Highway DEIS
Alternatives
The highway alternatives include the No-Action Alternative and
four build alternatives. Two of these build alternatives are
located on the existing I-70 alignment (Alternatives A and B) and
two are located on the realignment (Alternatives C and D).
Alternatives A and C add additional general purpose lanes while
Alternatives B and D add either additional general purpose lanes
or new toll lanes depending on the location in the corridor.
Highway alternatives being evaluated in the DEIS include:
' No-Action Alternative - Reconstruct the viaduct between
Brighton Boulevard and Colorado Boulevard without adding
lanes
' DEIS Alternative A - General purpose lanes on existing I-70
alignment
' DEIS Alternative B - Toll lanes on existing I-70 alignment
' DEIS Alternative C - General purpose lanes on I-70
realignment
' DEIS Alternative D - Toll lanes on I-70 realignment
Different options are being evaluated in some of the alternatives.
These options include adding one or two general purpose lanes in
each direction between I-25 and I-270, shifting to the north or
south between Brighton Boulevard and I-270, using the existing
level (viaduct) or below grade between Brighton Boulevard and
Colorado Boulevard, and two options for connecting the
realignment to existing I-70 near Brighton Boulevard.
No-Action Alternative
Viaduct Replacement
La Alternativa de No Acción de
la Reconstrucción del Viaducto
Viaduct Replacement Construction Phasing
Reconstrucción del Viaducto en Fases
Existing viaduct removed during phase 1
Viaducto existente removido durante la fase 1
New bridge/Puente nuevo
Existing viaduct/Viaducto existente
I-70
I-70
Existing ground/Terreno existente
46th Ave
46th Ave
Phase 1/Fase 1
Existing viaduct removed during phase 2
Viaducto existente removido durante la fase 2
New bridge/Puente nuevo
I-70
I-70
Existing ground/Terreno existente
46th Ave
46th Ave
Phase 2/Fase 2
New bridge/Puente nuevo
New bridge/Puente nuevo
I-70
I-70
46th Ave
46th Ave
Existing ground/Terreno existente
Phase 3/Fase 3
The information shown on this exhibit highlights conceptual work in progress and is subject to change as the environmental impact statement process continues.
La información mostrada en esta exhibición destaca el progreso del trabajo conceptual y es susceptible a cambiar conforme continue el proceso del informe de impacto ambiental.
A cooperative effort between FHWA, FTA, CDOT, RTD, and Denver
Un esfuerzo cooperativo entre FHWA, FTA, CDOT, RTD, y Denver
No-Action Alternative Viaduct Replacement
La Alternativa de No Acción de la Reconstrucción del Viaducto
The No-Action Alternative normally includes short-term safety
and maintenance improvements that maintain the continuing
operation of the roadway. Because of the condition of the
existing viaduct between Brighton Boulevard and Colorado
Boulevard, the No-Action Alternative for the I-70 East Corridor
EIS includes replacing the viaduct in this area. This
replacement is necessary to maintain the continuing
operation of I-70 and does not include any additional travel
lanes. Replacing the viaduct will require a shift to the north or
the south.
La Alternativa de la No Acción normalmente incluye seguridad
de corto plazo y mejoramientos del mantenimiento, que
mantienen la conitnua operación de la calzada. Debido a la
condición del viaducto existente entre Brighton Boulevard y
Colorado Boulevard, la Alternativa de No Acción para este
proyecto incluye reemplazando el viaducto en esta área. El
reemplazamiento es necessario para mantener la continua
operación del I-70 y no incluye carriles adicionales. Para
reemplazar el viaducto se requiere un cambio hacia el norte o
hacia el sur.
Brighton
Boulevard
No-Action Alternative (shifting north or south)
Alternativa de No Acción (cambiar al norte o sur)
Legend/Leyenda
Shift North/Cambiar Norte
Shift South/Cambiar Sur
INTERSTATE
The information shown on this exhibit highlights conceptual work in progress and is subject to change as the environmental impact statement process continues. / La información mostrada en esta exhibición destaca el progreso del trabajo conceptual y es susceptible a cambiar conforme continue el proceso del informe de impacto ambiental.
A cooperative effort between FHWA, FTA, CDOT, RTD, and Denver / Un esfuerzo cooperativo entre FHWA, FTA, CDOT, RTD, y Denver
Colorado Boulevard
Steele
Street/
Vasquez
Boulevard
York Street
70
No-Action Alternative Viaduct Replacement
La Alternativa de No Acción de la Reconstrucción del Viaducto
Replacing the viaduct would need to happen in phases.
The graphics on the following board show one option for
how the viaduct could be replaced.
La reconstrucción tendría que ser construida en fases. Las
gráficas en esta exhibición muestran una opción de como
se puede reconstruir el viaducto.
Phase 1:
' Step 1 - Build a new bridge section on one side of the
existing viaduct
' Step 2 - Temporarily transfer
one direction of I-70 traffic to
the newly built bridge section
' Step 3 - Take down half of
the old viaduct
Fase 1:
' Paso 1 - Construir una sección nueva del puente a un lado
del viaducto existente
' Paso 2 - Temporalmente cambiar el tráfico de una
dirección de la I-70 a la sección de la construcción del
puente nuevo
' Paso 3 - Tumbar parte del viaducto viejo
Phase 2:
' Step 1 - Build a new bridge section where the old viaduct
was just taken down
' Step 2 - Temporarily transfer the other direction of I-70
traffic to the newly built bridge section
' Step 3 - Take down the remaining section of the viaduct
Fase 2:
' Paso 1 - Construir una sección nueva del puente en donde
se tumbó la parte vieja
' Paso 2 - Temporalmente cambiar el tráfico de una
dirección de la I-70 a la sección de la construcción del
puente nuevo
' Paso 3 - Tumbar la parte del viaducto viejo
Phase 3:
' Step 1 - Build a new bridge section where the remaining
section of viaduct was just taken down
' Step 2 - Transfer traffic to its permanent location
Fase 3:
' Paso 1 - Construir una sección nueva del puente donde se
tumbó la parte vieja
' Paso 2 - Cambiar el tráfico a su ubicación permanente
Example of phase 1 - step 1: Broadway bridge reconstruction
Ejemplo de la fase 1 - paso 1: Reconstrucción del puente Broadway
The information shown on this exhibit highlights conceptual work in progress and is subject to change as the environmental impact statement process continues. / La información mostrada en esta exhibición destaca el progreso del trabajo conceptual y es susceptible a cambiar conforme continue el proceso del informe de impacto ambiental.