Nº 10 | Mayo May 2014 Nº 10 Mayo | May | 2014 | 15 e Español | Inglés | Spanish | English FuturENERGY PROYECTOS, TECNOLOGÍA Y ACTUALIDAD ENERGÉTICA PROJECTS, TECHNOLOGIES AND ENERGY NEWS FuturENERGY verde E pantone 356 C verde N pantone 362 C verde E pantone 368 C allo R pantone 3945 C naranja G pantone 716 C rojo Y pantone 485 C PROYECTOS, TECNOLOGÍA Y ACTUALIDAD ENERGÉTICA PROJECTS, TECHNOLOGIES AND ENERGY NEWS COGENERACIÓN | CHP REDES URBANAS DE FRIO Y CALOR | DHC NETWORKS REPORTAJE | PLANT REPORT: ECOENERGIES BARCELONA EFICIENCIA ENERGÉTICA: SECTOR RESIDENCIAL | ENERGY EFFICIENCY: RESIDENTIAL SECTOR En Portada | Cover Story DF ORIENTA SU ACTIVIDAD EN EL ÁREA DE ENERGÍA HACIA EL NORTE DE ÁFRICA Y ORIENTE MEDIO La adjudicación a Duro Felguera (DF) del proyecto para la construcción llave en mano de la central de ciclo combinado de Djelfa, en Argelia, permite a la compañía acceder por vez primera en el ámbito energético a los mercados del Norte de África, un área geográfica donde se prevén importantes inversiones en generación y en la que existen expectativas de negocio para los próximos años. Al mismo tiempo, DF ha reforzado su presencia en Oriente Medio con la apertura de nuevas oficinas con el fin de detectar nuevas oportunidades de negocio en las áreas de la energía y el Oil&Gas. La empresa sigue avanzando, asimismo, en los trabajos de construcción de las centrales de Carrington, en el Reino Unido; Vuelta de Obligado, en Argentina e India Urquía, en Venezuela, además de la labores de rehabilitación de la central térmica Endesa Costanera, también en Argentina. DF ha comenzado a ejecutar en Argelia el proyecto para la central de ciclo combinado de Djelfa, la de mayor potencia de cuantas ha instalado la empresa asturiana hasta la fecha, ya que superará los 1.200 MW. El alcance del proyecto para DF contempla el desarrollo de los trabajos de ingeniería, suministros, construcción y puesta en marcha de la central, que se levantará en las proximidades de la población de Ain Oussera, en la región de Djelfa, 150 km al sur de Argel. El proyecto contempla asimismo los sistemas del BOP necesarios para el funcionamiento de la central, tales como aire comprimido, circuitos de refrigeración, planta de tratamiento de agua y efluentes, tanques de almacenamiento, sistema de tratamiento de combustibles, sistemas eléctricos y de control, etc. La firma de este contrato con la compañía argelina Societé de Production de Electricité (SPE), filial del grupo Sonelgaz, permite a DF entrar en los mercados del Norte de África dentro del área energética, en la que se prevé una importante actividad inversora durante los próximos años. Desde que comenzó su actividad en este segmento de negocio, la empresa española ha ejecutado bajo la modalidad llave en mano más de 50 proyectos de generación, principalmente centrales en ciclo simple y ciclo combinado, en numerosos países de Latinoamérica y Europa, con una potencia instalada que supera los 21.000 MW. www.futurenergyweb.es The award to Duro Felguera (DF) of the project for the turnkey construction of the Djelfa combined cycle plant in Algeria gives the company access for the first time - in energy terms - to markets in North Africa, a geographical area where significant investments in energy production are expected and where business prospects look good for the coming years. At the same time, DF has strengthened its presence in the Middle East, opening up new offices to identify new business opportunities in the areas of energy and oil & gas. The company also continues to make progress in plant construction: the Carrington plant in the UK; Vuelta de Obligado in Argentina; and India Urquía in Venezuela, in addition to the refurbishment work on the Endesa Costanera thermal power plant, also in Argentina. DF Sede Central Avda. Byron, 90 Parque Científico Tecnológico 33203 Gijón- Asturias Tfno.: + 34 985 199 000 www.dfdurofelguera.com La configuración seleccionada para el proyecto es la de 2x(2x1), lo que supone la instalación de cuatro turbinas de gas (“dual fuel” para poder emplear tanto gas como gasoil) y dos turbinas de vapor, todas ellas con sus correspondientes alternadores asociados. Asimismo, se contempla la instalación de cuatro calderas de recuperación de calor. La tecnología seleccionada por la propiedad para la central es la 9FA de General Electric. 6 DF FOCUSES ITS ENERGY BUSINESS ON NORTH AFRICA AND THE MIDDLE EAST Actualmente, DF está presente también en el Reino Unido, donde construye una central eléctrica de ciclo combinado, CCGT Carrington, al sur oeste de Manchester. El proyecto incluye el diseño y la construcción de una central eléctrica a gas de 880 MW ubicada en parte de un emplazamiento previamente ocupado por la antigua central eléctrica de carbón, que dejó de funcionar en 1992 y fue demolida posteriormente. DF has now embarked on the project in Algeria for the Djelfa combined cycle plant, the most powerful plant the Asturian company has installed to date, over 1,200 MW. The scope of the project for DF includes engineering, procurement, construction and commissioning, and will be built in the vicinity of the town of Ain Oussera in the Djelfa region, 150 km south of Algiers. The configuration selected for the project is 2x (2x1), which translates into installing four gas turbines (“dual fuel” for use with both gas and diesel) and two steam turbines, each with their corresponding associated generators. In addition, four heat recovery boilers will be installed. The technology selected by the proprietors for the centre is General Electric’s 9FA. The project also involves BOP systems required for operating the plant, such as compressed air, cooling systems, a water and effluent treatment plant and storage tanks, a fuel treatment system, and electrical and control systems, etc. Signing this contract with the Algerian company Societé de Production de Electricité (SPE), a subsidiary of the Sonelgaz group, takes DF into the North African markets in the energy sector, which is expected to see significant investment during the coming years. Since it began operations in this business segment, the Spanish company has undertaken more than 50 turnkey power plant projects, mainly simple and combined cycle plants in many Latin American and European countries, totalling an installed capacity of over 21,000 MW. Currently, DF is also present in the UK, where it is building the Carrington combined cycle CCGT power plant, south-west of Manchester. The project includes the design and construction of an 880 MW gas-powered plant, based in part on a site previously occupied by the old coal-powered plant, which shut down in 1992 and was subsequently demolished. The plant is owned by Carrington Power Limited (CPL), which belongs to the Electricity Supply Board (ESB), the state electricity company in Ireland. In September 2012 CPL assigned construction of the new plant to a consortium FuturEnergy | Mayo May 2014 The plant consists of two single-axle 440 MW units, including the GT26 gas turbine, two steam turbines and the generator. All the turbines are Alstom Power produced, which DF has extensive experience working with for several years on various projects in Spain and the UK. El propietario de la planta es Carrington Power Limited (CPL), propiedad de Eletricity Supply Board (ESB), la empresa estatal de electricidad de Irlanda. CPL asignó en septiembre de 2012 la construcción de la nueva central a un consorcio formado por Alstom Power y DF en la modalidad de un contrato llave en mano. DF es responsable de la ingeniería, adquisición, transporte y puesta en marcha de los equipos de BOP, así como toda la obra civil y montaje electromecánico. La central consta de dos unidades monoeje de 440 MW que incluyen la turbina de gas GT26, dos turbinas de vapor y generador. Todas las turbinas son marca Alstom Power, con las que DF tiene una amplia experiencia al haber trabajado con ellas durante varios años en diversos proyectos en España y Reino Unido. Después de la orden de proceder y a lo largo de 2013, DF ha desarrollado la ingeniería de detalle y se han colocado las órdenes de compra de los equipos y materiales principales bajo su alcance. Además, los principales trabajos de hormigonado se ejecutaron también durante 2013 con el fin de permitir el arranque de los trabajos de montaje de estructuras y montaje electromecánico a principios de 2014. La finalización de la central está programada para finales de 2015 y, una vez en operación comercial, se espera que satisfaga las necesidades de alrededor de un millón de hogares. Con este proyecto DF reafirma su presencia en el sector energético en el Reino Unido, que se inició en 2008 cuando se le adjudicó el montaje de los trenes de potencia de Langage Energy Center (850 MW), Plymouth. Al año siguiente llevó a cabo el montaje de los cuatro trenes de potencia y calderas de recuperación del segundo mayor ciclo combinado de gas del Reino Unido, la central eléctrica de Staythorpe (1.708 MW), en Nottingham. En Argentina, la empresa prosigue los trabajos de construcción de la central de Vuelta de Obligado, 800 MW, situada en la localidad de Timbúes (provincia de Santa Fe). La empresa es responsable de la ingeniería, el suministro de los equipos principales del BOP de la central, la obra civil, el montaje electromecánico y la puesta en marcha. After the order to proceed and throughout 2013, DF has developed the detail engineering, and orders have been placed for the main equipment and materials within their remit. In addition, major concreting work was also done during 2013, to be able to start erecting structures and electromechanical assembly in early 2014. Completion of the plant is scheduled for late 2015 and once in commercial operation, it is expected to meet the needs of about one million homes. With this project DF reaffirms its presence in the UK energy sector, which began in 2008 when the company won assembly of the power trains at Langage Energy Centre (850 MW), Plymouth. The following year it installed four power trains and recovery boilers for the UK’s second largest gas combined cycle plant, the Staythorpe plant (1,708 MW) in Nottingham. In Argentina, the company continues with the construction of the 800 MW Vuelta de Obligado plant, located in the town of Timbúes (province of Santa Fe). The company is responsible for the engineering; the supply of main plant equipment for the balance of plant (BOP), civil works, electromechanical assembly and commissioning. This project reinforces DF’s position in Argentina, where in recent years the company has built the Genelba open cycle plant and the San Martín and Manuel Belgrano combined cycle plants, and is currently in charge of operation and maintenance of the Belgrano. So, with the construction of the Vuelta de Obligado plant, the Spanish group will have installed 2,550 MW in this country. Also in Argentina, DF’s Services area is tackling the refurbishment work on the Endesa Costanera thermal power plant (Buenos Aires), one of the most powerful in Latin America. It is also moving forward with the construction of the1,080 MW India Urquía combined cycle plant (formerly Termocentro), on the outskirts of Caracas (Venezuela). También en Argentina, la línea de Servicios de DF está acometiendo los trabajos de rehabilitación de la central térmica de Endesa Costanera (Buenos Aires) una de las de mayor potencia de Latinoamérica. Asimismo, avanza en la construcción del ciclo combinado de India Urquía (antes Termocentro), en las cercanías de Caracas (Venezuela), con 1.080 MW de potencia. FuturEnergy | Mayo May 2014 Este nuevo proyecto refuerza la posición de DF en Argentina, donde la compañía ha ejecutado en los últimos años la central de ciclo abierto de Genelba Plus y los ciclos combinados de San Martín y Manuel Belgrano, siendo actualmente responsable de la operación y el mantenimiento de este último. Con la construcción de la central de Vuelta de Obligado, el grupo español habrá instalado en este país 2.550 MW. En Portada | Cover Story formed by Alstom Power and DF, under a turnkey contract. DF is handling the engineering, procurement, transportation and commissioning of BOP equipment, as well as all civil works and electromechanical assembly. www.futurenergyweb.es 7