Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
Page No : 1 of 10
1. Purpose :
1. To ensure that the Washing Machine is manufactured fulfilling design
specification at manufacturer's site.
2. To check the basic performance of the machine at manufacturer's site.
2. Scope and References:
1. This protocol is applicable to the Washing Machine manufactured by Talleres
TACOME S.A
3. Procedure:
1. Take out photocopy of the approved protocol for the FACTORY ACCEPTANCE
TEST to be carried at the manufacturer's site.
2. Carry out the below tests mentioned in Table Number 1 at manufacturer's site&
mention the observation in ACTUAL column of the protocol photocopy.
3. In case of any additional information or mode of checking mention in the
REMARKS column.
4. Check the basic operation of the machine.
5. In case any deviation observes during FAT, document it in Observed deviation
section.
6. Ensure that corrective action taken is meeting the user requirement
specification.
7. If deviation is acceptable, document in Observed Deviation section and provide
proper justification.
8. If deviation does not acceptable, inform to manufacturer for necessary action.
9. If deviation is acceptable, provide final conclusion.
10. Ensure that following listed documents are provided.
1. Operational and Maintenance manual
2. Electrical / mechanical schematics diagram
3. Process and utility diagram
4. Critical Spare part list
4. Documentation
All documentation work shall be completed concurrently during execution of theFAT.
However the protocol does not define the sequence of the test/ documentation to be
carried out.
1. Use indelible black / blue ink for the recording.
2. Fill out complete information in the format provided.
3. Do not leave any blank space.
4. Correct the wrong entry by drawing single line through incorrect data,
recording the correct data and then signing and dating the change.
5. Enter “NA” in space that is not applicable.
6. During execution of the protocol any deviation must be implemented as per
defined procedure.
7. During protocol execution, report shall be prepared with following details.
1. Discussion of all study in observation column.
2. FAT is successfully completed or not
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
Page No : 2 of 10
3. Conclusion
4. Recommendation, if any
5. Acceptance criteria:
1.
1.
2.
3.
The Equipments shall fulfill the selection criteria & its purpose of application.
The Equipments shall be as per purchase order.
Accessories received shall be as per purchase order.
The Equipments shall meet Pre-selected design parameters.
6. Verification Sheet:
Sr.
No.
Item/
Parameter
Expectation
1
Make
Talleres TACOME S.A
2
Model
Rame 7 campos
3
Capacity
RAM-7-160
4
Design
Should have basic four parts,
 Inlet system
 Driying system
 Transporting system
 Outlet system
 Electrical components
5
Inlet system
-
-
Safety
System
Foulard
-
Emergency Stop tested
-
All moving parts should be suitably
covered under replaceable
guards or box
-
All electrical connections should
be appropriately numbered and
identified and covered with
suitable guard.

Pneumatic Cylinder
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Damage free
-
Technical tag available

Gearbox and motor
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
Actual
Remarks
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
-
Weft
straightener
Mahlo
Orthopac
RVMC-15
- Scraper
- Inlet platform
- Upper
Overfeeding
- Lower
Overfeeding

Frame
-
Steel Monoblock should be
assembled and damage free
-
Reinforced Rolling element
bearings should be assembled
-
3. Foulard rollers rubber covered
assembled and damage free.
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Damage free
-
Inox AISI 304L Cilinders
-
Inox AISI 304L Scraper
-
Inox AISI 304L Waste Tray
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free

Overfeeding cylinder
-
Cover evidently new and
damage free

Overfeeding 1.5kW motor
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new

Overfeeding cylinder
-
Cover evidently new and
damage free

Overfeeding 2.2kW motor
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
Page No : 3 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
-
-
-
-
-
Edge
cylinders
Side Control
Panel
Motorized
edge opener
guider
Infrared edge
sensors fr-55
Tensor’s guider
- Fabric nailed
system
-
Inox AISI 304L Cilinders
-
CW turn
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free
-
Touch Panel SIMATIC HMI
-
Both sides placed
-
Inox spindle
-
Infrared fotoelectric sensor
controlled
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free

Rubber wheels
-
Both sides placed
-
Rubber cover evidently new and
damage free

Nailed 1.1kW motor
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
Totally assembled
Damage free

Nailing brushes
-
Two brushes both side placed
-
Evidently new
-
Totally assembled
Page No : 4 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
-
Unpinning
watchers
- Automatic
chain greasing
system
Drying system
-
-
-
Safety
System
Stenter
frame
Air flow
System
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free
-
Emergency Stop tested
-
All moving parts should be
suitably covered under
replaceable guards or box
-
- All electrical connections should
be appropriately numbered and
identified and covered with
suitable guard.
-
7 driying fields
-
Side and floor tempeture isolation
-
100mm wide side and ceiling
panels
-
Evidently new
-
Totally assembled
-
Damage free
-
Air flow 7.5kW motors
-
2 motors placed by field
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free
-
Nozzles
-
Galvanized sheet made
-
Evidently new
-
Totally assembled
-
Damage free

By-pass air chambers system
-
Technical tag available
Page No : 5 of 10
boquilla
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
-
-
-
-
Burners
Temperature
Control
Automatic
fabric wide
regulation
Extraction
-
Technical datasheet available
-
Spare part ID available
-
Evidently new

Air flow filters
-
Placed above each burner unit
-
Evidently new
-
Totally assembled
-
Damage free
-
Evidently new
-
Totally assembled
-
Damage free
-
- Type : RTD
-
- Make : Trister
-
- Model : PT - 100
-
Wide regulation 0.75kW motors
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free

General extraction
-
Extraction system placed at both
sides of the frame
-
1.5m spaced
-
Inner dripping tray
-
Extraction fan
-
Two 5.5kW fans placed
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free
Page No : 6 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free
-
4 top nozzle
-
4 bottom nozzle
-
3kW helical fan
-
Air filters
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free
-
Technical tag available
-
Technical datasheet available
-
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free
Fabric
unpinning
discs
-
Evidently new
-
Totally assembled
-
Damage free
Fabric
unpinning
cylinder
-
1.5kW motor
Transporting System
-
Chain
Outlet System
- Air cooling
system
-
-
-
Weft
straightener
Mahlo
Orthopac
MFRC-15
-
Technical tag available
-
Technical datasheet available
-
15
Control Panel
Spare part ID available
-
Evidently new
-
Totally assembled
-
Damage free


Qty. 1 No.
Operation : Through Auto/
ManualMode
Emergency Stop
Manual ON/ OFF switch


Page No : 7 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
16
17
24
25
PLC
 HMI
Safety
Features
 All moving
parts
 All electrical
connections
Documents



Make : Siemens
Model : S7
Qty. 1 No
 Make : Siemens
 Model : SIMATIC
Qty. 1 No
Should be suitably covered
underreplaceable guards or
box
Should be appropriately numbered and
identified and covered with suitable
guard.
Should be available
 Machine
Manual
 MOC
Certificates
Should be available
 Calibration
Certificates
Should be available
 Test and
Guarantee
Certificates
Should be available for Blower, motors
&Filters
Page No : 8 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
7. Observed Deviation
Details of Deviation/ s :
Investigation:
Corrective action:
Acceptable: Yes / No
Deviation Approved by / Date:
Page No : 9 of 10
Factory Acceptance Protocol
Document No :
Equipment :
TACOME STENTER MACHINE
Page No : 10 of 10
8. Conclusion:
FAT CARRIED OUT BY:
IN PRESENCE OF MANUFACTURER:
Date:
Date:
Sign :
Sign :
Name:___________________________
Name:___________________________
Date:
Site address :
Sign :
Name: ___________________________
9. Approval
Name & Designation
Prepared By
Checked By
Approved By
Department
Signature
Date