Subido por Paul Tello Cespedes

Paul Tello Cespedes CV 2020 INGLES

Anuncio
Paúl Enrique
TELLO CESPEDES
Civil Engineer CIP 128993
paultellocespedes@yahoo.com
+51 978 488 820
Av. Víctor Raúl N° 222 San Andrés V Etapa, distrito de Víctor Larco Herrera – Trujillo
Ca. Compostela N° 141 Dpto. 301 Santiago de Surco - Lima
WHO I AM
Professional (Collegiate), capable of planning, analyzing and supervising continuous improvement in
construction processes, costs and operations, with verifiable experience in civil operations in the areas of
Production and Technical Office (Tenders, Production Engineer, budgeting, payment of payroll,
appraisals); Costs and Improvement Engineering (Planning, quality control).
Willing to take on goals.
PROGRAMAS
IDIOMAS
S10
 Español
Project
 Inglés Intermedio
AutoCad
REFERENCIAS
Gabriel CIRIANI FUSTER
Constructora Mallorca | Gerente General
Teléfono 994 203 145
gciriani@constructoramallorca.com
Marco Antonio GOMEZ SANCHEZ
Constructora Mallorca |
Jefe de Proyectos
Teléfono 975 191 743
marcoantonio@constructoramallorca.com
PROFESSIONAL EXPERIENCE
02/01/2021 –
30/05/2021
INVERSIONES JTN SAC
PLACE: MOTUPE
Ing. Resident
Achievement
29/05/2020 –
03/08/2020




Achievement To carry out 05 fish farms Perform
The earthwork, the one covered with geotextile and geomembrane.
Optimize staff performance.
Analyze the costs incurred on site and value the payments.
INVERSIONES ROGA SAC
PLACE: Lagunas Norte Barrick - Quiruvilca
Field and Safety Engineer
Achievement



PROJECT COST
24/01/2020 –
28/05/2020
Run 2 km of rich solution pipeline cleaning.
Optimize staff performance.
Analyze the costs incurred on site and value payments.
142,857.14 DOLLARS
NKP CONTRATISTAS GENERALES EIRL
PLACE: Trujillo
Resident Engineer
Achievement



PROJECT COST
02/10/2019 –
19/11/2019
Execute, analyze and optimize the construction processes of the "Extension of the third
level of the CIBERTEC Institute".
Optimize staff performance.
Analyze the costs incurred on site and value payments.
536,659.90 DOLLARS
HIDRO WORKS
PLACE: Villa María del Triunfo – Lima
Resident Engineer
Achievement

PROJECT COST
Execute, analyze and optimize the construction processes of the project PISCINAS
TRAPEZOIDAL CURVADA h = 1.10m and CIRCULAR F 12.0m h = 0.525m, VILLA MARIA DEL
TRIUNFO - SACYR
428,571.42 DOLLARS
01/04/2018 –
30/08/2019
CONSTRUCTORA MALLORCA SAC
PLACE: Miraflores – Lima
Resident Engineer
Achievement




PROJECT COST
01/07/2017 –
31/06/2018
Execute, analyze and optimize the construction processes of the Multifamily “San
Fernando”.
Work with the urban parameters of the Miraflores area.
Optimize staff performance.
Analyze the costs incurred on site and value payments.
571,428.57 DOLLARS
INVERSIONES JTN SAC
Resident Engineer
Achievement




01/06/2015 –
01/06/2017
Creation of recreational services in Park N ° 3 in the A.H. Simón Bolivar Plot C Ensenada
Sector, Puente Piedra district - Lima - Lima ”, with snip code 242282
• Installation of the I.E. Children's Carousel, Puente Piedra, Puente Piedra district, Lima
Province, Lima department "
• improvement of the educational service at the primary level of the i.e. n 5168 rosa luz
in the Rosa Luz residential development, Tambo Inga Oeste sector, Puente Piedra Lima
district - Lima II stage
• Improvement of primary education services in the educational institution n ° 3071
Manuel García Cerrón - Cercado Sector, Puente Piedra district - Lima - Lima II stage
snip 360366 "
INGENIERIA Y CONSTRUCCIONES INKA SAC
Chief of Operations and Resident Engineer
Achievement






PROJECT COST

Urban development of 2 hectares for the construction of 6 flats towers, 14 houses,
swimming pool and common areas.
Construction of Las Palmeras de Bocapan Condominium - Tumbes (6 flats towers and
14 houses)
Analyze and optimize construction processes.
Optimize staff performance.
Analyze the costs incurred on site and value payments.
Define the suppliers to hire, analyze and hire companies that provide the outsourcing
service.
2,285,714.28 DOLLARS
19/03/2015 –
18/05/2015
SERVICIOS GENERALES SSV EIRL
PLACE: Comunidad Nativa Peruanito –Trompeteros - Iquitos
Resident Engineer
Achievement




PROJECT COST
01/07/2014 –
12/02/2015
Construction of Elevated Concrete Tank (12 m high).
Analyze and optimize the construction processes of the Elevated Tank
Optimize staff performance.
Analyze the costs incurred on site and value payments.
81,568.45 DOLLAR
TEPSI ANDINA SAC
PLACE: Lote 8 –Trompeteros - Iquitos
Civil Engineer
Achievement

Preparation of Technical Files (Community Venue, Posts, Sidewalks, Sanitation, School
Venue, Force Booth, Pedestrian Bridges)
Preparation of civil works planning and initial requirement of materials.
Preparation and supervision of costs and budgets of civil works in execution.
Preparation of valuations and additional with the internal and external client of the
company.
Monitoring and Control of Progress of Civil Works in office and on site.

Supervision of work in the field.




1/8/2013 –
30/06/2014
INVERSIONES INMOBILIARIAS MILLENIUM SAC.
PLACE: LIMA
Civil Engineer
Achievement
PROJECT COST
1/2/2013 –
31/7/2013






Multi-family “AURORA” with 2 basements, 5 floors and a roof terrace
Analyze and optimize the construction processes of the Multifamily “AURORA”.
Work with the urban parameters of the area.
Optimize staff performance.
Analyze the costs incurred on site and value payments.
Make building declarations (demolition and building).
 661,172.311 DOLLARS
GRINSA SRL.
PLACE: TRUJILLO
Project Manager
Achievement
FUNCTIONS
Monto




Multi-family “Santa Bárbara”
Multifamily "Los Lirios"
Preparation of proposals for state and private tenders.
Preparation of files for the program My Home (Own Site and Own Roof).



Supervise, plan and prepare files for buildings and bids for private and state works.
Resident Engineer of the Multifamily ‘’ Santa Bárbara ’’.
Control the work costs of the Multifamiliar ‘’ Santa Bárbara ’’.
 452,715.18 DOLLARS
6/8/201231/01/2013
CONSORCIO MINERO HORIZONTE S.A.
PLACE: RETAMAS – LA LIBERTAD
ADMINISTRATOR OF Dams and Tailings ENGINEER
Achievement






Study of Physical and Chemical Stability of Active Tailings Dams and Mine Stripping.
Plan for the Closure of Mining Environmental Liabilities.
Repairs of geomembrane, hdp pipe.
Maintenance of civil works. (accounts)
Preparation of a strategic plan for the Dam and Tailings Adm. Engineer.
Coordination with the OOCC and Plant area for the execution of the new tailings line.
FUNCTIONS

Dam and Tailings Supervisor Engineer.

Environmental supervisor engineer.
1/11/20111/08/2012
CONSTRUCTORA MALLORCA SAC
PLACE: LIMA
Civil Engineer
Achievement




Analyze and optimize the construction processes of the “Hermanos Lobo” Multifamily.
Work with the urban parameters of the San Borja area.
Optimize staff performance.
Analyze the costs incurred on site and value payments.
PROJECT COST

428,571.42 DOLLARS
22/05/201122/10/2011
HAZCO ENVIRONMENTAL SERVICES DEL PERU SAC
PLACE: Abancay, Arequipa
Production Engineer
Achievement
PROJECT COST
10/2010 – 1/2011






Analyze and optimize the construction processes of the Relave Pallancata - Mina
Selene dam. (instrumentation, installation of geomembrane, geotextile, geogrid), by
means of thermofusion process.
Earthmoving of granular material for day shift extracted from blasting.
Provide spread area for the placement of geotextile and geomembrane.
Formation of dumps.
Construction of civil works (roofed canals, gutters and speed bumps)
Optimize the performance of operators and heavy machinery.
Analyze the costs incurred on site and assess the machinery rental payments.

2,285,714.28 DOLLARS

GRINSA.
PLACE: TRUJILLO
Production Engineer
Achievement

Analyze the technical information, supervise the execution of the Operating Budget and
management of the URB project. VILLA SANTA MARIA (328 homes) from the My Home
and Own Roof Program.

Supervise the construction of the multifamily "Los claveles de California"

Rethink the topographic level for the water and sewage facilities.Elaborar licitaciones
públicas y privadas.
PROJECT COST
2/2009 – 8/2010

2,342,857.14 DOLLARS
TENAJ CONSTRUCCION SAC.
PLACE: LIMA
Production Engineer
Achievement

Various jobs at Molitalia and at the Costa los Olivos Plant. (Construction and repairs of
Hangars, Construction and repairs of hygienic services, patching and improvement of
accesses, construction of sardines, construction of slabs, and various services to said
company.)

Construction of the El Verde canal, in the town of Jayanca, Lambayeque Province.

Patching and construction of tracks in the Ate Vitarte district.

Construction of multifamily.

Construction of sardines and sidewalks in San Borja Norte.

Construction of modules in the CAEN-Chorillos high school for military studies.

Data Base was designed for the Administrative area (Analysis of unit costs).
REFERENCES
SCHOOL
C.E.P. “PERPETUO SOCORRO” – (Primary school and high school).
UNIVERSITARIA
“UNIVERSITY PRIVADA ANTENOR ORREGO” – UPAO. (Titled and Collegiate)
Faculty: CIVIL ENGINEERING
Title: CIVIL ENGINEER
SPECIALTY
AND COURSES
S10 – COLEGIO DE INGENIEROS DEL PERU.
Integrated Management System Based on OHSAS 18001: 2007 and ISO 14001: 2004 Standards BEREAU VERITAS
Property sanitation of property No. 2 - TECHNICAL CORPS OF APPRAISALS OF PERU
Property Sanitation and Titling - COLLEGE OF REGISTRARS OF PERU
State Procurement Law No. 30225, Applied to Public Works - CIPCPLL
Descargar