Which
6 Sigma
'Working
together tomethodology
Make Value Flow' …application should I use?
Traditional
DMAIC
Traditional
DMEDI
Primary Focus
Focuses on the
improvement of a process
Focuses on development
of new products,
services, and processes
or a process that is
“Broken”
A systematic approach (based on the DMAIC
methodology) to achieve sustainable
improvements in People, Quality, Velocity, and
Cost while establishing a continuous
improvement culture.
A 5 day group activity based upon the
DMAIC methodology. A vehicle for driving
quick hit value by implementing “do-now”
solutions through waste elimination.
Tools Required
Utilizes multiple tools &
techniques including
rigorous statistical
methods when needed.
(extensive time required to
analyze data)
Utilizes multiple tools &
techniques including
rigorous statistical
methods when needed.
(extensive time required
to analyze data)
CPS foundational tools like 5S, Standardized
Work, Visual Factory, and 6 Sigma Rapid
Improvement Workshops.
(extensive time required to analyze data) (focus
on Operating, Cultural, & Management systems)
Focuses on quick root cause analysis &
process improvement implementation using
basic statistical tools & Lean tools (focus on
Operating, Cultural, & Management
systems)
Scope
Could consist of the
following: cross depts or
BU’s; >1 key problem;
Y=f(multiple x’s).
(High Complexity)
Could consist of the
following: cross depts or
BU’s; >1 key problem;
Y=f(multiple x’s).
(High Complexity)
VST is a multi-generational approach. The initial
transformation activity lays the groundwork for
continued progress. Value stream mapping,
management systems gap analysis, and cultural
assessment generate action plans consisting of
quick win opportunities, 6 Sigma Rapid
Improvement Workshops (RIW), and 6 Sigma
projects.
Within department; 1 key problem; Y=f(one
x).
(Low Complexity)
Typical Length
Approx. 4 weeks to 26
weeks
Approx. 26 weeks to 78
weeks
Approx. 8 weeks to 16 weeks
9 weeks total - (4 weeks of pre-work; 5 day
RIW; 4 weeks of post-work)
Resources
>3 members available off
& on throughout duration
of project (available @
hour long meetings once
or twice a week)
>3 members available off
& on throughout duration
of project (available @
hour long meetings once
or twice a week)
A cross-functional VST team of employees,
supervisors, support staff, and 6 Sigma black
belts work together, under the leadership and
support of the value stream process owner and
master black belt
6 to 12 cross-functional team members with
at least 2 from the RIW area. All team
members are dedicated fulltime for all 5
days of the workshop. Other SME’s are on
call during RIW.
Capital Cost
May or may not have
significant capital cost
May or may not have
significant capital cost
May or may not have significant capital cost
Requires minimal amount of capital
For Dealers
6 Sigma VST
6 Sigma RIW
1
Caterpillar: Confidential Green
'Working together to Make Value Flow'
…
For Dealers
Caterpillar: Confidential Green
Descargar