Subido por Juanpi78 Bautista

Take-off 2

Anuncio
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off Equipment Installation Instruction
Cascade
When complete setting out the line on Take-off leg area, could start this installation better to wait until plant shut down
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Cascade
AJ40
1
10% assembled,90% site installation
~5Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 -6 installers
Column fitting
Roller assembly and fit with angel steel,fit with V belt
Belt fitting with tension device
Belt support and walking plat fitting
Take-off leg Installation Instruction
1 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and tensioning of this equipment,touch up when installation complete
Take-off leg Installation Instruction
2 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Transition belt
When complete setting out the line on Take-off leg area,and marking with all footprint
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Transition belt
AJ46-010CPB
1
20% assembled,80% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 installers
Frame fitting
Pulley with shaft assembly and fit into frame
Belt fitting with tension device
Belt support and walking plat fitting
Anchor bolt drilling and equipment leveling
Take-off leg Installation Instruction
3 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Touch up when installation complete
Take-off leg Installation Instruction
4 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Cross conveyor 2#
When complete Transition belt installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Cross conveyor 2#
AJ46-020COB/COR/LFT
1
10% assembled,90% site installation
~3Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,tackles
4 -6 installers
Frame connection
Roller assembly and fit with timing belt&timing belt pulley,tensioner
Lifting frame
Belt support and walking plat fitting
Stop bar frame fitting
Motors(3 Pcs) fitting
Pneumatic pipe connection from stop bar cylinders to pneumatic box
Take-off leg Installation Instruction
5 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Take-off leg Installation Instruction
6 / 58
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Instruction
Reject roller
When complete Cross conveyor 2# installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Reject roller
AJ49-010COR
1
10% assembled,90% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2-4 installers
Frame fitting
Roller assembly and fit with frame
Lifting screw fitting
Driven belt fitting
Guiding wheel(2 sets) fitting
Take-off leg Installation Instruction
7 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
8 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Touch up and fasten all connection parts,leveling,drilling etc.
Accumulator
When complete Cross conveyor 2# installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Accumulator
AJ50-010COB
1
10% assembled,90% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 -6 installers
Frame connection
Belt fitting with tension device
Belt support and walking plat fitting
Take-off leg Installation Instruction
9 / 58
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
10 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Booker
When complete Accumulator installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Booker
AJ51-010COB
1
20% assembled,80% site installation
~3Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 -6 installers
Frame connection
Booking motor with base fitting
Booking arms fitting,with booking shafts
Belt support and walking plat fitting
Driven shaft with belt wheel
Belt tension device fitting
Non-drive belt wheel fitting
Take-off leg Installation Instruction
58
11 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
12 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Cross conveyor 3#
When complete Booker installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Cross conveyor 3#
AJ52-010COB/COR/LFT
1
90% assembled,10% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2-3 installers
Equipment position and fitting
Motor fitting
All lose part fasten
Belt tension alignment
Pneumatic pipe connection from stop bar cylinders to pneumatic box
Take-off leg Installation Instruction
58
13 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
14 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and anchor bolt fitting
Steeling roller
When complete Cross conveyor 3# installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Steeling roller
AJ52-020COR
1
90% assembled,10% site installation
~1Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2 installers
Equipment position and fitting with anchor bolt
Motor connection
Take-off leg Installation Instruction
58
15 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Take-off leg Installation Instruction
58
16 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Refeed table with hydraulic station
When complete Steeling roller installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Refeed table with hydraulic station
AJ52-020LFT
1
90% assembled,10% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2 installers
Equipment position and fitting with anchor bolt
Hydraulic pipe connection
Take-off leg Installation Instruction
58
17 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Take-off leg Installation Instruction
58
18 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Bundler feeder
When complete Cross conveyor 3# installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Bundler feeder
AJ53-010COB
1
90% assembled,10% site installation
~4Ton(includes over bridge)
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Cross bridge fitting
Take-off leg Installation Instruction
58
19 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
20 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: The bridge over the belt conveyor could fit when full Take-off area installation completed
The bridge needs site connection as it will be dismounted into pieces
Leveling and touch up when installation complete
Bundler
When complete Bundler feeder installation
Equipment Name
Take-off leg Installation Instruction
58
Bundler
21 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
AJ54-SAW
1
70% assembled,30% site installation
~9Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4-6 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Fixed beam will all assembled parts
Movable beam will all assembled parts
Bottom frame with width adjustment rail
Centre beams (2 units)
Taping units(2 units)
Motors
Saw hoods(2 units)
Other guards
Other lose parts fitting
Take-off leg Installation Instruction
58
22 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
23 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Pneumatic pipes connection from cylinders to pneumatic box
Leveling and touch up when installation complete
A detailed instruction will be provided to guide local team as it is a critical equipment among equipment
Mini-stacker feeder
When complete Bundler installation
Equipment Name
GMT Tag number
LS Number
Take-off leg Installation Instruction
58
Mini-stacker feeder
AJ55-010
24 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
1
90% assembled,10% site installation
~1Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Motors
Take-off leg Installation Instruction
58
25 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
26 /
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Instruction
 Note: Leveling and touch up when installation complete
Mini-stacker
When complete Mini-stacker feeder installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Mini-stacker
AJ56-010
1
80% assembled,20% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Motors
Pneumatic pipe connection from cylinder to pneumatic box
Take-off leg Installation Instruction
58
27 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
28 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Stacker feeder
When complete Mini-stacker installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Stacker feeder
AJ57-010
1
90% assembled,20% site installation
~1Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
2 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Motors
Pneumatic pipe connection from cylinder to pneumatic box
Take-off leg Installation Instruction
58
29 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
30 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Leveling and touch up when installation complete
Stacker with Chain conveyor
When complete Stacker feeder installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Stacker with Chain conveyor
AJ58-010LFT/COC
2
90% assembled,20% site installation
~4Ton
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 installers
Equipment position and fitting with anchor bolt
Leveling and tensioning
Motors
Hydraulic pipe connection from stacker to hydraulic station
Take-off leg Installation Instruction
58
31 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
32 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
33 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Check the pit dimension and position whether is in line with layout
Leveling and touch up when installation complete
Position frame
When complete Stacker installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Take-off leg Installation Instruction
58
Position frame
AJ58-020
1
50% assembled,50% site installation
~3Ton
34 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Mobile Tool
Tool
Team
Foundation Layout
General installation
Fork lift,Crane(if forklift does not allow lifting)
Hydraulic car,drill set,spanner,hammer,
4 installers
Equipment frame position and fitting with anchor bolt
Leveling and tensioning
Motors
Pneumatic pipe connection from cylinder to pneumatic box
Stoper fitting(side alignment pushers and front side pushers)
Take-off leg Installation Instruction
58
35 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Check the columns position whether clash with other equipment and pit
Leveling and touch up when installation complete
Pallet conveyor
When complete Stacker installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Take-off leg Installation Instruction
58
Pallet conveyor
AJ59-010COR
1
90% assembled,10% site installation
~2Ton
Fork lift,Crane(if forklift does not allow lifting)
36 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Tool
Team
Foundation Layout
General installation
Hydraulic car,drill set,spanner,hammer,
2-3 installers
Equipment position and fitting with anchor bolt
Leveling
Motors
 Note: The equipment located in a pit, check the pit position whether clash with other equipment then fit
Leveling and touch up when installation complete
Duct collector
Take-off leg Installation Instruction
58
37 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
When complete Stacker installation
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Take-off Dust collector(TODC)
AJ90
1
20% assembled,80% site installation
~11Ton
Fork lift,Crane(>20Ton),bomlift(>12FT)
Hydraulic car,drill set,spanner,hammer,
4-6 installers,1 welder
Equipment position and fitting with anchor bolt
Structure connection
Body connection
Ladder and handrail installation
Inlet and outlet pipes connection
Fan position and connection with stack
Pneumatic connection from cylinders to pneumatic box
Motors
Safety covers
Take-off leg Installation Instruction
58
38 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
39 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
40 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: The equipment located in a pit, check the pit position whether clash with other equipment then fit
Leveling and touch up when installation complete
Duct collector from other project site
Take-off leg Installation Instruction
58
41 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
42 /
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Instruction
Safety fence
When complete Take-off installation(this work could work in parallel with equipment installation)
Take-off leg Installation Instruction
58
43 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Equipment Name
GMT Tag number
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
Safety fence
N/A
1
0% assembled,100% site installation
~6Ton
Fork lift
Hydraulic car,drill set,spanner,hammer,
4 installers
As per safety fence map(layout)
Place all safety post as per site condition
Drilling for the post
Fence fitting
Manual gate fitting
Interlock gate fitting
Segregation fence fitting
Take-off leg Installation Instruction
58
44 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
45 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: Check the columns position whether clash with other equipment and pit
Leveling and touch up when installation complete
Electrical(Cabinet,panels,cable tray,instrument)
When complete equipment installation(could also work in parallel with equipment installation
Equipment Name
GMT Tag number
Take-off leg Installation Instruction
58
Electrical connection(Cable and cable trays)
46 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
LS Number
Unit
Installation condition
Weight
Mobile Tool
Tool
Team
Foundation Layout
General installation
1
90% assembled,10% site installation
~ Ton
Fork lift,bomlift(>12FT)
Electrical tackles
4-6 electrical worker
Cabinet position and fitting(6 units)
I/O panel position and fitting(6 units)
Operation panel position and fitting(5units)
HMI position and fitting(1 unit)
Cable connection (power and control)
Cable tray fitting (power and control)
Instrument fitting with sensor brackets and posts
Instrument connection from sensor to I/O panel
Cable connection from pneumatic box to I/O panel
Other connections
Sensor fitting(approaching sensor;light barrier,safety pull wire,interlock gate,
Photoelectric switch,etc)
Take-off leg Installation Instruction
58
47 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
48 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
49 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
50 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
51 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
52 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
53 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
54 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
55 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
 Note: It is under supervision by the contractor to guide the local team
Take-off leg Installation Instruction
58
56 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Other activities
Other general request for installation
Equipment Name
Mobile Tool
Tool
Team
Foundation Layout
Request
Full Take-off
TBC
TBC
4-6 installers
Equipment modification
Request from plant and site engineers
 Note: The duration should also consider commissioning and operation period
Take-off leg Installation Instruction
58
57 /
Instruction
作业指导书编号
Appendix
文件号
Doc Code
版本
Version
G2022-02
Take-off
A
Take-off leg Installation Instruction
58
58 /