PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 17 DE MARZO DE 2015 MES: MARZO 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-03-15 02-03-15 03-03-15 04-03-15 05-03-15 06-03-15 07-03-15 08-03-15 09-03-15 10-03-15 11-03-15 12-03-15 13-03-15 14-03-15 15-03-15 16-03-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 552.408 553.259 553.405 552.085 554.872 555.194 557.082 554.585 554.520 555.186 552.092 550.852 550.806 550.742 552.312 552.146 128.241 129.098 128.345 127.644 128.404 127.688 128.411 126.796 127.424 127.491 125.357 125.249 124.860 124.959 124.896 124.674 424.167 424.161 425.059 424.441 426.468 427.506 428.672 427.789 427.097 427.695 426.735 425.604 425.946 425.782 427.415 427.471 -166 -222 56 17-03-15 18-03-15 19-03-15 20-03-15 21-03-15 22-03-15 23-03-15 24-03-15 25-03-15 26-03-15 27-03-15 28-03-15 29-03-15 30-03-15 31-03-15 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP. , Bloque-57: continúa pozo ShushufindI-C250 problemas eléctricos, pozo PROMEDIO MARZO 2015 REAL 553.222 126.846 426.376 PROMEDIO MARZO 2015 META 586.680 121.823 464.857 DIFERENCIA REAL-META MARZO 2015 -33.458 5.023 -38.481 % DE META EN MARZO 2015 94,3% 104,1% 91,7% Secoya-22 apagado 12 horas ingreso a W.O. pozos Atacapi-16, 7 apagados por cambio de bomba, Bloque-18: continúa Pozo Palo Azul C48 cerrado por falla de operación y pozo Palo Azul D34 cerrado por daño mecánico (rotura casing), Bloque-12: 10 pozos cerrados por bajo flujo, 11 Pozos cerrados por mantenimiento en equipos de generación eléctrico y 4 pozos cerrados por daño mecánico en equipo, Bloque-15: 9 pozos cerrados por daño mecánico (rotura casing), 31Pozos cerrados por fallas eléctricas en bombas BES,19 pozos con limitación de producción - bajo, Bloque-7: pozo Oso-G84 cerrado por ingreso a W.O., pozo Oso-A59H con limitación de producción, Oso-A45 cerrado por problemas mecánicos, Bloque-31: continúa pozo Apaika-A9 cerrado por trabajo de W.O., Bloque-44: pozo Pucuna-16D cerrado por tiempo indefinido, Bloque-61: pozo Yuca-7 apagado 16hrs por variación de voltaje + cambio de cable de superficie, pozo Yulebra-20 apagado 6 horas por variación de voltaje. *CIA. CONSORCIO PALANDA YUCA SUR, Pozos: LLumpak-2D cerrado para build-up. Continúa, Yuca Sur-1 posible hueco en tubería, esperando reacondicionamiento,Yuca Sur-11-4-8D-9D cerrado por 4 horas para realizar trabajos de cambio de transformador de 920KVA. *CIA. REPSOL ECUADOR S.A., 4 pozos cerrados temporalmente por restricción de producción por facilidades ( alto nivel de agua en tanques). Además pozos: Amo-B9 -B8 cerrado 24 horas por baja producción (esperando reacondicionamiento), Daimi-A12-A9, Iro-A8 e Iro-A9 cerrado esperando reacondicionamiento, Capiron A9 cerrado por falla en bomba de inyección, Amo-A109 cerrado ralizando trabajos de reacondicionamiento. *CIA. PETROBELL, Pozos: Cachiyacu-1 ciontinúa cerrado por problemas con la Comunidad, Tigüino-01ST12-7-12-13RE1-17-8H -6RE1cerrados temporalmente por problemas del generador, Tigüino-20 cerrado 24 horas por trabajos con Unidad Wire Line. *CIA ENAP SIPEC Pozos: MDC-17H pozo en evaluación, Paraiso-05-17-21-22 cerrados por bajo aporte. *CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8 continúa cerrado esperando reacondicionamiento, Hormiguero-31ST1 y Nantu-10 cerrado 24 horas por bajo aporte, Tapir Norte-03 cerrado por 5 horas por Reubicación de equipos de superficie, Hormiguero-7AH cerrado 24 horas esperando racondicionamiento. *CIA. RIO NAPO, Pozos : Sacha Sur-424 cerrado por 3 horas por problemas de generación eléctrica, Sacha- CIAS./CONTRATOS PRODUCCION ACTUAL 011 cerrado por una hora para limpieza de turbina y Sacha-440 bajo aporte por disminución de presión. + 4 pozos cerrados por reacondicionamiento. *CIA. TECPECUADOR S.A., Pozos: Bermejo Sur-8 en espera de trabajos de pulling, Bermejo Norte-19 y PETROAMAZONAS EP RIO NAPO 352.889 74.582 COMPAÑIAS PRIVADAS 124.674 TOTAL PETROLEO NETO 552.146 El Rayo-5 pozos en observación. PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: MARZO 2015 FECHA DE REPORTE: 17 DE MARZO DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-03-15 350.450 73.717 424.167 02-03-15 03-03-15 04-03-15 05-03-15 06-03-15 07-03-15 08-03-15 09-03-15 10-03-15 11-03-15 12-03-15 13-03-15 14-03-15 15-03-15 350.386 351.256 350.601 352.566 353.591 354.768 353.886 353.096 353.534 352.247 351.113 351.462 351.346 352.890 352.889 73.775 73.803 73.840 73.902 73.915 73.904 73.904 74.000 74.161 74.488 74.491 74.485 74.436 74.525 74.582 16-03-15 17-03-15 18-03-15 19-03-15 20-03-15 21-03-15 22-03-15 23-03-15 24-03-15 25-03-15 26-03-15 27-03-15 28-03-15 29-03-15 30-03-15 31-03-15 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 352.889 74.582 427.471 424.161 425.059 424.441 426.468 427.506 428.672 427.789 427.097 427.695 426.735 425.604 425.946 425.782 427.415 427.471 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: MARZO 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-03-15 963 2.818 4.903 2.843 2.670 12.203 29.030 34.785 11.949 13.821 7.713 1.168 2.248 1.125 128.241 02-03-15 960 2.839 4.916 2.842 2.670 12.189 29.859 34.632 11.992 13.850 7.700 1.301 2.243 1.103 129.098 03-03-15 966 2.776 4.861 2.840 2.683 12.004 29.407 34.729 11.999 13.839 7.685 1.223 2.233 1.100 128.345 04-03-15 965 2.777 4.899 2.809 2.687 11.905 28.667 34.846 12.004 13.777 7.675 1.243 2.232 1.158 127.644 05-03-15 965 2.822 4.893 2.743 2.697 12.108 28.948 35.075 12.005 13.824 7.674 1.282 2.235 1.134 128.404 06-03-15 957 2.770 4.385 2.743 2.425 12.204 29.364 35.204 12.002 13.317 7.670 1.277 2.236 1.135 127.688 07-03-15 960 2.785 4.875 2.714 2.687 12.203 29.458 35.083 12.004 13.307 7.660 1.286 2.236 1.153 128.411 08-03-15 961 2.787 4.865 2.703 2.695 12.004 28.504 34.642 11.996 13.359 7.610 1.281 2.236 1.153 126.796 09-03-15 961 2.802 4.862 2.678 2.567 12.180 29.665 34.203 11.978 13.270 7.610 1.272 2.234 1.141 127.424 10-03-15 958 2.812 4.812 2.680 2.591 12.100 29.373 34.524 11.968 13.408 7.610 1.277 2.235 1.143 127.491 11-03-15 956 2.815 4.821 2.622 2.610 11.706 29.019 33.306 11.959 13.344 7.590 1.302 2.231 1.076 125.357 12-03-15 953 2.806 4.817 2.647 2.613 11.652 29.464 32.887 11.955 13.302 7.510 1.301 2.237 1.104 125.249 13-03-15 952 2.793 4.795 2.553 2.336 11.656 29.609 32.775 11.956 13.289 7.501 1.296 2.230 1.118 124.860 14-03-15 948 2.858 4.783 2.553 2.484 11.602 29.705 32.644 11.928 13.353 7.501 1.294 2.234 1.072 124.959 15-03-15 949 2.806 4.618 2.539 2.223 11.707 29.749 32.801 11.915 13.495 7.501 1.282 2.235 1.077 124.896 16-03-15 951 2.789 4.790 2.410 1.872 11.643 29.765 33.078 11.891 13.381 7.461 1.281 2.236 1.125 124.674 958 2.804 4.806 2.683 2.532 11.942 29.349 34.076 11.969 13.496 7.604 1.273 2.236 1.120 126.846 PROMEDIO MARZO 2015 META 803 2.465 4.749 1.820 2.795 12.039 28.707 30.001 11.931 12.317 10.394 1.107 1.009 1.686 121.823 DIFERENCIA REAL -META MARZO 2015 155 339 57 863 -263 -97 642 4.075 38 1.179 -2.790 166 1.226 -566 5.023 % DE META MARZO 2015 119,3% 113,7% 101,2% 147,4% 90,6% 99,2% 102,2% 113,6% 100,3% 109,6% 73,2% 115,0% 221,5% 66,4% 104,1% 17-03-15 18-03-15 19-03-15 20-03-15 21-03-15 22-03-15 23-03-15 24-03-15 25-03-15 26-03-15 27-03-15 28-03-15 29-03-15 30-03-15 31-03-15 PROMEDIO MARZO 2015 REAL