 4. Cut the collars (5) to free the ferrite (6). 6 5 April 2015 - 543160 CA lectra.com 188/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/7 5. Unscrew the screws (7) which fix the camera (12) and the plate (9). 8 8 9 9 7 7 April 2015 - 543160 CA lectra.com 189/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® Page 4/7 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure: 1. Open kit 705770 (1). 2. Disconnect the element (1) which holds the camera cable. 1 3. Fix the label (2) from the camera cable using a self-tightening collar (3). 2 3 Trim the surplus self-tightening collar and reposition it so that the next operator cannot catch it. This is also true for the rest of the procedure. 4. Fix the camera assembly (4) to the plate (5) using the screws (6). 4 4 5 + 5 6 6 Apply Loctite 243 normal screwlock to the screws. April 2015 - 543160 CA lectra.com 190/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® Page 5/7 (iX and Q25 models) - Mechanical maintenance sheets 5. Fold the cable (7) to fix the ferrite (8) using self-tightening collars (9). 8 9 7 6. Bind the different cables and the camera assembly cable (7) using self-tightening collars (10) and then pass the cable as shown below. 7 7 7 10 7 10 7 April 2015 - 543160 CA lectra.com 191/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 6/7 7. Pull out the cable (7) as shown below and bind it with the other cables using self-tightening collars (11). 11 7 11 12 The photo (12) shows the pinched assembly of the system around the axis with the washer. 8. Connect the cable (7) from the camera assembly to the plug (13). 13 7 N.B.: Below is a plan listing the different USB ports and their associated labels. April 2015 - 543160 CA lectra.com 192/214 Replacing the spot V2 camera assembly for Drill2 M65 Index 1 Vector® April 2015 - 543160 CA (iX and Q25 models) - Mechanical maintenance sheets lectra.com Page 7/7 193/214 Replacing the spot V2 camera assembly for DHEAT Vector® M66 Index 1 Page 1/5 (iX and Q25 models) - Mechanical maintenance sheets Aim: To replace it. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: 1. Disconnect the cable (1) from connector (2). 2 1 2. Extract the cable (1) then cut the collars (4). 1 1 4 1 April 2015 - 543160 CA lectra.com 194/214 Replacing the spot V2 camera assembly for DHEAT M66 Index 1 Vector® Page 2/5 (iX and Q25 models) - Mechanical maintenance sheets 3. Cut the collars (5) to free the ferrite (6). 5 6 5 6 or The ferrite can be positioned in different locations. The recommended position is behind the camera. 4. Unscrew the screws (7) which fix the camera (12) and the plate (9). 9 9 7 8 7 Replacement procedure: 1. Open kit 705770 (1). 2. Disconnect the element (1) which holds the camera cable. 1 April 2015 - 543160 CA lectra.com 195/214 Replacing the spot V2 camera assembly for DHEAT M66 Index 1 Vector® Page 3/5 (iX and Q25 models) - Mechanical maintenance sheets 3. Fix the label (2) from the camera cable using a self-tightening collar (3). 2 3 Trim the surplus self-tightening collar and reposition it so that the next operator cannot catch it. This is also true for the rest of the procedure. 4. Fix the camera assembly (1) to the plate (2) using the screws (3). 2 1 1 2 + 3 3 Apply Loctite 243 normal screwlock to the screws. 5. Fold the cable (4) to fix the ferrite (5) using self-tightening collars (6). 5 6 6 5 or 4 4 The ferrite can be positioned in different locations (see dismantling) but should be positioned behind the camera assembly. April 2015 - 543160 CA lectra.com 196/214 Replacing the spot V2 camera assembly for DHEAT M66 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/5 6. Bind the different cables and the camera assembly cable (4) using self-tightening collars (7) and then pass the cable (4) as shown below. 7 4 7 4 7 4 4 7. Connect the cable (4) from the camera assembly to the connector (8). 8 April 2015 - 543160 CA 4 lectra.com 197/214 Replacing the spot V2 camera assembly for DHEAT M66 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/5 N.B.: Below is a plan listing the different USB ports and their associated labels. April 2015 - 543160 CA lectra.com 198/214 Replacing the blade breakage detector Vector® (iX and Q25 models) - Mechanical maintenance sheets M67 Index 1 Page 1/5 Aim: To replace the blade breakage detector. Tools: Standard tools. Loctite 243 normal screwlock. Initial state: Standard initial state, described in paragraph 1. of the “Safety instructions” chapter. Dismantling procedure: Because of the inaccessibility of the blade breakage detector suitable tools are required. Below is a suggestion of tools to use: - (1) No. 6 Allen wrench with handle, (2) modified No. 6 Allen wrench (a slot of approx. 1cm has been cut in the end), (3) No. 6 Allen wrench with spherical head end, (4) No. 6 Allen wrench, spherical head end. 2 1 4 3 There are 2 detector types: SICK (5) and BANNER (6). In the rest of the procedure we will use the SICK kit. The procedure is similar with the BANNER kit. 5 SICK BANNER 6 5 6 April 2015 - 543160 CA lectra.com 199/214 Replacing the blade breakage detector M67 Index 1 Vector® Page 2/5 (iX and Q25 models) - Mechanical maintenance sheets 1. Remove the connector (7) located at J19 on the head board (8). 7 8 7 2. Cut the collar which connects the assembled unit cable to the switch/cover interface (9). 9 5 9 3. Remove the screws (10) which connect the plate (11) to the detector (5). The holes (12) are intended to fix the BANNER detector (the plate remains the same). 11 10 12 5 4. Disconnect the plug from the detector (9). April 2015 - 543160 CA lectra.com 200/214 Replacing the blade breakage detector M67 Index 1 Vector® Page 3/5 (iX and Q25 models) - Mechanical maintenance sheets Replacement procedure There are 2 types of detector: SICK and BANNER. In the rest of the procedure we will use the SICK kit. The procedure is similar with the BANNER kit. 1. Cut the new detector cable. - It is delivered with a length of 2000mm and must be cut to 450mm. 2. Strip the wires. 3. Fix the stripped wires to the connectors (7). 7 4. Install the detector on the plate (8) using the screws (9). - The holes (10) are intended to fix the BANNER detector (the plate remains the same). 8 10 9 + Apply Loctite 243 normal screwlock to the screws. For the BANNER detector, the holes used to fix the plate/detector assembly are oblong holes. These elements must be adjusted during assembly. 10 April 2015 - 543160 CA lectra.com 201/214 Replacing the blade breakage detector M67 Index 1 Vector® Page 4/5 (iX and Q25 models) - Mechanical maintenance sheets 5. Connect the cable on the assembled unit to the switch/cover interface (11) using a self-tightening collar. 11 5 11 6. Fix the connector (7) to location J19 on the card (12). 7 12 7 7. Adjust the beam reaching the blade. For the SICK detector: Use the 2 potentiometers. The potentiometer (13) sets the length of the beam and potentiometer (14) sets the lighting intensity of the beam. When the adjustment is correct, the yellow light (beam length) and the green light (power supply) are constantly lit. 14 13 For the BANNER detector: Use the potentiometer. This potentiometer (15) adjusts the beam sensitivity. When the adjustment is correct, the yellow light (sensitivity) and the green light (power supply) are constantly lit. 15 The plate, shown in these photos, is not an accurate representation (photo not binding). April 2015 - 543160 CA lectra.com 202/214 Replacing the blade breakage detector M67 Index 1 Vector® Page 5/5 (iX and Q25 models) - Mechanical maintenance sheets 8. The point (16) must be visible on the blade (17) which must be in the bottom position. - It must be located 3mm from the tip of the blade. 21 20 April 2015 - 543160 CA 0.12in lectra.com 203/214 Adjusting the blade breakage detection sensor Vector® (iX and Q25 models) - Mechanical maintenance sheets M68 Index 1 Page 1/2 Presentation: Blade breakage detection is carried out by a SICK® photoelectric detector. A light beam is emitted by the sensor which bounces off the blade. The sensor output signal is digital, it is 0 in the absence of beam return and switches to 1 when the beam is received. The sensor is connected to the head board on connector A16-J19. Operating principle: The “Blade breakage detection” function on the Vector iX,Q25 is carried out in a binary manner. The detection cycle operates in a blade rotation and vibration position. We recommend carrying out sensor adjustments using a carbide blade which has a smaller operating margin than steel blades. Initial state: The machine is switched on. Adjustment procedure: 1. Adjust the blade bottom point following the instructions in the “Blade bottom point calibration” assistant in the “Machine adjustment” box. 2. Select the “Blade breakage detection” function on the “Machine control” tab. 3. Run a blade breakage detection cycle. - The blade is then in the correct rotation position for detection. - The beam impact point must be in the center of the blade and approximately 15 mm from the point. April 2015 - 543160 CA lectra.com 204/214 Adjusting the blade breakage detection sensor M68 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/2 - The “Blade breakage detector” light must be lit. - If the light does not turn on, adjust the beam length potentiometer in order to obtain a return signal, rotate clockwise. The orange light comes on. Beam length potentiometer The cursor must always be on “L” 4. Lift the blade so that the beam passes under it: the light should go out. - If this does not happen, the length of the beam is too long and can reflect on the presser foot. - Reduce the length of the beam using the potentiometer on the sensor by rotating in a trigonometric direction. April 2015 - 543160 CA lectra.com 205/214 Adjusting the spread height sensor Vector® (iX and Q25 models) - Mechanical maintenance sheets M69 Index 1 Page 1/4 Presentation: The purpose of the spread height sensor is to calculate the height of the spread by using the position of the presser foot. The presser foot jack receives a SICK® brand sensor. It detects the position of the jack piston by magnetism. The output information is analog and varies between 0 and 10 V. This sensor connects to the head board with reference A8-J26. Operating principle: • The “Blade breakage detection” function operates using a square signal. • It operates in a blade rotation position and carried out a vibration. • The function checks the point of the blade. • Each time the blade passes through the beam the sensor state changes in “CMachine”, and it is this state variation frequency which is measured according to vibration speed. Initial state: The machine is switched on. Fitting for the first time and initializing the sensor: 1. In the top position, move the sensor until the detection light (1) turns on. 2. Action the presser foot control and check that the light (1) is still on. - If the light switches off, reposition the sensor so that the light (1) stays on through the jack’s range of use. 3. Once the sensor is in place, tighten the locking collar(s). 1 April 2015 - 543160 CA lectra.com 206/214 Adjusting the spread height sensor M69 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/4 4. Initialize the sensor: - In the top position, hold the button (2) until the light (1) flashes. - Release the button. 2 1 - Lower the presser foot to the center of the cutting area by depressing 100% and press the button (2) again. - The light becomes continuous, the sensor is initialized. April 2015 - 543160 CA lectra.com 207/214 Adjusting the spread height sensor M69 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/4 Reinitializing the sensor Once the sensor has been moved, it is necessary to initialize it again. The sensor retains the previously saved initialization in memory; this calibration inhibits a part of the maximum sensor utilization range. Because of this, when you test the presser foot jack detection over its full path, the orange light will extinguish. 1. Initialize the sensor: - In the top position, hold the button until the light flashes. - Release the button. - If the light flashes twice as quickly, this means that the sensor has not detected anything opposite in this position. Adjust the sensor height until the light flashes at a normal frequency. - Lower the presser foot to the center of the cutting area by depressing 100% and press the button again. - The light becomes continuous, the sensor is initialized. - If the light flashes twice as quickly, this means that the sensor has not detected anything opposite in this position. Sensor initialization has failed. The sensor retains the previous calibration value. Adjust the sensor height and repeat the procedure from the start. Calibrating the sensor 1. Run the spread height sensor to obtain the sensor range. 2. Follow the assistant instructions. April 2015 - 543160 CA lectra.com 208/214 Adjusting the spread height sensor M69 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/4 3. Once the assistant has finished, check the settings using a block of a known height. 4. Measure the block using the “Measure spread height” key. 5. Also check the height measured when the presser foot is in the upper position, it must be equal to the height defined by the machine characteristics. 6. Check that the measurement carried out on the conveyor is equal to 0 mm. Example of poor sensor adjustment: Case 1: In this example the sensor is installed too high. When the sensor is initialized, in the lower presser foot position, the light will go out indicating that it cannot detect the presser foot jack. If the correct settings are retained and the sensor is moved too high, the measurement value will not become negative and no alert will signal that the piston is outside the maximum sensor value. Case 2: In this example the sensor is installed too low. At the start of sensor initialization the light, which should flash, flashes twice as fast indicating that the piston cannot be seen by the sensor. If the correct settings are retained and the sensor is moved too low, the measurement value will not go beyond the maximum spread value and no alert will signal that the piston is outside the maximum sensor value. April 2015 - 543160 CA lectra.com 209/214 Adjustment of zero positioning camera Vector® (iX and Q25 models) - Mechanical maintenance sheets M70 Index 1 Page 1/5 Presentation: The zero positioning camera function is carried out using a Microsoft® brand webcam. It is located at the front of the cutting head on most Vectors. Only Vector iX9 “Drill 4” is equipped with two webcams which are located on the sides of the barrel. The webcam is connected to the USB card on the cutting head using A57-JB3 and A57-JB4 for the second webcam. The USB cable which supplies power to the machine hub must be connected to one of the USB ports on the facade of the CPU, which cannot control the webcams and the touch screen on the same hub. Initial state: The machine is switched on. Adjustment procedure: Calibration of this function is carried out by an assistant: “Adjustment of zero positioning camera”. WARNING! In the webcam properties, you must check that the “Truecolor” function is deactivated. 1. Carry out a first adjustment in order to obtain the sharpest possible image. 2. Orient the camera image in order for the image to be moved corresponding to the directional arrows on the control panel. 3. Move on to the next step. April 2015 - 543160 CA lectra.com 210/214 Adjustment of zero positioning camera M70 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 2/5 4. Carry out sensing on the measured area. 5. Enter the total green rectangle width and height measurements into the corresponding boxes. In this step, carry out measurements on the conveyor (spread height = 0 mm). April 2015 - 543160 CA lectra.com 211/214 Adjustment of zero positioning camera M70 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 3/5 6. Move on to the next step and carry out the same operation as above but on the highest possible spread height. April 2015 - 543160 CA lectra.com 212/214 Adjustment of zero positioning camera M70 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 4/5 7. Move on to the next step. - This step involves selecting the point of interest. - This calibration will be used during the spread positioning process in “Vector Pilot”, the spread corners will appear in the center of the target. - To move the target drag the stylus across the screen to the desired position. - If you accidentally press the screen, causing the target position to move, it is possible to return to the previously saved position by pressing the - The key. key lets you place the target in the center of the image. 8. When you press the button to move to the next step, a window appears inviting you to calibrate the camera offset. - It is possible to skip this step if the calibration has already been carried out and does not need to be modified. - If not UP, validate the command. April 2015 - 543160 CA lectra.com 213/214 Adjustment of zero positioning camera M70 Index 1 Vector® (iX and Q25 models) - Mechanical maintenance sheets Page 5/5 9. Vector will carry out a cut. - By dragging the stylus, superimpose the green cross with the cut. - You can refine your adjustments using the cursors on the right of the assistant. In the case of a Vector iX9 “Drill 4” carry out the same operation for the second webcam. April 2015 - 543160 CA lectra.com 214/214